VASUNDRA CYBER NEST

By C Subramani

RG-KA-07382 · RERA PRM/KA/RERA/1251/310/PR/200811/003515 · Last updated on RERA Karnataka portal: 8 Aug 2020

Source: official RERA Karnataka filing

Red flags

  • Completion date moved by 9 months
  • 1 extension taken

Clear

  • No complaints on record
  • Separate project account declared
Sep 2022Possession promisedmoved 9 months from the original
0Complaints at RERA Karnatakaon this registration
Jump to the 87 documents Report an error

VASUNDRA CYBER NEST is a Residential/Group Housing project by C Subramani in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/200811/003515 on 11 Aug 2020. Possession is promised by 30 Sep 2022. The completion date has moved by 9 months from the original filing.

At a glance

Project

  • NameVASUNDRA CYBER NEST
  • TypeResidential/Group Housing
  • Location
    • Bengaluru South
    • Bengaluru Urban
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/310/PR/200811/003515
  • ReraGenie IDRG-KA-07382

Builder

  • NameC Subramani

Key dates

this monthRegisteredAug 2020First promiseDec 2021Revised toSep 2022

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on11 Aug 2020
  • Promised completion30 Sep 2022
  • Revised completionRevised to 30 Sep 2022 (originally 31 Dec 2021)
  • Buildings3 building records
  • Documents filed87 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BLOCK A---48048
BLOCK B---48048
BLOCK C---48048

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 8 Aug 2020, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)Not applicable
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja work-
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)-
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

As on 8 Aug 2020, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsYes-
Sewage and Drainage SystemYes-
Parks & Tree plantingYes-
Street LightingYes-
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes-
Solid waste management and disposalNoNot applicable
Water conservationNoNot applicable
Energy managementYes-
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesNoNot applicable
Electricity supply transformer and substationYes-
Emergency Evacuation servicesNoNot applicable
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
Club HouseNoNot applicable
Community HallYes-
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolYes-
GymYes-
ParksYes-
Power BackupYes-
GasNoNot applicable
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesNoNot applicable
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementNoNot applicable
TerraceYes-
Outer WallNoNot applicable
Open parking areas and common storage spacesNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area6,852 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 44.72 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectV SIVA KUMAR
EngineerSRINIVAS RAO BOLIMUNTA

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

ExtensionDec 2021 → Sep 2022

No reason recorded in the filing

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed87

As listed on the registration, under the names the promoter filed them with; the newest 80 of 87 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/200811/003515 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
BWSSB NOC AcknowledgementFile: BWSSB NOC ACKNOWLEDGEMENT.pdf8 Aug 2020
BWSSB FEES PAID RECEIPTFile: BWSSB FEES PAID RECEIPT.pdf8 Aug 2020
FOR WP NO 50442 WE ENCLOSED THE HIGH COURT OF KARNATAKA ORDER COPYFile: WP No 50442 COURT ORDER COPY.pdf8 Aug 2020
floor plans Stilt Ground to Third FloorFile: Stilt Grount and First to Third.PDF13 Jul 2020
BWSSB FEES PAID RECEIPTFile: BWSSB FEES PAID RECEIPT.jpeg13 Jul 2020
BWSSB NOC APPLICATIONFile: BWSSB Application IMAGE.jpeg13 Jul 2020
KSPCB NOCFile: KSPCB NOC.pdf13 Jul 2020
BWSSB NOC Applied Application Acknowledgement copyFile: BWSSB NOC APPLICATION ACKNO.jpg3 Jul 2020
BWSSB FEES PAID RECEIPTFile: BWSSB FEES PAID RECEIPT.jpeg3 Jul 2020
Stilt, Ground, First to Third floor plans in PDF FormatFile: Stilt, Grount & First to Third.PDF3 Jul 2020
Site/Terrace Floor Plans in PDF formatFile: Site & Terrace.PDF3 Jul 2020
Plan not opened, mention project head details to be uploaded. SITE & TERRACE PLANFile: Site & Terrace.PDF9 Jun 2020
STILT GROUND to THIRD FLOOR SANCTION PLANFile: Stilt, Grount & First to Third.PDF9 Jun 2020
BWSSB fees paid receiptFile: BWSSB FEES PAID RECEIPT.jpeg9 Jun 2020
1. bank pass book / Statement we have enclosed for vasundra builderFile: Account_statement.pdf19 May 2020
68530/- payment paid bank statementFile: BANK STATEMENT 68520.pdf19 May 2020
C Subramani 1st partner of Vasundra Builder while Applying For RERA Regi we have given Promoter nameFile: Subramani Pan.pdf19 May 2020
BBMP Approved Plan (Stilt Ground First to Third Floor) in PDF FORMAT of VASUNDRA CYBER NEST projectFile: Stilt, Grount & First to Third.pdf19 May 2020
BBMP Approved Plan (Site and Terrace Floor Plan) in PDF FORMAT of VASUNDRA CYBER NEST projectFile: Site & Terrace.pdf19 May 2020
4. Stilt, Ground & First to Third plan is unable to open. - We have uploaded in PDF FormatFile: Stilt, Grount & First to Third.pdf19 May 2020
Point No.1 68520 fee received on 02-03-2020, bank pass book, "We have Enclosed the bank a/c statemenFile: BANK STATEMENT 68520.pdf13 Mar 2020
Sanction PlanFile: Stilt, Grount & First to Third.pdf13 Mar 2020
Sanction PlanFile: Site & Terrace.pdf13 Mar 2020
EC (01-04-2019 to 13-03-2020File: EC 01-04-2019 to 13-03-2020.pdf13 Mar 2020
BWSSB Fee Paid ReceiptFile: BWSSB FEES PAID RECEIPT.jpeg13 Mar 2020
SANCTION PLANFile: Stilt, Grount & First to Third.pdf13 Mar 2020
SANCTION PLANFile: Site & Terrace.pdf13 Mar 2020
Commencement certificate-
Stilt, Grount & First to Third-
Proforma saledeed-
Proforma sale Agreement-
Sale deed No 2350-
Site & Terrace-
PROFORMA Allotment letter-
BROUCHER DEMOO-
SPECIFICCTION-
EC 1-4-2004 to 17-10-2019-
AFFIDIVATE 3(1)-
LAND OWNER JOINT AFFI-
KHATA & KHATA EXTRACT-
JDA-
Unnamed document-
CONVERTION ORDER 1-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Polution Board NOC-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Balance Sheet 2018 - 2019File: BALANCE SHEET - 2018-19.pdf-
Balance Sheet 2017 - 2018File: BALANCE SHEET- 2017-18.pdf-
Balance Sheet 2016 - 2017File: BALANCE SHEET 2016-17.pdf-
Audited Profit and Loss Statement 2018 - 2019File: P & L - 2018-19.pdf-
Audited Profit and Loss Statement 2017 - 2018File: PROFIT & LOSS - 2017-18.pdf-
Audited Profit and Loss Statement 2016 - 2017File: P AND L - 2016-17.pdf-
Cash Flow Statement 2018 - 2019File: CASH - 2018-19.pdf-
Cash Flow Statement 2017 - 2018File: CASH FLOW 2017-18.pdf-
Auditor's Report 2018 - 2019File: AUDITORS REPORT 1 - 2018-19.pdf-
Auditor's Report 2017 - 2018File: AUDIT REPORT - 2017-18.pdf-
Auditor's Report 2016 - 2017File: AUDIT REPORT 1 - 2016-17.pdf-
Income Tax Return Acknowledgement 2018 - 2019File: IT Returns - 2019-20 (1).pdf-
Income Tax Return Acknowledgement 2017 - 2018File: IT Returns - 2018-19-1.pdf-
Income Tax Return Acknowledgement 2016 - 2017File: IT Returns - 2017-18-1.pdf-
FROM B-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one moved by 9 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep VASUNDRA CYBER NEST on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmVASUNDRA CYBER NESTOther 33Dot size: filed unitsN

Filed coordinates, straight-line distance. 33 registered projects within 2 km.

Builder: C Subramani

C Subramani has 1 registration on RERA Karnataka, including VASUNDRA CYBER NEST. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if VASUNDRA CYBER NEST is delayed beyond 30 Sep 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of VASUNDRA CYBER NEST?

The registered promoter entity is C Subramani. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in VASUNDRA CYBER NEST?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at VASUNDRA CYBER NEST?

The professionals named in the filing: Architect: V SIVA KUMAR; Engineer: SRINIVAS RAO BOLIMUNTA. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VASUNDRA CYBER NEST?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VASUNDRA CYBER NEST. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VASUNDRA CYBER NEST to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.