Home / Browse projects / Bengaluru Urban, Karnataka / Vajram Newtown - II

Registration approved Litigation declared Residential/Group Housing project

Vajram Newtown - II

By VAJRAM ESTATES PRIVATE LIMITED

RG-KA-57731 · RERA PRM/KA/RERA/1251/309/PR/060324/006684 · Last updated on RERA Karnataka portal: 15 Oct 2026

Source: official RERA Karnataka filing

Red flags

  • Litigation declared, 1 case
  • 1 complaint at RERA Karnataka

Clear

  • Completion date never moved
  • Separate project account declared
Jan 2028Possession promisedno revision filed
4 of 18Construction stages donefurthest along: RCC or MS Framed structure, 89%
125 of 272Units unsoldnot recorded sold or booked
1Complaints at RERA Karnatakaon this registration
Jump to the 132 documents Report an error

Vajram Newtown - II is a Residential/Group Housing project by VAJRAM ESTATES PRIVATE LIMITED in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/309/PR/060324/006684 on 6 Mar 2024. Possession is promised by 12 Jan 2028. 147 of the 272 units on this registration are recorded sold or booked, and 4 of 18 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameVajram Newtown - II
  • TypeResidential/Group Housing
  • Location
    • Bengaluru North
    • Bengaluru Urban
    • 560064
  • Pincode560064
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/309/PR/060324/006684
  • ReraGenie IDRG-KA-57731

Builder

  • NameVAJRAM ESTATES PRIVATE LIMITED
  • Entity typeCompany
  • GSTIN29AACCV9397A1ZX
  • Authorized SignatoryYandamuri Vamsi Krishna
  • Managing DirectorPavan Kumar Vajram
  • DirectorsPavan Kumar Vajram, Pradeep Kumar Vajram
  • Project HeadD Kumar
  • Other registrations6 more →
  • Declared earlier projects10 →

Key dates

this monthRegisteredMar 2024PromisedJan 2028

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on6 Mar 2024
  • Promised completion12 Jan 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed132 files

Current status

54%147 of 272 units booked
56.8%Of the estimated cost spent so far

Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower - A---2720272

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 18 construction stages are filed complete. The stage furthest along is RCC or MS Framed structure, at 89%.

Building: 41% average across the applicable activities

ActivityProgress
Earth work and other leveling preparation work100%
Foundation footing work100%
Upto Plinth Level100%
Sub-structure flooring (Parking Floor, more than one floor below general ground level)6%
Retaining wall (All types)100%
RCC or MS Framed structure89%
Masonry Construction40%
Plastering inside , outside & Ceiling40%
Joinery: Doors, Windows, Ventilators etc0%
Basic work of Water supply, Sanitary and Electrification8%
Dadoing, Skirting, Flooring, Tiles work (All types)0%
Railing and Grill fixing47%
Electrification, Water supply and Sanitary Finishing46%
Painting46%
Fire prevention and fire fighting fitting and fixture with network0%
Weather Proof work(tile,concrete)2%
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work0%
Internal and External work including landscapes as per sanctioned drawings6%

Progress on shared amenities40

As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes8%
Sewage and Drainage SystemYes8%
Water conservation/rain water harvesting/recharge of ground waterYes8%
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes0%
Solid waste management and disposalYes0%
Emergency Evacuation servicesYes0%
Internal Roads & FootpathsYes4%
Electricity supply transformer and substationYes0%
Storm water drainsYes12%
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)Yes8%
Parks & Tree plantingYes0%
Street LightingYes0%
ElectricityYes39%
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes0%
Club HouseYes0%
Community HallNoNot applicable
Outdoor Sports facilityYes0%
Indoor Sports facilityYes0%
Swimming PoolYes0%
GymYes0%
ParksYes0%
Power BackupYes5%
Piped GasYes0%
Water and SanitationYes0%
Air ConditioningNoNot applicable
StaircasesYes77%
LiftsYes74%
Corridor/LobbiesYes0%
Fire escapesYes0%
Common entrance and exit for the building/common portico/foyer/verandahYes0%
BasementYes99%
TerraceYes0%
Outer WallYes0%
Open parking areasYes0%
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes0%
Common storage spacesNoNot applicable

Land and ownership1

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area9,412 sq m
Named landowners1
LandownerVillageDistrict
Madhu Radhakrishna--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 151.78 cr
Cost incurredRs 86.20 cr
Spent of the estimate56.79%
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 121.11 crRs 64.82 cr
On-site expenditure-Site OverheadRs 14.07 crRs 13.32 cr
Principal sum and interest payable to financial institutions-Non Banking financial institution (NBFC)Rs 4.90 crRs 5.03 cr
Payment of taxesRs 3.25 crRs 3.02 cr
On-site expenditure-Salaries of workersRs 3.00 cr-
On-site expenditure-Cost Of Services(Water, Electricity, Sewage)Rs 3.00 cr-
On-site expenditure-Consultants FeesRs 2.45 cr-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectUrban Frame Pvt Ltd
EngineerRENUKA PRASAD HN [PROPRIETOR OF PRASAD CONSULTANTS]
Chartered AccountantBELLALA AND RAGHAVENDRA

Litigation declared1

CaseCourtStatus
OS No 2430Hon'ble City Civil and Sessions Judge-

Complaints filed with RERA Karnataka1

Case no.ComplainantRespondentFiled
00340/2026-VAJRAM ESTATES PRIVATE LIMITED06/04/2026

Documents filed132

As listed on the registration, under the names the promoter filed them with; the newest 80 of 132 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/309/PR/060324/006684 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: NT-2 Form-4 Q2 26-27.pdf15 Oct 2026
Q2 2026-27 Form-5 Certificate issued by ArchitectFile: NT-2 Form-5 Q2 26-27.pdf15 Oct 2026
Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: NT-2 Form-6 Q2 26-27.pdf15 Oct 2026
Q2 2026-27 Water supply and sewage board15 Oct 2026
Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres)15 Oct 2026
Q2 2026-27 KPTCL- BESCOM15 Oct 2026
Q2 2026-27 Fire and Safety15 Oct 2026
Q2 2026-27 Airport Authority of India15 Oct 2026
Q2 2026-27 BSNL/Telecommunication Department15 Oct 2026
Q2 2026-27 Preventive Order (Injunction / Interim Order / Final Order / Stay OrderFile: Judgement Order 2170 of 2019.pdf15 Oct 2026
Q2 2026-27 Any further orders in this regardFile: Note on the case.pdf15 Oct 2026
Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form-4 Quarterly CA Certificate-Q1.pdf10 Jul 2026
Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Form-5 Architect QU-1 Jun 26, NT-II.pdf10 Jul 2026
Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form-6 engineering certificate - NT-2-Q1.pdf10 Jul 2026
Q1 2026-27 Water supply and sewage board10 Jul 2026
Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres)10 Jul 2026
Q1 2026-27 KPTCL- BESCOM10 Jul 2026
Q1 2026-27 Fire and Safety10 Jul 2026
Q1 2026-27 Airport Authority of India10 Jul 2026
Q1 2026-27 BSNL/Telecommunication Department10 Jul 2026
Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: FORM-4 VAJRAM NEWTOWN 2 Q4 25-26.pdf15 Apr 2026
Q4 2025-26 Form-5 Certificate issued by ArchitectFile: FORM-5 VAJRAM NEWTOWN 2 Q4 25-26.pdf15 Apr 2026
Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: FORM-6 VAJRAM NEWTOWN 2 Q4 25-26.pdf15 Apr 2026
Q4 2025-26 Preventive Order (Injunction / Interim Order / Final Order / Stay OrderFile: Case Note dt 15-04-2026.pdf15 Apr 2026
Q4 2025-26 Any further orders in this regardFile: Case Note dt 15-04-2026.pdf15 Apr 2026
Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form-4.pdf14 Jan 2026
Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Form-5.pdf14 Jan 2026
Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form- 6.pdf14 Jan 2026
Q3 2025-26 Preventive Order (Injunction / Interim Order / Final Order / Stay OrderFile: Judgement Order 2170 of 2019.pdf14 Jan 2026
Q3 2025-26 Any further orders in this regardFile: Note on the case.pdf14 Jan 2026
Clarification Commencement CertificateFile: 2 Clarification Commencement Certificate.pdf6 Mar 2024
ADLR Sketch along with Village mapFile: 3 ADLR Sketch along with Village map.pdf6 Mar 2024
Clarification on SEIAA NOC Area and UnitsFile: 4 Clarification on SEIAA NOC Area and Units.pdf6 Mar 2024
RERA Phase wise demarcation Sketch signed by ArchitectFile: 5 RERA Phase wise demarcation Sketch signed by Architect.pdf6 Mar 2024
CDP Map Tanisandra (Incorporated the Site)File: 1 CDP Map Tanisandra (Incorporated the Site).pdf6 Mar 2024
Relinquishment DeedFile: 6 Relinquishment Deed.pdf6 Mar 2024
Supporting Documents of Sources of FundsFile: Bajaj - NT Phase-2 Sanction letter - 55 cr.pdf27 Feb 2024
Profit and loss account Balance sheet for FY 20-21File: FINANCIALS - FY 2020 21.pdf27 Feb 2024
Profit and loss account Balance sheet for FY 21-22File: FINANCIALS - FY 2021 22.pdf27 Feb 2024
Profit and loss account Balance sheet for FY 22-23File: VEPL FINANCIALS - FY 2022 23 (2)_compressed.pdf27 Feb 2024
EC From 30-11-2022 to till dateFile: EC SY NO 60.pdf27 Feb 2024
Title Deed of Radha Krishna RaoFile: Title DEED NO 2201.pdf27 Feb 2024
Notarized Form BFile: Affidavit-27022024-1.pdf27 Feb 2024
Affidavit about pending litigationFile: Affidavit 2702024-4.pdf27 Feb 2024
Affidavit about pending litigationFile: Affidavit 27022024-2.pdf27 Feb 2024
Affidavit about pending litigationFile: Affidavit 2702204-3.pdf27 Feb 2024
Self declration of carpet areaFile: Point No - 02, Self Declaration on Carpet Areas.pdf27 Feb 2024
Self declaration of FAR AreaFile: Point No - 03, Self Declaration on FAR Areas.pdf27 Feb 2024
CDP Map showing project locationFile: Point No - 04, CDP Map.pdf27 Feb 2024
Village MapFile: Point No - 05, Vajram_Chokkanahalli Village Map.pdf27 Feb 2024
SEIAA NocFile: Point No - 07, Revised SEIAA NOC.pdf27 Feb 2024
KSPCB NocFile: Point No - 08, KSPCB NOC.pdf27 Feb 2024
Development plan orderFile: Point No - 09, Vajram DPO.pdf27 Feb 2024
BBMP Sanctioned drawingFile: Point No - 10, Digital signed sanction drawings.pdf27 Feb 2024
Phasewise demarcationFile: Point No - 11, Phase wise Demarcation Sketch.pdf27 Feb 2024
Amenities calculation detailsFile: Point No - 04, Amenities Calculation Details.pdf27 Feb 2024
Common area detailsFile: Point No - 04, Common Area Calculation Details.pdf27 Feb 2024
Project Engineering self attested copyFile: Point No - 05, Copy of License of Project Engineer.pdf27 Feb 2024
Engineering certificate Form 3File: Point No - 06, Engineer's Certificate Form-3.pdf27 Feb 2024
Estimated cost of constructionFile: Point No - 07, Estimate of Construction Budget.pdf27 Feb 2024
Structural safetyFile: Point No - 08, Structural Safety in Design Certificate.pdf27 Feb 2024
Project SpecificationFile: Point No - 09, PROJECT SPECIFICATIONS.pdf27 Feb 2024
Proforma of Agreement of saleFile: Draft Agreement - Newtown Phase II- RERA Updated Copy.pdf27 Feb 2024
Proforma of Allotment letterFile: Allotment Letter updated.pdf27 Feb 2024
Self Attested - BESCMFile: Point No - 13, Self Attested Copy BESCOM.pdf27 Feb 2024
Self Attested - BWSSBFile: Point No - 13, Self Attested Copy BWSSB.pdf27 Feb 2024
STP DesignFile: Point No - 14, Feasibility Report on STP.pdf27 Feb 2024
STP DrawingFile: Point No - 14, Schematic Diagram for STP.pdf27 Feb 2024
Land cost guideline valueFile: NT -2 Govt Valueation letter (1).pdf27 Feb 2024
Sources of waterFile: Point No - 16, Sketch for Borewell Location.pdf27 Feb 2024
Sources of water - Self declarationFile: Point No - 16, Self Declaration on Borewell.pdf27 Feb 2024
RTC, survey 60-
Mutation, survey 60-
Encumbrance Certificate, survey 60-
Conversion/Alienation Order, survey 60-
Sale/Title/Gift Deed, survey 60-
JDA, survey 60-
Khatha, survey 60-
Registration CertificateFile: Certificate of Incorporation-Vepl.PDF-
Organization StructureFile: Organisation Structure.pdf-

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 declared completed, no finish date filed
ProjectLocationStatusPromisedDelivered
Vajram TiaraBLOCK-E, VAJRAM TIARA, Vajram Tiara, Doddaballapur Main Rd, Avalahalli, Bangalore 560103Completed-No date filed

How this compares with Bengaluru Urban

54%of this project is bookeddistrict median 51%
34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep Vajram Newtown - II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmVajram Newtown - IIOther 41Dot size: filed unitsN

Filed coordinates, straight-line distance. 41 registered projects within 2 km.

Builder: VAJRAM ESTATES PRIVATE LIMITED

VAJRAM ESTATES PRIVATE LIMITED has 7 registrations on RERA Karnataka, including Vajram Newtown - II and vajram tiara. Its filings declare 10 earlier projects, 6 of them declared completed. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if Vajram Newtown - II is delayed beyond 12 Jan 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Vajram Newtown - II?

The registered promoter entity is VAJRAM ESTATES PRIVATE LIMITED, a company as per the filing. Its GSTIN 29AACCV9397A1ZX can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Vajram Newtown - II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Vajram Newtown - II?

Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

Who certifies construction progress at Vajram Newtown - II?

The professionals named in the filing: Architect: Urban Frame Pvt Ltd; Engineer: RENUKA PRASAD HN [PROPRIETOR OF PRASAD CONSULTANTS]; Chartered Accountant: BELLALA AND RAGHAVENDRA. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Vajram Newtown - II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Vajram Newtown - II. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Vajram Newtown - II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.