Home / Browse projects / Bengaluru Urban, Karnataka / VAISHNAVI AT-ONE KRISHNA BRINDAVAN
VAISHNAVI AT-ONE KRISHNA BRINDAVAN
By VAISHNAVI AT-ONE INFRASTRUCTURE LLP
RG-KA-43847 · RERA PRM/KA/RERA/1251/310/PR/081025/008140 · Last updated on RERA Karnataka portal: 14 Oct 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
VAISHNAVI AT-ONE KRISHNA BRINDAVAN is a Residential/Group Housing project by VAISHNAVI AT-ONE INFRASTRUCTURE LLP in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/081025/008140 on 8 Oct 2025. Possession is promised by 20 Jun 2030. 171 of the 359 units on this registration are recorded sold or booked, and 2 of 19 construction stages are filed complete.
At a glance
Project
- NameVAISHNAVI AT-ONE KRISHNA BRINDAVAN
- TypeResidential/Group Housing
- Location
- Bengaluru South
- Bengaluru Urban
- 560078
- Pincode560078
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/310/PR/081025/008140
- ReraGenie IDRG-KA-43847
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on8 Oct 2025
- Promised completion20 Jun 2030
- Revised completionNone
- Buildings2 building records
- Documents filed140 files
Current status
Figures as on 14 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Tower A | - | - | - | 183 | 0 | 183 |
| B | - | - | - | 176 | 0 | 176 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 14 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
2 of 19 construction stages are filed complete. The stage furthest along is Retaining wall (All types), at 95%.
Building: 23% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 100% |
| Foundation footing work | 100% |
| Upto Plinth Level | 75% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 55% |
| Retaining wall (All types) | 95% |
| RCC or MS Framed structure | 10% |
| Masonry Construction | 0% |
| Plastering inside , outside & Ceiling | 0% |
| Joinery: Doors, Windows, Ventilators etc | 0% |
| Basic work of Water supply, Sanitary and Electrification | 0% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 0% |
| Railing and Grill fixing | 0% |
| Electrification, Water supply and Sanitary Finishing | 0% |
| Painting | 0% |
| Fire prevention and fire fighting fitting and fixture with network | 0% |
| Weather Proof work(tile,concrete) | 0% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | 0% |
| Internal and External work including landscapes as per sanctioned drawings | 0% |
| Miscellaneous | 0% |
Progress on shared amenities43
As on 14 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 3% |
| Sewage and Drainage System | Yes | 0% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 0% |
| Energy management | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Solid waste management and disposal | Yes | 0% |
| Emergency Evacuation services | Yes | 0% |
| Internal Roads & Footpaths | Yes | 5% |
| Electricity supply transformer and substation | No | Not applicable |
| Storm water drains | Yes | 0% |
| Use of renewable energy | Yes | 0% |
| Sewage Treatment Plant (STP) | Yes | 50% |
| Parks & Tree planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Electricity Supply Transformer | Yes | 0% |
| Electricity | Yes | 0% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | 0% |
| Club House | Yes | 0% |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | Yes | 0% |
| Indoor Sports facility | Yes | 0% |
| Swimming Pool | Yes | 0% |
| Gym | Yes | 0% |
| Parks | Yes | 0% |
| Power Backup | Yes | 0% |
| Piped Gas | Yes | 0% |
| Water and Sanitation | Yes | 0% |
| Air Conditioning | No | Not applicable |
| Multipurpose Hall | Yes | 0% |
| Staircases | Yes | 4% |
| Lifts | Yes | 4% |
| Corridor/Lobbies | Yes | 4% |
| Fire escapes | Yes | 4% |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | 0% |
| Basement | Yes | 65% |
| Terrace | Yes | 0% |
| Outer Wall | Yes | 0% |
| Open parking areas | Yes | 0% |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | No | Not applicable |
| Common storage spaces | No | Not applicable |
| Water conservation ( Rain water & STP water) | Yes | 50% |
Land and ownership9
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| BHAKTHAVATSALA | - | - |
| SRINIVASA REDDY PRATHIBA | - | - |
| ROOPALI.B | - | - |
| DHRUVA | - | - |
| DAYANIDHI | - | - |
| SANDHYA.H | - | - |
| KRISHNASHREE | - | - |
| NITHYASHREE | - | - |
| S.K.GAYATHRI | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 369.67 cr | Rs 109.21 cr |
| Payment of taxes | Rs 67.84 cr | Rs 15.52 cr |
| On-site expenditure-Consultants Fees | Rs 7.23 cr | Rs 18.29 cr |
| Principal sum and interest payable to financial institutions-Non Banking financial institution (NBFC) | - | Rs 7.47 cr |
Certifying professionals and partners4
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | URBAN FRAME PVT. LTD., - Anup Naik |
| Engineer | SRIDHAR M.C. |
| Engineer | HAREESH GOWDAPPA |
| Chartered Accountant | P GOWRI NAIDU |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed140
As listed on the registration, under the names the promoter filed them with; the newest 80 of 140 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/081025/008140 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form - 4 RERA KB Q2 FY 26-27.pdf | 14 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Form - 5 Architect (Q2 2026-27).pdf | 14 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form - 6 Engg (Q2 2026-27).pdf | 14 Oct 2026 |
| Q2 2026-27 Water supply and sewage board | 14 Oct 2026 |
| Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 14 Oct 2026 |
| Q2 2026-27 KPTCL- BESCOM | 14 Oct 2026 |
| Q2 2026-27 Fire and Safety | 14 Oct 2026 |
| Q2 2026-27 Airport Authority of India | 14 Oct 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: CA Certificate (Form - 4).pdf | 15 Jul 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Architect Certificate (Form - 5).pdf | 15 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Engineer Certificate (Form - 6).pdf | 15 Jul 2026 |
| Q1 2026-27 Water supply and sewage board | 15 Jul 2026 |
| Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 15 Jul 2026 |
| Q1 2026-27 KPTCL- BESCOM | 15 Jul 2026 |
| Q1 2026-27 Fire and Safety | 15 Jul 2026 |
| Q1 2026-27 Airport Authority of India | 15 Jul 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: CA Certificate (Form - 4).pdf | 15 Apr 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Architects Certificate (Form - 5).pdf | 15 Apr 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Engineer Certificate (Form - 6).pdf | 15 Apr 2026 |
| Q4 2025-26 Water supply and sewage board | 15 Apr 2026 |
| Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 15 Apr 2026 |
| Q4 2025-26 KPTCL- BESCOM | 15 Apr 2026 |
| Q4 2025-26 Fire and Safety | 15 Apr 2026 |
| Q4 2025-26 Airport Authority of India | 15 Apr 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4 CA.pdf | 13 Jan 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Form 5 Arch.pdf | 13 Jan 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: FORM - 6 Engg.pdf | 13 Jan 2026 |
| Q3 2025-26 Water supply and sewage board | 13 Jan 2026 |
| Q3 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 13 Jan 2026 |
| Q3 2025-26 KPTCL- BESCOM | 13 Jan 2026 |
| Q3 2025-26 Fire and Safety | 13 Jan 2026 |
| Q3 2025-26 Airport Authority of India | 13 Jan 2026 |
| Approved Single Plot Layout PlanFile: 01) Single plot sanction plan.pdf | 19 Sep 2025 |
| Approved Single Plot orderFile: 01a) Single plot order.pdf | 19 Sep 2025 |
| ADLR certified survey sketchFile: 03) ADLR Sketch.pdf | 19 Sep 2025 |
| Uploaded the Sanction drawing, Site planFile: 10) Site Plan.pdf | 19 Sep 2025 |
| Uploaded the below basement sanction planFile: 11) Below Basement floor.pdf | 19 Sep 2025 |
| Uploaded the Ground floor sanction planFile: 12) Ground Floor plan.pdf | 19 Sep 2025 |
| Uploaded the First floor planFile: 13) First floor.pdf | 19 Sep 2025 |
| Uploaded the Second floor planFile: 14)Second floor plan.pdf | 19 Sep 2025 |
| Uploaded the Third floor planFile: 15) Third floor plan.pdf | 19 Sep 2025 |
| Uploaded the typical floors -4-17, 19-26, 28&29File: 16) Typical floors 4-17 & 19-26 28&29.pdf | 19 Sep 2025 |
| Uploaded Refugee florr - 18-27 floorFile: 17) Refuge Floor 18th -27floor.pdf | 19 Sep 2025 |
| Uploaded 30th floor planFile: 18) 30th floor.pdf | 19 Sep 2025 |
| Uploaded 31st floor planFile: 19) 31st floor.pdf | 19 Sep 2025 |
| Uploaded 32nd floor planFile: 20) 32nd floor.pdf | 19 Sep 2025 |
| ElevationFile: 21) Elevation.pdf | 19 Sep 2025 |
| Sectional Tower AFile: Sectional Tower A.pdf | 19 Sep 2025 |
| Sectional Tower BFile: Sectional Tower B.pdf | 19 Sep 2025 |
| Brief on Commencement certificateFile: 31) Commencement decl.pdf | 19 Sep 2025 |
| Brief on KSPCB attached the KSPCB NOCFile: 30) KSPCB NOC.pdf | 19 Sep 2025 |
| CDPFile: 25) CDP.pdf | 19 Sep 2025 |
| Village MapFile: 26) Village map D.pdf | 19 Sep 2025 |
| KTCP ApprovalFile: 01) Single plot sanction plan.pdf | 19 Sep 2025 |
| Fire NOCFile: 27) Fire - NOC.pdf | 19 Sep 2025 |
| BWSSB NOCFile: 28) BWSSB NOC with receipts.pdf | 19 Sep 2025 |
| Updated the external infrastructure,common area & terrace areaFile: 33) Terrace area.pdf | 19 Sep 2025 |
| Brief on Electrical TrasnformersFile: 32) Electrical transformer.pdf | 19 Sep 2025 |
| Uploaded the appropriate Form 3, along with the estimated costFile: 06) Form 3 Engg certificate with the estimated cost certified.pdf | 19 Sep 2025 |
| Uploaded the structural stability certificateFile: 04) Structural Stability certificate.pdf | 19 Sep 2025 |
| Uploaded Proforma of AFS duly filledFile: 09) AOS updated.pdf | 19 Sep 2025 |
| Uploaded Proforma Allotment letterFile: 29) Allotment letter.pdf | 19 Sep 2025 |
| Uploaded complete SEIAA NOCFile: 08) SEIAA.pdf | 19 Sep 2025 |
| Uploaded brief on estimated construction costFile: 34) Brief on construction cost.pdf | 19 Sep 2025 |
| Uploaded Land cost along with the Guidance value mandate highlightedFile: 07) Land cost with the Guideline value gazzeted mandate.pdf | 19 Sep 2025 |
| Uploaded Annual audit submission ack - V-life 22-23File: Form 7 CA cert 2023 com.pdf | 19 Sep 2025 |
| Uploaded annual audit submission ack - V-Life 23-24File: FORM 7 -LIFE 2024 COM.pdf | 19 Sep 2025 |
| Uploaded annual audit submission ack - V-life phase II - 22-23File: Form 7 - V-Life Phase II.pdf | 19 Sep 2025 |
| Uploaded annual audit submission ack - V-life phase II - 23-24File: Form 7 - 2023-24.pdf | 19 Sep 2025 |
| Uploaded annual audit submission ack - V Premiere 22-23File: Form 7 - Premiere.pdf | 19 Sep 2025 |
| Uploaded annual audit submission ack V-Premiere 23-24File: FORM 7 - ANNUAL.pdf | 19 Sep 2025 |
| Clarification on sales/operation revenueFile: 43) Clarification on sale revenue.pdf | 19 Sep 2025 |
| Bank loan - RERA designated accountFile: 41) Bank loan clarification.pdf | 19 Sep 2025 |
| Source of funds with supportingsFile: 42) Source of funds with supporting.pdf | 19 Sep 2025 |
| RTC, survey 59 | - |
| Mutation, survey 59 | - |
| Encumbrance Certificate, survey 59 | - |
| Conversion/Alienation Order, survey 59 | - |
| Sale/Title/Gift Deed, survey 59 | - |
| JDA, survey 59 | - |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Status | Promised | Delivered |
|---|---|---|---|---|
| VAISHNAVI AT-ONE LIFE | SY. NOS. 64 (P), 65(P), 67/3, 67/4, 68/3, 68/4, 69/1, 69/2, 69/7, 69/8, 73, 74/2, 74/3, 75, 76, 78/2, 79, 80, 81 & 82/1, Bettenahalli Village, Devanahalli | Completed | - | No date filed |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep VAISHNAVI AT-ONE KRISHNA BRINDAVAN on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 18 registered projects within 2 km.
CELESTIUM
VAINAVI INFRASTRUCTURES
ZED WINDSOR
ZED ENTERPRISES
ESTEEM KINGS COURT 3
Esteem Kings Dwelling Pvt Ltd
Prestige Park Grove
PRESTIGE PROJECTS PRIVATE LIMITED
Prestige Lakeside Habitat
Prestige Habitat Ventures
LivingTree by Kalyani Developers
Kalyani Tech Park Private Limited
See every Bengaluru Urban project, with the district possession charts
Builder: VAISHNAVI AT-ONE INFRASTRUCTURE LLP
Vaishnavi AT-One Infrastructure LLP has 3 registrations on RERA Karnataka, including Vaishnavi AT-One Life and Vaishnavi AT-One Life Phase II. Its filings declare 2 earlier projects, 1 of them declared completed. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if VAISHNAVI AT-ONE KRISHNA BRINDAVAN is delayed beyond 20 Jun 2030?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of VAISHNAVI AT-ONE KRISHNA BRINDAVAN?
The registered promoter entity is VAISHNAVI AT-ONE INFRASTRUCTURE LLP, a partnership firm as per the filing. Its GSTIN 29AATFV4523A1Z0 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in VAISHNAVI AT-ONE KRISHNA BRINDAVAN?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at VAISHNAVI AT-ONE KRISHNA BRINDAVAN?
The professionals named in the filing: Architect: URBAN FRAME PVT. LTD., - Anup Naik; Engineer: SRIDHAR M.C.; Engineer: HAREESH GOWDAPPA; Chartered Accountant: P GOWRI NAIDU. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in VAISHNAVI AT-ONE KRISHNA BRINDAVAN?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback