ReraGenieLog inGet a buyer report

Home / Browse projects / Bengaluru Urban, Karnataka / V.S.R TRANQUIL

Registration approved Residential/Group Housing project

V.S.R TRANQUIL

By V.S.R VENTURES

RG-KA-20786 · RERA PRM/KA/RERA/1251/446/PR/200323/003370 · Last updated on RERA Karnataka portal: 11 Nov 2024

Source: official RERA Karnataka filing

Red flags

  • 1 complaint at RERA Karnataka
  • Completion date moved by 21 months
  • 2 extensions taken

Clear

  • Separate project account declared
Sep 2025Possession promisedmoved 21 months from the original
1Complaints at RERA Karnatakaon this registration
Jump to the 78 documents Report an error

V.S.R TRANQUIL is a Residential/Group Housing project by V.S.R VENTURES in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/200323/003370 on 23 Mar 2020. Possession is promised by 30 Sep 2025. The completion date has moved by 21 months from the original filing. 1 complaint is on record with the regulator.

At a glance

Project

  • NameV.S.R TRANQUIL
  • TypeResidential/Group Housing
  • Location
    • Bengaluru East
    • Bengaluru Urban
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1251/446/PR/200323/003370
  • ReraGenie IDRG-KA-20786

Builder

  • NameV.S.R VENTURES
  • Entity typePartnership Firm
  • Authorized SignatoryC.Thirupal Reddy
  • Board MembersC.Dhasaratharama Reddy, M.Dhananjaya Reddy, A.Sai Kumar Reddy

Key dates

this monthRegisteredMar 2020First promiseDec 2023Revised toSep 2025

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on23 Mar 2020
  • Promised completion30 Sep 2025
  • Revised completionRevised to 30 Sep 2025 (originally 31 Dec 2023)
  • Buildings3 building records
  • Documents filed78 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing A---61061
Wing B---60060
Wing C---62062

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 11 Nov 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

As on 11 Nov 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsNoNot applicable
Sewage and Drainage SystemYes-
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
Provision for community buildings and for treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalNoNot applicable
Water conservationNoNot applicable
Energy managementYes-
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesNoNot applicable
Electricity supply transformer and substationNoNot applicable
Emergency Evacuation servicesNoNot applicable
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseNoNot applicable
Community HallYes-
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityYes-
Swimming PoolYes-
GymYes-
ParksNoNot applicable
Power BackupYes-
GasNoNot applicable
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesYes-
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area7,255 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 68.58 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSNS Associates
EngineerSNS Associates

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

ExtensionDec 2023 → Sep 2024

No reason recorded in the filing

EX/PRM/KA/RERA/1251/446/PR/241216/003370Sep 2024 → Sep 2025

Reason as filed by the promoterShortage of Labour

Complaints filed with RERA Karnataka1

Case no.ComplainantRespondentFiled
CMP/211106/0008518-V.S.R VENTURES06/11/2021

Documents filed78

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/200323/003370 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form -BFile: AFFIDAVIT.pdf11 Nov 2024
EC Till DateFile: EC TILL DATE.pdf11 Nov 2024
CertificateFile: Company Registration.pdf-
Architect Certificate for Work Completion Schedule till DateFile: ARCHITECT CERTIFICATE STATUS OF WORK.pdf-
Engineer Certificate for Work Completion Schedule till DateFile: ENGINEER CERTIFICATE STATUS OF WORK.pdf-
CA Certificate for Funds UtilizationFile: CA Fund Utilization Certificate.pdf-
Architect Certificate for Pending Work Completion Schedule.File: ARCHITECT CERTIFICATE WORK PENDING.pdf-
Engineer Certificate for Pending Work Completion Schedule.File: ENGINEER CERTIFICATE PENDING WORK.pdf-
CA Certificate for Funds required for Project CompletionFile: CA Certificate For Funds Required EX 4.pdf-
AffidavitFile: AFFIDAVIT - UPDATED.pdf-
Latest Encumbrance CertificateFile: ARCHITECT CERTIFICATE STATUS OF WORK.pdf-
Details Of Sold/ Un-sold UnitsFile: CA Certificate For Funds Required EX 4.pdf-
Document 1File: AFFIDAVIT.pdf-
BBMP License-
Site - Ground -Lower Basement - Upper Basement - Section and Elevation Plan-
1st to 9th Floor-
BBMP License and Commencement-
Old Sale Deed - Srinivas-
10th & Terrace Floor Plan-
Site - Ground -Lower Basement - Upper Basement - Section and Elevation Plan-
Specifications-
EC Till Date-
RERA Affidavit-
PartnerShip Deed - Reconstitution-
Khata certificate and Extract-
Sale Deed-
Fire NOC_compressed-
Conversion Order-
Unnamed document-
Company PAN-
Account Pass Book-
Company Registration-
Unnamed document-
Airport Authority NOC_compressed-
BESCOM NOC_compressed-
BWSSB NOC_compressed-
Unnamed document-
Unnamed document-
BSNL NOC_compressed-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Pollution Board NOC-
Environment NOC_compressed-
Unnamed document-
Balance Sheet 2018 - 2019File: Complete IT 2019 - 20.PDF-
Balance Sheet 2017 - 2018File: Complete IT 2018-19.PDF-
Balance Sheet 2016 - 2017File: Complete IT 2017 - 18.PDF-
Audited Profit and Loss Statement 2018 - 2019File: Complete IT 2019 - 20.PDF-
Audited Profit and Loss Statement 2017 - 2018File: Complete IT 2018-19.PDF-
Audited Profit and Loss Statement 2016 - 2017File: Complete IT 2017 - 18.PDF-
Director's Report 2018 - 2019File: Complete IT 2019 - 20.PDF-
Director's Report 2017 - 2018File: Complete IT 2018-19.PDF-
Director's Report 2016 - 2017File: Complete IT 2017 - 18.PDF-
Cash Flow Statement 2018 - 2019File: Complete IT 2019 - 20.PDF-
Cash Flow Statement 2017 - 2018File: Complete IT 2018-19.PDF-
Auditor's Report 2018 - 2019File: Complete IT 2019 - 20.PDF-
Auditor's Report 2017 - 2018File: Complete IT 2018-19.PDF-
Auditor's Report 2016 - 2017File: Complete IT 2017 - 18.PDF-
Income Tax Return Acknowledgement 2018 - 2019File: Complete IT 2019 - 20.PDF-
Income Tax Return Acknowledgement 2017 - 2018File: Complete IT 2018-19.PDF-
Income Tax Return Acknowledgement 2016 - 2017File: Complete IT 2017 - 18.PDF-
RERA Form B-Affidavit cum Declaration-
Prospectus/BrochureFile: Advert - Brouchure.pdf-
Advertisement Copy 1File: Advert - Brouchure.pdf-
Tower Excel SheetFile: PRM_KA_RERA_1251_446_PR_200323_003370.xlsx-
Occupancy CertificateFile: occupany Certificate VSR tranquil.pdf-
Certificate of operation for lifts issued by the Chief of Department of Electrical inspectorate Government of File: Lift License.pdf-
Architect certificate for having completed the work(in format no 5)File: Architect Report.pdf-
Chartered Accountant certificate for having completed the work(in format no 4)File: Form 4CC CA Certificate.pdf-
Affidavit cum declaration from promoter for having completed the project as per specification and as per adverFile: RERA Completion Affidavit.pdf-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one moved by 21 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep V.S.R TRANQUIL on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

Builder: V.S.R VENTURES

V.S.R VENTURES has 1 registration on RERA Karnataka, including V.S.R TRANQUIL. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if V.S.R TRANQUIL is delayed beyond 30 Sep 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of V.S.R TRANQUIL?

The registered promoter entity is V.S.R VENTURES, a partnership firm as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in V.S.R TRANQUIL?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against V.S.R TRANQUIL?

Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

Who certifies construction progress at V.S.R TRANQUIL?

The professionals named in the filing: Architect: SNS Associates; Engineer: SNS Associates. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in V.S.R TRANQUIL?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About V.S.R TRANQUIL. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save V.S.R TRANQUIL to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.