ReraGenieLog inGet a buyer report

Home / Browse projects / Bengaluru Urban, Karnataka / URBANEST REGAL

Registration approved Mixed Development project

URBANEST REGAL

By URBANEST INFRA PROJECTS

RG-KA-24839 · RERA PRM/KA/RERA/1251/446/PR/180329/002189

Source: official RERA Karnataka filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No complaints on record
  • Separate project account declared
Apr 2020Possession promisedmoved 12 months from the original
0Complaints at RERA Karnatakaon this registration
Jump to the 56 documents Report an error

URBANEST REGAL is a Mixed Development project by URBANEST INFRA PROJECTS in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/180329/002189 on 29 Mar 2018. Possession is promised by 25 Apr 2020. The completion date has moved by 12 months from the original filing.

At a glance

Project

  • NameURBANEST REGAL
  • TypeMixed Development
  • Location
    • Bengaluru East
    • Bengaluru Urban
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/446/PR/180329/002189
  • ReraGenie IDRG-KA-24839

Builder

  • NameURBANEST INFRA PROJECTS
  • Entity typePartnership Firm
  • Authorized SignatoryS.MEHABOOB BASHA
  • Board MemberS SHAHEEN SULTHANA

Key dates

this monthRegisteredMar 2018First promiseApr 2019Revised toApr 2020

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on29 Mar 2018
  • Promised completion25 Apr 2020
  • Revised completionRevised to 25 Apr 2020 (originally 25 Apr 2019)
  • Buildings1 building record
  • Documents filed56 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Urbanest Regal-----15

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)Not applicable
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etcNot applicable
Basic work of Water supply, Sanitary and ElectrificationNot applicable
Dadoing, Skirting, Flooring, Tiles work (All types)Not applicable
Railing and Grill fixingNot applicable
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)Not applicable
Painting-
Elevation workNot applicable
Internal and External work including landscapes as per santioned drawingsNot applicable

Progress on shared amenities41

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsNoNot applicable
Sewage and Drainage SystemNoNot applicable
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
Provision for community buildings and for treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalNoNot applicable
Water conservationNoNot applicable
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesNoNot applicable
Electricity supply transformer and substationYes-
Emergency Evacuation servicesNoNot applicable
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymYes-
ParksNoNot applicable
Power BackupYes-
GasNoNot applicable
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesNoNot applicable
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area982 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 5.00 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectS. KARTHIKEYAN
EngineerY.BHASKAR

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EX/PRM/KA/RERA/1251/446/PR/220622/002189Apr 2019 → Apr 2020

Reason as filed by the promoterothers

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed56

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/180329/002189 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CertificateFile: Urbanest form c.pdf-
Architect Certificate for Work Completion Schedule till DateFile: Archtect-WORK DONE.pdf-
Engineer Certificate for Work Completion Schedule till DateFile: Engineer work DONE.pdf-
CA Certificate for Funds UtilizationFile: Funds utalized-1-2_compressed.pdf-
Architect Certificate for Pending Work Completion Schedule.File: Archtect-WORK PENDING.pdf-
Engineer Certificate for Pending Work Completion Schedule.File: Engineer work PENDING.pdf-
CA Certificate for Funds required for Project CompletionFile: Funds required-1-2_compressed.pdf-
AffidavitFile: Affidavit.pdf-
Latest Encumbrance CertificateFile: EC Urbanest.pdf-
Details Of Sold/ Un-sold UnitsFile: SoldUnsoldDetails (1).xlsx-
Document 2File: Affidavit - 1.pdf-
Document 3File: CC urbanest.pdf-
Document 4File: Sold flats details.pdf-
Document 5File: 103.pdf-
Document 6File: 104.pdf-
Document 7File: 201.pdf-
Document 8File: 203.pdf-
Document 9File: 205.pdf-
Document 10File: 301.pdf-
Document 11File: Statement.pdf-
plan-final-
plan-final-
Sale Deed- Mehaboob Basha - Draft-
Sale Agreement - Mehaboob Basha - Draft-
Final_SaleDeed-
plan-final-
Flat_booking_form-
UrbanestRegalBrochure-
specifications-final-min-
ec Urbanest-
katha-
Final_SaleDeed-
aDDENDUM-
plan-final-
conversion-min-
Balance Sheet 2016 - 2017File: Not-applicable-new-company.pdf-
Balance Sheet 2015 - 2016File: Not-applicable-new-company.pdf-
Balance Sheet 2014 - 2015File: Not-applicable-new-company.pdf-
Audited Profit and Loss Statement 2016 - 2017File: Not-applicable-new-company.pdf-
Audited Profit and Loss Statement 2015 - 2016File: Not-applicable-new-company.pdf-
Audited Profit and Loss Statement 2014 - 2015File: Not-applicable-new-company.pdf-
Director's Report 2016 - 2017File: Not-applicable-new-company.pdf-
Director's Report 2015 - 2016File: Not-applicable-new-company.pdf-
Director's Report 2014 - 2015File: Not-applicable-new-company.pdf-
Cash Flow Statement 2016 - 2017File: Not-applicable-new-company.pdf-
Cash Flow Statement 2015 - 2016File: Not-applicable-new-company.pdf-
Auditor's Report 2016 - 2017File: Not-applicable-new-company.pdf-
Auditor's Report 2015 - 2016File: Not-applicable-new-company.pdf-
Auditor's Report 2014 - 2015File: Not-applicable-new-company.pdf-
Income Tax Return Acknowledgement 2016 - 2017File: Not-applicable-new-company.pdf-
Income Tax Return Acknowledgement 2015 - 2016File: Not-applicable-new-company.pdf-
Income Tax Return Acknowledgement 2014 - 2015File: Not-applicable-new-company.pdf-
Foam B-min-
Prospectus/BrochureFile: UrbanestRegalBrochure.pdf-
Advertisement Copy 1File: urbanest-leaf-let.png-
Tower Excel SheetFile: PRM_KA_RERA_1251_446_PR_180329_002189.xlsx-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one moved by 12 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep URBANEST REGAL on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmURBANEST REGALOther 37Dot size: filed unitsN

Filed coordinates, straight-line distance. 37 registered projects within 2 km.

Builder: URBANEST INFRA PROJECTS

URBANEST INFRA PROJECTS has 1 registration on RERA Karnataka, including URBANEST REGAL. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if URBANEST REGAL is delayed beyond 25 Apr 2020?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of URBANEST REGAL?

The registered promoter entity is URBANEST INFRA PROJECTS, a partnership firm as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in URBANEST REGAL?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at URBANEST REGAL?

The professionals named in the filing: Architect: S. KARTHIKEYAN; Engineer: Y.BHASKAR. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in URBANEST REGAL?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About URBANEST REGAL. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save URBANEST REGAL to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.