UNIVERSAL PRIDE

By UNIVERSAL BUILDCON

RG-MH-96126 · RERA P51600055655 · Last updated on MahaRERA portal: 14 Jul 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
4 of 11Construction stages donefurthest along: Internal walls, 70%
25 of 30Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 75 documents Report an error

UNIVERSAL PRIDE is a Others project by UNIVERSAL BUILDCON in Nashik, Maharashtra, registered with MahaRERA as P51600055655 on 5 Apr 2024. Possession is promised by 31 Dec 2027. 5 of the 30 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameUNIVERSAL PRIDE
  • TypeOthers
  • Location
    • OZAR MIG
    • OZAR
    • Ozar (CT)
    • Niphad
    • Nashik
    • 422207
  • Pincode422207
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51600055655
  • ReraGenie IDRG-MH-96126

Builder

  • NameUNIVERSAL BUILDCON
  • Entity typePartnership
  • PartnersSANJAY CHANGDEO KURHADE, JAYSHREE NITIN GHUMARE, SACHIN BAPU PATIL, RAVINDRA RAMKRUSHNA SHINDE, CHANDRASHEKHAR BHASKARRAO SHINDE, SUJATA SACHIN SHETE

Key dates

this monthRegisteredApr 2024PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on5 Apr 2024
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed75 files

Current status

17%5 of 30 units booked
46.2%Work done, per cost certificate

Figures as on 14 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
UNIVERSAL PRIDENA88201030

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 14 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 70%.

UNIVERSAL PRIDE: 47% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises30%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks20%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 14 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed40

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots40
Closed/Covered40

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,060 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on27 Nov 2025

Approvals and building plan

Sanctioning authorityOZAR MUNICIPAL COUNCIL
Permissible FSI2418.05
Proposed, not sanctioned2,418 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchOZAR NASHIK 422206
Estimated costRs 4.91 cr
Cost incurredRs 2.27 cr
Work done46.19%
BuildingWingEstimatedIncurred
UNIVERSAL PRIDENARs 4.91 crRs 2.27 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRiyaz Y Jamadar
EngineerNilesh P.Doshi
Chartered AccountantCA SANDEEP C CHAVANKE
Chartered AccountantSAHEBRAO DADAJI PAWAR
PartnerRole in project
UNIVERSAL BUILDCON-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Feb 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 Feb 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 Feb 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 Feb 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed75

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1.pdf14 Jul 2026
Withdrawal Update Form 2File: Form 2.pdf14 Jul 2026
Withdrawal Update Form 3File: FORM 3.pdf14 Jul 2026
Withdrawal Update Form 1File: Form 1 31032026.pdf24 Apr 2026
Withdrawal Update Form 2File: Form 2 31032026.pdf24 Apr 2026
Withdrawal Update Form 3File: Form3.pdf24 Apr 2026
Withdrawal Update Form 1File: Form 1 .pdf21 Jan 2026
Withdrawal Update Form 2File: Form 2.pdf21 Jan 2026
Withdrawal Update Form 3File: Form 3.pdf21 Jan 2026
Form 5 (FY 2024-2025)File: FORM 5.pdf31 Dec 2025
Form 1File: Form 1 30092025.pdf16 Oct 2025
Form 2File: Form 2 30092025.pdf16 Oct 2025
Form 3File: Form 3.pdf16 Oct 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold & booked Inventory 30092025.pdf16 Oct 2025
Form 1File: Form 1 30062025.pdf19 Jul 2025
Form 2File: Form 2 30062025.pdf19 Jul 2025
Form 3File: FORM 3 UNIVERSAL PRIDE 30062025.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold & booked Inventory 30062025.pdf19 Jul 2025
Self-declaration of Quarterly ProgressFile: Self Declaration QP Apr-Jun 25.pdf19 Jul 2025
Form 1File: Form 1.pdf30 Jun 2025
Form 2File: Form 2.pdf30 Jun 2025
Form 3File: Form 3 CA_Letter 30062024.pdf30 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold & booked Inventory.pdf30 Jun 2025
Self-declaration of Quarterly ProgressFile: Self Declaration QP April to June 24.pdf30 Jun 2025
Form 1File: Form-1.pdf30 Jun 2025
Form 2File: Form 2..pdf30 Jun 2025
Form 3File: Form 3 CA_Letter 30092024.pdf30 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold & booked Inventory.pdf30 Jun 2025
Self-declaration of Quarterly ProgressFile: Self Declaration QP July to Sept 24.pdf30 Jun 2025
Form 1File: Form-1..pdf30 Jun 2025
Form 2File: Form 2..pdf30 Jun 2025
Form 3File: Form 3 CA_Letter 31122024.pdf30 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold & booked Inventory.pdf30 Jun 2025
Self-declaration of Quarterly ProgressFile: Self Declaration QP Oct to Dec 24.pdf30 Jun 2025
Form 1File: Form-1..pdf30 Jun 2025
Form 2File: Form 2..pdf30 Jun 2025
Form 3File: Form 3 CA_Letter 31032025.pdf30 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold & booked Inventory.pdf30 Jun 2025
Self-declaration of Quarterly ProgressFile: Self Declaration QP Jan to March 25.pdf30 Jun 2025
Form 2A (FY 2024-2025)File: Form 2A.pdf30 Jun 2025
Proforma of Agreement for saleFile: Model_AFS_in_Marathi.pdf2 Apr 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Report Model Copy of Agreement.pdf2 Apr 2024
Other - TechnicalFile: Declaration cum Undertaking-Multiple Registrations for single land.pdf28 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf25 Mar 2024
Other - TechnicalFile: NMC REA51600154962 for registration under MahaRERA_.pdf21 Mar 2024
Details of encumbrances concerned to FinanceFile: Details Of Legal Encumbrances.pdf19 Mar 2024
Details of encumbrances concerned to LegalFile: Details Of Legal Encumbrances.pdf19 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Abhijit Gaikwad-Disclosure of interest in other Real Estate.pdf19 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Chandrashekhar - Disclosure of interest in other Real Estate.pdf19 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Jayashree Nitin Ghumare - Disclosure of interest in other Real Estate.pdf19 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Ravindra Ramkrushna Shinde-Disclosure of interest in other Real Estate.pdf19 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Sachin Bapu Patil-Disclosure of interest in other Real Estate.pdf19 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Sanjay Kurhade-Disclosure of interest in other Real Estate.pdf19 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Sujata Sachin Shete-Disclosure of interest in other Real Estate.pdf19 Mar 2024
Other - LegalFile: Land Sale Deed_11zon.pdf19 Mar 2024
Details of encumbrances concerned to FinanceFile: Details Of Finance encumbrances.pdf6 Mar 2024
Details of encumbrances concerned to LegalFile: Details Of Finance encumbrances.pdf6 Mar 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about Separate Bank Account for real estate projects.pdf6 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf2 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf2 Mar 2024
CERSAI detailsFile: CERSAI_Search_Report_200299045298_For_Asset_Based_Search_02_03_2024_17_59_00_281.pdf2 Mar 2024
Other - LegalFile: PARTNERSHIP DEED_11zon.pdf29 Feb 2024
Declaration about Commencement CertificateFile: FORM D.pdf17 Feb 2024
Declaration in FORM BFile: FORM_B_11zon.pdf17 Feb 2024
Proforma of Allotment letterFile: MODEL FORM OF ALLOTMENT LETTER_11zon.pdf17 Feb 2024
Deviation Report with respect to Allotment letterFile: Deviation Report Allotment Letter.pdf17 Feb 2024
Layout approvalFile: Plot Layout.pdf16 Feb 2024
Building plan approvalFile: Building Plan 01.pdf16 Feb 2024
Building plan approvalFile: Building Plan 02.pdf16 Feb 2024
PAN CardFile: PAN.pdf16 Feb 2024
Copy of the legal title reportFile: Legal Title report.pdf16 Feb 2024
Copy of Layout Approval (in case of layout)File: Plot Layout.pdf16 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: Building Plan 01.pdf16 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: Building Plan 02.pdf16 Feb 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf16 Feb 2024

How this compares with Nashik

17%of this project is bookeddistrict median 17%
10%of Nashik projects moved their completion datethis one has not
19%of Nashik registrations have lapsed or been cancelledthis one is on the register

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep UNIVERSAL PRIDE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near OZAR4,100+ in Nashik

2 kmUNIVERSAL PRIDECompleted 5Other 2Dot size: filed unitsN

Filed coordinates, straight-line distance. 7 registered projects within 2 km.

Builder: UNIVERSAL BUILDCON

UNIVERSAL BUILDCON has 1 registration on MahaRERA, including UNIVERSAL PRIDE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if UNIVERSAL PRIDE is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of UNIVERSAL PRIDE?

The registered promoter entity is UNIVERSAL BUILDCON, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in UNIVERSAL PRIDE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for UNIVERSAL PRIDE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at UNIVERSAL PRIDE?

The professionals named in the filing: Architect: Riyaz Y Jamadar; Engineer: Nilesh P.Doshi; Chartered Accountant: CA SANDEEP C CHAVANKE; Chartered Accountant: SAHEBRAO DADAJI PAWAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in UNIVERSAL PRIDE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About UNIVERSAL PRIDE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save UNIVERSAL PRIDE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.