ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / UNIQUE SHINE

Registered No litigation declared Residential / Group Housing project

UNIQUE SHINE

By FAZAL MEHMOOD SHAIKH

RG-MH-05154 · RERA P51800050757 · Last updated on MahaRERA portal: 11 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 7 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 87%
0Complaints at MahaRERAon this registration
Jump to the 88 documents Report an error

UNIQUE SHINE is a Residential / Group Housing project by FAZAL MEHMOOD SHAIKH in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800050757 on 3 May 2023. Possession is promised by 31 Dec 2026.

At a glance

Project

  • NameUNIQUE SHINE
  • TypeResidential / Group Housing
  • Location
    • KANNAMWAR NAGAR
    • VIKHROLI EAST
    • Hariyali
    • Kurla
    • Mumbai Suburban
    • 400083
  • Pincode400083
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800050757
  • ReraGenie IDRG-MH-05154

Builder

  • NameFAZAL MEHMOOD SHAIKH
  • Entity typeIndividual
  • Other registrations7 more →
  • Completed1 of 8
  • Declared earlier projects7 →

Key dates

this monthRegisteredMay 2023PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on3 May 2023
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed88 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
UNIQUE SHINENA220000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 11 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 87%.

UNIQUE SHINE: 64% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor80%
Slabs of Super Structure87%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises82%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks73%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.61%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.20%

Progress on shared amenities15

As on 11 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area639 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
K N SWARANJALI CHS LTDHariyaliMumbai Suburban

Approvals and building plan

Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNULL BAZAR 6AB - 7AB JARIWALA BLDG MUMBAI 400 003

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
Chartered AccountantPranav Bhaskaran & Associates
Chartered AccountantPratiksha Tulshyan & Associates
PartnerRole in project
FAZAL MEHMOOD SHAIKH-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Apr 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 Mar 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 5 Dec 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 Mar 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed88

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 88 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1 - Unique Shine as on Dec 2025.pdf11 May 2026
Form 3File: Form 3 - Unique Shine as on Dec 2025.pdf11 May 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - Unique Shine as on Dec 2025.pdf11 May 2026
Form 2File: Form 2 - Unique Shine as on March 2026.pdf11 May 2026
Form 1File: Form 1 - Unique Shine as on March 2026.pdf11 May 2026
Form 2File: Form 2 - Unique Shine as on March 2026.pdf11 May 2026
Form 3File: Form 3 - Unique Shine as on March 2026.pdf11 May 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - Unique Shine as on March 2026.pdf11 May 2026
Form 5 (FY 2023-2024)File: Form 5 - Unique Shine for FY 2023-24.pdf24 Feb 2026
Form 5 (FY 2024-2025)File: Form 5 - Unique Shine for FY 2024-25.pdf24 Feb 2026
Form 1File: Form 1 - Unique Shine as on Sept 2025.pdf20 Oct 2025
Form 2File: Form 2 - Unique Shine as on Sept 2025.pdf20 Oct 2025
Form 3File: Form 3 - Unique Shine as on Sept 2025.pdf20 Oct 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - Unique Shine as on Sept 2025.pdf20 Oct 2025
Form 1File: Form 1 - Unique Shine as on June 2025.pdf13 Aug 2025
Form 2File: Form 2 - Unique Shine as on June 2025.pdf13 Aug 2025
Form 3File: Form 3 - Unique Shine as on June 2025.pdf13 Aug 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - Unique Shine as on June 2025.pdf13 Aug 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Unique Shine as on Dec 2024.pdf27 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Unique Shine as on Dec 2024.pdf27 Jan 2025
Building plan approvalFile: Bldg no 71 Final Amended Plan 21 22 Floor.pdf5 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: Bldg no 71 Final Amended Plan 21 22 Floor.pdf5 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - Unique Shine for FY 2023-24.pdf25 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Unique Shine Sept 2024.pdf23 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Unique Enclave Residency as on 30-09-2024.pdf23 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 of Unique Shine as on 30-09-024.pdf23 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Unique Shine as on 30-09-2024.pdf23 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Unique Shine June 2024.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Unique Shine as on June 2024.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Unique Shine as on June 2024.pdf20 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 6 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf17 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 5 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf17 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 5 CA Certificate on Project Cost Fund withdrawal (Form 3) (2).pdf17 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Unique Shine June 2023 - Signed .pdf30 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Unique Shine September 2023 - Signed.pdf30 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Unique Shine December 2023 - Signed .pdf30 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Unique Shine Mar 2024 - Signed .pdf30 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Unique Shine.pdf30 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Unique Shine as on June 2023.pdf30 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Unique Shine as on September 2023.pdf30 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Unique Shine as on December 2023.pdf30 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Unique Shine as on March 2024.pdf30 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Unique Shine as on 30-06-2023.pdf30 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Unique Shine as on 30-09-2023.pdf30 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Unique Shine as on 31-12-2023.pdf30 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Unique Shine as on 31-03-2024.pdf30 Apr 2024
Copy of the legal title reportFile: 71 - Legal Title Report .pdf26 Apr 2023
Details of encumbrances concerned to FinanceFile: Details of Encum.pdf20 Apr 2023
Details of encumbrances concerned to LegalFile: Details of Encum.pdf20 Apr 2023
Other - FinanceFile: No Letigation.pdf20 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 71 CA Certificate .pdf19 Apr 2023
Proforma of Allotment letterFile: Allotment Letter Bldg 71 Final.pdf18 Apr 2023
Proforma of Agreement for saleFile: Sale Agreement.pdf18 Apr 2023
Proforma of Agreement for saleFile: Annexure - A Title Certificate.pdf18 Apr 2023
Proforma of Agreement for saleFile: Annexure - B PR Card.pdf18 Apr 2023
Proforma of Agreement for saleFile: Annexure - C-1 Demarcation Plan.pdf18 Apr 2023
Proforma of Agreement for saleFile: Annexure - C-2 Layout Plan IOA.pdf18 Apr 2023
Proforma of Agreement for saleFile: Annexure - D Floor Plan.pdf18 Apr 2023
Proforma of Agreement for saleFile: Annexure - E List of Amenities.pdf18 Apr 2023
Deviation Report with respect to Allotment letterFile: Deviation Report- Allotment.pdf14 Apr 2023
Deviation Report with respect to model copy of AgreementFile: Deviation Report- Sale Agreement.pdf14 Apr 2023
Details of encumbrances concerned to FinanceFile: 71 encumbrances.pdf6 Apr 2023
Details of encumbrances concerned to LegalFile: 71 encumbrances.pdf6 Apr 2023
CERSAI detailsFile: Revised CERSAI_Search_Report_200265565534_For_Asset_Based_Search_06_04_2023_14_09_07_722.p6 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA Form 2 Final.pdf5 Apr 2023
Disclosure of sold/ booked inventoryFile: Inventory Reports 71 Final.pdf5 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect form 1.pdf18 Mar 2023
Status of ConveyanceFile: 5 Other - Legal.pdf18 Mar 2023
Status of ConveyanceFile: 6 Other - Legal.pdf18 Mar 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bldg NO 71 - Declaration Abount Seprate Bank Ac for Real Estate Projects.pdf18 Mar 2023
Other - LegalFile: Bldg No 71 CC_compressed.pdf18 Mar 2023
Other - LegalFile: CFO PLAN.pdf18 Mar 2023
Other - LegalFile: Intimation of Approval (IOA) for Zero FSI.pdf18 Mar 2023
Other - LegalFile: Revised Offer Letter.pdf18 Mar 2023
Other - LegalFile: Disconnection of Water Line MHADA 71.pdf18 Mar 2023
Other - LegalFile: Parking letter - 71.pdf18 Mar 2023
Other - LegalFile: DEMARCATION PLAN - 71.pdf18 Mar 2023
Declaration about Commencement CertificateFile: Bldg No 71 - Declaration about Commencement Certificate.pdf17 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Bldg No 71 Disclosure of Interest in Other Real Estate Organizations.pdf17 Mar 2023
Copy of the legal title reportFile: TitleCertificate.pdf16 Mar 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 not delivered by the promised date
ProjectLocationFlatsStatusPromisedDelivered
UNIQUE PRIDEBLDG NO 144 KANNAMWAR NAGAR 2 VIKHROLI EAST MUMBAI 400 08371OngoingDec 2025Not delivered

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep UNIQUE SHINE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near VIKHROLI EAST6,700+ in Mumbai Suburban

2 kmUNIQUE SHINECompleted 35Lapsed / revoked 28Other 98Dot size: filed unitsN

Filed coordinates, straight-line distance. 161 registered projects within 2 km.

Builder: FAZAL MEHMOOD SHAIKH

FAZAL MEHMOOD SHAIKH has 8 registrations on MahaRERA, including Unique Heights and UNIQUE SHINE. Its filings disclose 7 earlier MahaRERA projects: declares 3 of 4 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if UNIQUE SHINE is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of UNIQUE SHINE?

The registered promoter entity is FAZAL MEHMOOD SHAIKH, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in UNIQUE SHINE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for UNIQUE SHINE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at UNIQUE SHINE?

The professionals named in the filing: Chartered Accountant: Pranav Bhaskaran & Associates; Chartered Accountant: Pratiksha Tulshyan & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in UNIQUE SHINE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About UNIQUE SHINE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save UNIQUE SHINE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.