Registration approved Residential/Group Housing project

Udaya Paradise

By J.PRAMILA MARY

RG-KA-54050 · RERA PRM/KA/RERA/1251/446/PR/191116/003028

Source: official RERA Karnataka filing

Red flags

  • 2 complaints at RERA Karnataka
  • Completion date moved by 9 months
  • 1 extension taken

Clear

  • Separate project account declared
Mar 2022Possession promisedmoved 9 months from the original
2Complaints at RERA Karnatakaon this registration
Jump to the 37 documents Report an error

Udaya Paradise is a Residential/Group Housing project by J.PRAMILA MARY in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/191116/003028 on 16 Nov 2019. Possession is promised by 21 Mar 2022. The completion date has moved by 9 months from the original filing. 2 complaints are on record with the regulator.

At a glance

Project

  • NameUdaya Paradise
  • TypeResidential/Group Housing
  • Location
    • Bengaluru East
    • Bengaluru Urban
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/446/PR/191116/003028
  • ReraGenie IDRG-KA-54050

Builder

  • NameJ.PRAMILA MARY

Key dates

this monthRegisteredNov 2019First promiseJun 2021Revised toMar 2022

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on16 Nov 2019
  • Promised completion21 Mar 2022
  • Revised completionRevised to 21 Mar 2022 (originally 21 Jun 2021)
  • Buildings1 building record
  • Documents filed37 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Udaya Paradise---52052

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja work-
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)Not applicable
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsNoNot applicable
Sewage and Drainage SystemYes-
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
Provision for community buildings and for treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalNoNot applicable
Water conservationNoNot applicable
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesYes-
Electricity supply transformer and substationYes-
Emergency Evacuation servicesYes-
Storm water drainsYes-
Use of renewable energyNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolYes-
GymYes-
ParksNoNot applicable
Power BackupYes-
GasNoNot applicable
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesYes-
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesNoNot applicable
Provision for lodging of management staff and security staffYes-
Water conservation and renewable energyNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,175 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 10.50 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSreenivasa Rao G
EngineerGirish M Swamy

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

ExtensionJun 2021 → Mar 2022

No reason recorded in the filing

Complaints filed with RERA Karnataka2

Case no.ComplainantRespondentFiled
01271/2024-J.PRAMILA MARY02/12/2024
00358/2025-J.PRAMILA MARY01/03/2025

Documents filed37

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/191116/003028 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Commencment Certificate-
PLAN 1&2 (1)-
ProformaSaleDeed-
ProformaSaleDeed-
RC and Sales-
PLAN 1&2 (1)-
PLAN 1&2 (1)-
Broucher-
udaya paradise specifications-
ENCUMBARANCE CERTIFICATE_compressed-
Notrized Affidavit-
Affidavit cum Declaration-
Khata-
BBMP PLAN LISENCE LETTER-
Conversion Certificate -
KSPC-Pollution-
Unnamed document-
PLAN 1&2 (1)-
Balance Sheet 2018 - 2019File: Balance Sheet 2018.pdf-
Audited Profit and Loss Statement 2018 - 2019File: Profit and Loss Ac 2018.pdf-
Auditor's Report 2018 - 2019File: Auditors Report 18 (1).pdf-
Income Tax Return Acknowledgement 2018 - 2019File: Itr Acknowledgment 18.pdf-
Income Tax Return Acknowledgement 2017 - 2018File: Itr acknowledgment 17 .pdf-
Income Tax Return Acknowledgement 2016 - 2017File: Itr Acknowledgment 16.pdf-
NOTIRIZED FORM B-
Prospectus/BrochureFile: Broucher.pdf-
Advertisement Copy 1File: Broucher.pdf-
Tower Excel SheetFile: PRM_KA_RERA_1251_446_PR_191116_003028.xlsx-
Occupancy CertificateFile: Occupancy Certificate.pdf-
Certificate of operation for lifts issued by the Chief of Department of Electrical inspectorate Government of File: Electrical Instillation Approved.pdf-
Sanctioned Letter issued by concerned ESCOM of Power sanction and details of transformer installed and whetherFile: Bescom Approved.pdf-
Sanctioned letter issued by concerned water supply and sanitary board for the projectFile: BWSSB NOC.pdf-
Common Area and other amenities facilities are completed or not and details of handling over of the same to asFile: Association Deed_compressed.pdf-
Details of undivided share of land handed over to the association of allotteesFile: Association Deed_compressed.pdf-
Architect certificate for having completed the work(in format no 5)File: Form 5.pdf-
Chartered Accountant certificate for having completed the work(in format no 4)File: Form-4cc.pdf-
Commencement CertificateFile: Commencement Cerfificate.pdf-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one moved by 9 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep Udaya Paradise on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmUdaya ParadiseOther 3Dot size: filed unitsN

Filed coordinates, straight-line distance. 3 registered projects within 2 km.

Builder: J.PRAMILA MARY

J.PRAMILA MARY has 1 registration on RERA Karnataka, including Udaya Paradise. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if Udaya Paradise is delayed beyond 21 Mar 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Udaya Paradise?

The registered promoter entity is J.PRAMILA MARY. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Udaya Paradise?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Udaya Paradise?

Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

Who certifies construction progress at Udaya Paradise?

The professionals named in the filing: Architect: Sreenivasa Rao G; Engineer: Girish M Swamy. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Udaya Paradise?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Udaya Paradise. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Udaya Paradise to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.