Home / Browse projects / Bengaluru Urban, Karnataka / Tulip

Registration approved Residential/Group Housing project

Tulip

By BRIGHT WAVE PROJECTS PRIVATE LIMITED

RG-KA-07619 · RERA PRM/KA/RERA/1251/308/PR/200323/003378 · Last updated on RERA Karnataka portal: 2 Mar 2020

Source: official RERA Karnataka filing

Red flags

  • Completion date moved by 9 months
  • 1 extension taken

Clear

  • No complaints on record
  • Separate project account declared
Feb 2024Possession promisedmoved 9 months from the original
0Complaints at RERA Karnatakaon this registration
Jump to the 81 documents Report an error

Tulip is a Residential/Group Housing project by BRIGHT WAVE PROJECTS PRIVATE LIMITED in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/308/PR/200323/003378 on 23 Mar 2020. Possession is promised by 24 Feb 2024. The completion date has moved by 9 months from the original filing.

At a glance

Project

  • NameTulip
  • TypeResidential/Group Housing
  • Location
    • Anekal
    • Bengaluru Urban
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/308/PR/200323/003378
  • ReraGenie IDRG-KA-07619

Builder

  • NameBRIGHT WAVE PROJECTS PRIVATE LIMITED
  • Entity typeCompany
  • CINU70100TG2013PTC086067
  • Authorized SignatoryAjay Bhagat
  • Other registrations1 more →

Key dates

this monthRegisteredMar 2020First promiseMay 2023Revised toFeb 2024

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on23 Mar 2020
  • Promised completion24 Feb 2024
  • Revised completionRevised to 24 Feb 2024 (originally 24 May 2023)
  • Buildings3 building records
  • Documents filed81 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tulip A---72072
Tulip B---76076
Tulip C---76076

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 2 Mar 2020, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja work-
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Painting-
Elevation workNot applicable
Internal and External work including landscapes as per santioned drawingsNot applicable

Progress on shared amenities41

As on 2 Mar 2020, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsNoNot applicable
Sewage and Drainage SystemYes-
Parks & Tree plantingYes-
Street LightingYes-
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes-
Solid waste management and disposalYes-
Water conservationYes-
Energy managementYes-
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesNoNot applicable
Electricity supply transformer and substationYes-
Emergency Evacuation servicesNoNot applicable
Storm water drainsYes-
Use of renewable energyYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
Club HouseYes-
Community HallYes-
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityYes-
Swimming PoolNoNot applicable
GymYes-
ParksYes-
Power BackupYes-
GasNoNot applicable
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesNoNot applicable
Common entrance and exit for the building / common portico/foyer/verandahNoNot applicable
BasementNoNot applicable
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesYes-
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable

Land and ownership1

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area7,081 sq m
Named landowners1
LandownerVillageDistrict
Damodara Reddy--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 11.00 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectBasavaraj
EngineerAJITH KUMAR D

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

ExtensionMay 2023 → Feb 2024

No reason recorded in the filing

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed81

As listed on the registration, under the names the promoter filed them with; the newest 80 of 81 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/308/PR/200323/003378 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
company registration certificateFile: Certificate of Incorporation.pdf2 Mar 2020
Remaining 4880 feeFile: RERA Fees Payment.pdf2 Mar 2020
bank account pass bookFile: Tulip Passbook.pdf2 Mar 2020
Chartered accountant UDINFile: Tulip C.A UDIN.pdf2 Mar 2020
NOC issued by SEIAAFile: Tulip SEIAA.pdf2 Mar 2020
Area PlanFile: Santion Plan 1.PDF2 Mar 2020
project head detailsFile: Tulip Project Head Details.pdf2 Mar 2020
Project Head PicFile: IMG-20200302-WA0003.jpg2 Mar 2020
Conversion orderFile: Conversion_order.pdf24 Feb 2020
E C FROM Date -01-04-2005 to 31-12-2017File: Tulip EC 1.04. 04 to 12.02.18.pdf24 Feb 2020
joint affidavit cum declarationFile: Tulip JT Affidavit Cum Declaration .pdf24 Feb 2020
Water NOCFile: Tulip Water NOC.pdf24 Feb 2020
Pollution NOCFile: Pollution board NOC.pdf24 Feb 2020
Affidavit under sec 3(1)File: Tulip Affidavit.pdf24 Feb 2020
Sanction Plan 1File: Santion Plan 1.PDF24 Feb 2020
Sanction Plan 2File: Santion Plan 2.PDF24 Feb 2020
Sanction Plan 3File: Santion Plan 3.PDF24 Feb 2020
Tulip CC-
Santion Plan 1-
Santion Plan 2-
Draft Sale Deed_Tulip-converted-
Draft Agreement for Sale_Tulip-converted-
Sale Deed 680 08-09 With RTC-
Santion Plan 3-
Santion Plan 2-
Allotment Letter-converted-
TULIP LOGO-
CONSTRUCTION SPECIFICATIONS-converted-
EC_current-
Tulip Affidafite-
JT Affidavit Cum Declaration -
Khatta_current-
JDA-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Tulip Siingle Line Approval-
Santion Plan 1-
Convertion Letter-
Unnamed document-
Balance Sheet 2018 - 2019File: FY 18-19 Balance Sheet.pdf-
Balance Sheet 2017 - 2018File: FY 17-18 Balance Sheet.pdf-
Balance Sheet 2016 - 2017File: FY 16-17 Balance Sheet.pdf-
Audited Profit and Loss Statement 2018 - 2019File: FY 18-19 Profit & Loss.pdf-
Audited Profit and Loss Statement 2017 - 2018File: FY 17-18 Profit & Loss.pdf-
Audited Profit and Loss Statement 2016 - 2017File: FY 16-17 Profit & Loss.pdf-
Director's Report 2018 - 2019File: FY 18-19 Director Report.pdf-
Director's Report 2017 - 2018File: Director Report 17-18.pdf-
Director's Report 2016 - 2017File: Director Report 16-17.pdf-
Cash Flow Statement 2018 - 2019File: FY 18-19 Cash Flow.pdf-
Cash Flow Statement 2017 - 2018File: Cash Flow 17-18.pdf-
Auditor's Report 2018 - 2019File: FY 18-19 Auditor Report.pdf-
Auditor's Report 2017 - 2018File: FY17-18 Auditor Report.pdf-
Auditor's Report 2016 - 2017File: FY 16-17 Auditors Report.pdf-
Income Tax Return Acknowledgement 2018 - 2019File: Bright wave Projects ITR - 19-20.pdf-
Income Tax Return Acknowledgement 2017 - 2018File: Bright wave Projects ITR 18 -19.pdf-
Income Tax Return Acknowledgement 2016 - 2017File: Bright wave Projects ITR 17.pdf-
Tulip Affidavit Form B-
Prospectus/BrochureFile: Brochure.pdf-
Advertisement Copy 1File: Advertisement.pdf-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one moved by 9 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep Tulip on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmTulipOther 17Dot size: filed unitsN

Filed coordinates, straight-line distance. 17 registered projects within 2 km.

Builder: BRIGHT WAVE PROJECTS PRIVATE LIMITED

Bright Wave Projects Private Limited has 2 registrations on RERA Karnataka, including King George Avenue and Tulip. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if Tulip is delayed beyond 24 Feb 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Tulip?

The registered promoter entity is BRIGHT WAVE PROJECTS PRIVATE LIMITED, a company as per the filing. Its CIN U70100TG2013PTC086067 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Tulip?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at Tulip?

The professionals named in the filing: Architect: Basavaraj; Engineer: AJITH KUMAR D. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Tulip?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Tulip. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Tulip to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.