Home / Browse projects / Thane, Maharashtra / Trinity
Trinity
RG-MH-30598 · RERA P51700030893 · Last updated on MahaRERA portal: 28 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 36 months
- 3 extensions taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Trinity is a Residential / Group Housing project by JD Builders and Developers in Thane, Maharashtra, registered with MahaRERA as P51700030893 on 20 Sep 2021. Possession is promised by 25 Feb 2027. The completion date has moved by 36 months from the original filing.
At a glance
Project
- NameTrinity
- TypeResidential / Group Housing
- Location
- Davadi Road
- Davadi Gaothan
- Kalyan-Dombivali (M Corp.)
- Kalyan
- Thane
- 421203
- Pincode421203
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700030893
- ReraGenie IDRG-MH-30598
Builder
- NameJD Builders and Developers
- Entity typePartnership
- PartnersKaran Ganesh Patil, Ashabai Balkrishna Birade, Kishor Ashok Gaikwad, Sushant Gurunath Patil
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on20 Sep 2021
- Promised completion25 Feb 2027
- Revised completionRevised to 25 Feb 2027 (originally 25 Feb 2024)
- Buildings1 building record
- Documents filed70 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Trinity | NA | 7 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 28 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
6 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 75%.
Trinity: 69% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 75% |
| Sanitary Fittings within the flats / premises | 20% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 60% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 28 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | No | Not applicable |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed33
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Ar Sandeep Pandurang Patil |
| Engineer | J N Chaudhari |
| Chartered Accountant | Deepak Prajapati |
| Partner | Role in project |
|---|---|
| JD Builders and Developers | - |
Extensions applied for3
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDue to some financial issues construction work was stuck more than 1 year. please accept my extension application
Reason as filed by the promoterProject not completed.
Reason as filed by the promoterDue to some financial issues construction work was stuck more than 1 year. please accept my extension application
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 2 Sep 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 2 Sep 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 2 Sep 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 13 Sep 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 25 Feb 2027
Documents filed70
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Disclosure of Sold and Booked InventoryFile: 31-12-2025 sold.pdf | 28 May 2026 |
| Form 1File: 31-12-2025 form 1.pdf | 28 May 2026 |
| Form 2File: 31-12-2025 form 2.pdf | 28 May 2026 |
| Form 3File: 31-12-2025 form 3.pdf | 28 May 2026 |
| Form 1File: 31-03-26 form 1.pdf | 28 May 2026 |
| Form 2File: 31-03-2026 form 2 .pdf | 28 May 2026 |
| Form 3File: 31-03-2026 form 3.pdf | 28 May 2026 |
| Disclosure of Sold and Booked InventoryFile: 31-03-2026 sold.pdf | 28 May 2026 |
| Form 1File: FORM 1 30-06-2025.pdf | 10 Oct 2025 |
| Form 2File: FORM 2 30-06-2025.pdf | 10 Oct 2025 |
| Form 3File: FORM 3 30-06-2025.pdf | 10 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: 30-06-2025.pdf | 10 Oct 2025 |
| Form 1File: FORM 1 30-09-2025 .pdf | 10 Oct 2025 |
| Form 2File: FORM 2 30-09-2025.pdf | 10 Oct 2025 |
| Form 3File: FORM 3 30-09-2025.pdf | 10 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: 30-09-2025.pdf | 10 Oct 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 (31-03-2025).pdf | 28 May 2025 |
| Other - TechnicalFile: PayentReceipt_Print638840500362448546.pdf | 28 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf | 21 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 .pdf | 20 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: JD Builders FORM 3.pdf | 17 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: JD Builders New_page-0001 (1).pdf | 10 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: JD new.pdf | 1 May 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Ref_77_60_725_ R-4_2025_JD BUILDERS AND DEVLOPERS NF_(30-03-2025)_2A CERT (1)-1.pdf | 29 Apr 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5.pdf | 29 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf | 18 Apr 2025 |
| Other - TechnicalFile: PANELTY RECIEPT.pdf | 18 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Ref_77_60_725_ R-4_2025_JD BUILDERS AND DEVLOPERS NF_(30-03-2025)_2A CERT.pdf | 16 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE.pdf | 15 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: JD Builders New format (1).pdf | 14 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Ref_77_60_725_ R-4_2025_JD BUILDERS AND DEVLOPERS NF_(30-03-2025)_2A CERT.pdf | 14 Apr 2025 |
| Declaration in FORM BFile: FORMAT B.pdf | 29 Mar 2025 |
| Other - TechnicalFile: EXTENSION LETTER.pdf | 29 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: (149) NA-KD-149-Form-1.pdf | 11 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Ref_77_60_725_ R-3_2024_JD BUILDERS AND DEVLOPERS NF_(31-12-2024).pdf | 11 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Ref_77_60_725_ R-1_2024_JD BUILDERS AND DEVLOPERS NF_(30-03-2024)_2A CERT_page-0001 (1).pd | 4 Jun 2024 |
| Declaration in FORM BFile: FORM B.pdf | 31 May 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: March 2023 Form 5 (2) (1).pdf | 31 May 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: disclosure of interest.pdf | 27 May 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: declaration about seprate bank account.pdf | 27 May 2024 |
| Proforma of Agreement for saleFile: AGREEMENT FOR SALE.pdf | 16 May 2024 |
| Declaration in FORM BFile: AFFIDAVIT CUM DECLARATION0001.pdf | 4 May 2024 |
| CERSAI detailsFile: SOLD FLAT.pdf | 4 May 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD FLAT.pdf | 4 May 2024 |
| Declaration in FORM BFile: JD05.pdf | 21 Mar 2024 |
| Disclosure of sold/ booked inventoryFile: JD03.pdf | 21 Mar 2024 |
| Disclosure of sold/ booked inventoryFile: JD03.pdf | 21 Mar 2024 |
| Other - TechnicalFile: JD04.pdf | 21 Mar 2024 |
| Other - TechnicalFile: JD04.pdf | 21 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: JD_form_3_maha_rera__compressed (1).pdf | 18 Mar 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Ref_77_60_725_ R-1_2024_JD BUILDERS AND DEVLOPERS NF_(08-01-2024).pdf | 11 Mar 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Mar-2023 annual report.pdf | 11 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 8 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A.pdf | 28 Sep 2021 |
| Disclosure of sold/ booked inventoryFile: 123 (2).pdf | 28 Sep 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE.pdf | 13 Sep 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA FORM 1-compressed.pdf | 4 Sep 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGINEER.pdf | 4 Sep 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 CA.pdf | 4 Sep 2021 |
| Proforma of Allotment letterFile: AGREEMENT FOR SALE.pdf | 4 Sep 2021 |
| Layout approvalFile: PLAN.pdf | 2 Sep 2021 |
| Building plan approvalFile: COMMENCEMENT CERTIFICATE.pdf | 2 Sep 2021 |
| PAN CardFile: COMPANY PAN.pdf | 2 Sep 2021 |
| Copy of the legal title reportFile: legal title report.pdf | 2 Sep 2021 |
| Details of encumbrancesFile: search.pdf | 2 Sep 2021 |
| Copy of Layout Approval (in case of layout)File: PLAN.pdf | 2 Sep 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE.pdf | 2 Sep 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: CC (APPROVAL).pdf | 2 Sep 2021 |
| Declaration about Commencement CertificateFile: declaration of cc.pdf | 2 Sep 2021 |
| Declaration in FORM BFile: Form B.pdf | 2 Sep 2021 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 70 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Trinity on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Davadi Gaothan7,600+ in Thane
Filed coordinates, straight-line distance. 135 registered projects within 2 km.
REGENCY ANANTAM NXT PHASE I
REGENCY NIRMAN LTD
Crown Dombivli 2
LODHA DEVELOPERS LIMITED
Crown Dombivli 1
LODHA DEVELOPERS LIMITED
Casa Belvedere
LODHA DEVELOPERS LIMITED
Fiora G and H
LODHA DEVELOPERS LIMITED
Regency Luxuria Phase III
REGENCY NIRMAN LTD
See every Thane project, with the district possession charts
Builder: JD Builders and Developers
JD Builders and Developers has 1 registration on MahaRERA, including Trinity. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if Trinity is delayed beyond 25 Feb 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Trinity?
The registered promoter entity is JD Builders and Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Trinity?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Trinity?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Trinity?
The professionals named in the filing: Architect: Ar Sandeep Pandurang Patil; Engineer: J N Chaudhari; Chartered Accountant: Deepak Prajapati. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Trinity?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback