ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / Trinity

Registered No litigation declared Residential / Group Housing project

Trinity

By JD Builders and Developers

RG-MH-30598 · RERA P51700030893 · Last updated on MahaRERA portal: 28 May 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 36 months
  • 3 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Feb 2027Possession promisedmoved 36 months from the original
6 of 11Construction stages donefurthest along: Internal walls, 75%
0Complaints at MahaRERAon this registration
Jump to the 70 documents Report an error

Trinity is a Residential / Group Housing project by JD Builders and Developers in Thane, Maharashtra, registered with MahaRERA as P51700030893 on 20 Sep 2021. Possession is promised by 25 Feb 2027. The completion date has moved by 36 months from the original filing.

At a glance

Project

  • NameTrinity
  • TypeResidential / Group Housing
  • Location
    • Davadi Road
    • Davadi Gaothan
    • Kalyan-Dombivali (M Corp.)
    • Kalyan
    • Thane
    • 421203
  • Pincode421203
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700030893
  • ReraGenie IDRG-MH-30598

Builder

  • NameJD Builders and Developers
  • Entity typePartnership
  • PartnersKaran Ganesh Patil, Ashabai Balkrishna Birade, Kishor Ashok Gaikwad, Sushant Gurunath Patil

Key dates

this monthRegisteredSep 2021First promiseFeb 2024Revised toFeb 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on20 Sep 2021
  • Promised completion25 Feb 2027
  • Revised completionRevised to 25 Feb 2027 (originally 25 Feb 2024)
  • Buildings1 building record
  • Documents filed70 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TrinityNA70000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 28 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 75%.

Trinity: 69% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%
Sanitary Fittings within the flats / premises20%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 28 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed33

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots33
Closed/Covered1
Open Space32

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area385 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on28 May 2026

Approvals and building plan

Sanctioning authorityKALYAN DOMBIVALI MUNICIPAL CORPORATION
Permissible FSI918.99
Proposed, not sanctioned919 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGr flr 10 11 12 15 16 Adj to Sagar Hotel Kalyan Shil Road Davadi Naka MIDC Dombivali east Dombivali

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAr Sandeep Pandurang Patil
EngineerJ N Chaudhari
Chartered AccountantDeepak Prajapati
PartnerRole in project
JD Builders and Developers-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700018713Feb 2024 → Feb 2025

Reason as filed by the promoterDue to some financial issues construction work was stuck more than 1 year. please accept my extension application

EXT51700027197Feb 2024 → Feb 2026

Reason as filed by the promoterProject not completed.

EA05062621258Feb 2024 → Feb 2027

Reason as filed by the promoterDue to some financial issues construction work was stuck more than 1 year. please accept my extension application

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 2 Sep 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Sep 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 Sep 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Sep 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 25 Feb 2027

Documents filed70

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Disclosure of Sold and Booked InventoryFile: 31-12-2025 sold.pdf28 May 2026
Form 1File: 31-12-2025 form 1.pdf28 May 2026
Form 2File: 31-12-2025 form 2.pdf28 May 2026
Form 3File: 31-12-2025 form 3.pdf28 May 2026
Form 1File: 31-03-26 form 1.pdf28 May 2026
Form 2File: 31-03-2026 form 2 .pdf28 May 2026
Form 3File: 31-03-2026 form 3.pdf28 May 2026
Disclosure of Sold and Booked InventoryFile: 31-03-2026 sold.pdf28 May 2026
Form 1File: FORM 1 30-06-2025.pdf10 Oct 2025
Form 2File: FORM 2 30-06-2025.pdf10 Oct 2025
Form 3File: FORM 3 30-06-2025.pdf10 Oct 2025
Disclosure of Sold and Booked InventoryFile: 30-06-2025.pdf10 Oct 2025
Form 1File: FORM 1 30-09-2025 .pdf10 Oct 2025
Form 2File: FORM 2 30-09-2025.pdf10 Oct 2025
Form 3File: FORM 3 30-09-2025.pdf10 Oct 2025
Disclosure of Sold and Booked InventoryFile: 30-09-2025.pdf10 Oct 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 (31-03-2025).pdf28 May 2025
Other - TechnicalFile: PayentReceipt_Print638840500362448546.pdf28 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf21 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 .pdf20 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: JD Builders FORM 3.pdf17 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: JD Builders New_page-0001 (1).pdf10 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: JD new.pdf1 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Ref_77_60_725_ R-4_2025_JD BUILDERS AND DEVLOPERS NF_(30-03-2025)_2A CERT (1)-1.pdf29 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5.pdf29 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf18 Apr 2025
Other - TechnicalFile: PANELTY RECIEPT.pdf18 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Ref_77_60_725_ R-4_2025_JD BUILDERS AND DEVLOPERS NF_(30-03-2025)_2A CERT.pdf16 Apr 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE.pdf15 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: JD Builders New format (1).pdf14 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Ref_77_60_725_ R-4_2025_JD BUILDERS AND DEVLOPERS NF_(30-03-2025)_2A CERT.pdf14 Apr 2025
Declaration in FORM BFile: FORMAT B.pdf29 Mar 2025
Other - TechnicalFile: EXTENSION LETTER.pdf29 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: (149) NA-KD-149-Form-1.pdf11 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Ref_77_60_725_ R-3_2024_JD BUILDERS AND DEVLOPERS NF_(31-12-2024).pdf11 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Ref_77_60_725_ R-1_2024_JD BUILDERS AND DEVLOPERS NF_(30-03-2024)_2A CERT_page-0001 (1).pd4 Jun 2024
Declaration in FORM BFile: FORM B.pdf31 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: March 2023 Form 5 (2) (1).pdf31 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: disclosure of interest.pdf27 May 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: declaration about seprate bank account.pdf27 May 2024
Proforma of Agreement for saleFile: AGREEMENT FOR SALE.pdf16 May 2024
Declaration in FORM BFile: AFFIDAVIT CUM DECLARATION0001.pdf4 May 2024
CERSAI detailsFile: SOLD FLAT.pdf4 May 2024
Disclosure of sold/ booked inventoryFile: SOLD FLAT.pdf4 May 2024
Declaration in FORM BFile: JD05.pdf21 Mar 2024
Disclosure of sold/ booked inventoryFile: JD03.pdf21 Mar 2024
Disclosure of sold/ booked inventoryFile: JD03.pdf21 Mar 2024
Other - TechnicalFile: JD04.pdf21 Mar 2024
Other - TechnicalFile: JD04.pdf21 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: JD_form_3_maha_rera__compressed (1).pdf18 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Ref_77_60_725_ R-1_2024_JD BUILDERS AND DEVLOPERS NF_(08-01-2024).pdf11 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Mar-2023 annual report.pdf11 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf8 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A.pdf28 Sep 2021
Disclosure of sold/ booked inventoryFile: 123 (2).pdf28 Sep 2021
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE.pdf13 Sep 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA FORM 1-compressed.pdf4 Sep 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGINEER.pdf4 Sep 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 CA.pdf4 Sep 2021
Proforma of Allotment letterFile: AGREEMENT FOR SALE.pdf4 Sep 2021
Layout approvalFile: PLAN.pdf2 Sep 2021
Building plan approvalFile: COMMENCEMENT CERTIFICATE.pdf2 Sep 2021
PAN CardFile: COMPANY PAN.pdf2 Sep 2021
Copy of the legal title reportFile: legal title report.pdf2 Sep 2021
Details of encumbrancesFile: search.pdf2 Sep 2021
Copy of Layout Approval (in case of layout)File: PLAN.pdf2 Sep 2021
Building Plan Approval / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE.pdf2 Sep 2021
Commencement Certificates / NA Order for plotted developmentFile: CC (APPROVAL).pdf2 Sep 2021
Declaration about Commencement CertificateFile: declaration of cc.pdf2 Sep 2021
Declaration in FORM BFile: Form B.pdf2 Sep 2021

How this compares with Thane

24%of Thane projects moved their completion datethis one moved by 36 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Trinity on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Davadi Gaothan7,600+ in Thane

2 kmTrinityCompleted 33Lapsed / revoked 26Other 76Dot size: filed unitsN

Filed coordinates, straight-line distance. 135 registered projects within 2 km.

Builder: JD Builders and Developers

JD Builders and Developers has 1 registration on MahaRERA, including Trinity. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Trinity is delayed beyond 25 Feb 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Trinity?

The registered promoter entity is JD Builders and Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Trinity?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Trinity?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Trinity?

The professionals named in the filing: Architect: Ar Sandeep Pandurang Patil; Engineer: J N Chaudhari; Chartered Accountant: Deepak Prajapati. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Trinity?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Trinity. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Trinity to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.