ReraGenieLog inGet a buyer report

Home / Browse projects / Dakshina Kannada, Karnataka / Trikaaya Adita

Registration approved Mixed Development project

Trikaaya Adita

By Trikaaya Developers

RG-KA-75768 · RERA PRM/KA/RERA/1257/334/PR/181210/002197

Source: official RERA Karnataka filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No complaints on record
  • Separate project account declared
Oct 2019Possession promisedmoved 12 months from the original
0Complaints at RERA Karnatakaon this registration
Jump to the 49 documents Report an error

Trikaaya Adita is a Mixed Development project by Trikaaya Developers in Dakshina Kannada, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1257/334/PR/181210/002197 on 10 Dec 2018. Possession is promised by 31 Oct 2019. The completion date has moved by 12 months from the original filing.

At a glance

Project

  • NameTrikaaya Adita
  • TypeMixed Development
  • Location
    • Mangalore
    • Dakshina Kannada
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1257/334/PR/181210/002197
  • ReraGenie IDRG-KA-75768

Builder

  • NameTrikaaya Developers
  • Entity typePartnership Firm
  • Authorized SignatoryShashanka Moodabidri

Key dates

this monthRegisteredDec 2018First promiseOct 2018Revised toOct 2019

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on10 Dec 2018
  • Promised completion31 Oct 2019
  • Revised completionRevised to 31 Oct 2019 (originally 31 Oct 2018)
  • Buildings1 building record
  • Documents filed49 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
trikaaya adita-----26

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawingsNot applicable

Progress on shared amenities41

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsYes-
Sewage and Drainage SystemYes-
Parks & Tree plantingYes-
Street LightingYes-
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes-
Solid waste management and disposalNoNot applicable
Water conservationYes-
Energy managementYes-
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesYes-
Electricity supply transformer and substationYes-
Emergency Evacuation servicesYes-
Storm water drainsYes-
Use of renewable energyYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupYes-
GasYes-
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesNoNot applicable
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesYes-
Provision for lodging of management staff and security staffYes-
Water conservation and renewable energyYes-

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area996 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 3.39 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectmR. dAMODAR SHENOY
EngineerPremanand Shenoy

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EX/PRM/KA/RERA/1257/334/PR/220613/002197Oct 2018 → Oct 2019

Reason as filed by the promoterShortage of Building Materials, Concrete, Jalli etc

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed49

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1257/334/PR/181210/002197 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CertificateFile: trikaya pan'.pdf-
Architect Certificate for Work Completion Schedule till DateFile: archi status.pdf-
Engineer Certificate for Work Completion Schedule till DateFile: status of work.pdf-
CA Certificate for Funds UtilizationFile: CA FUNDS UTILIZATION.pdf-
Architect Certificate for Pending Work Completion Schedule.File: archi pending works.pdf-
Engineer Certificate for Pending Work Completion Schedule.File: work pending.pdf-
CA Certificate for Funds required for Project CompletionFile: CA FUNDS REQUIRED.pdf-
AffidavitFile: FORM B.pdf-
Latest Encumbrance CertificateFile: ec.jpg-
Details Of Sold/ Un-sold UnitsFile: SoldUnsoldDetails.xlsx-
license-
approved 5 mb-
approved-
allotmet-
allotmet-
sale deed-
license-
license-
allotmet-
BROCHURE-
Project Specification-
EC 2-
khata-
Trikaaya Partnership Deed-
ScanImage08-
Project Specification-
license-
fire-
BROCHURE-
BROCHURE-
license-
Balance Sheet 2016 - 2017File: B S 17.jpg-
Balance Sheet 2015 - 2016File: B S 16.jpg-
Balance Sheet 2014 - 2015File: B S 15.jpg-
Audited Profit and Loss Statement 2016 - 2017File: P&L 2017.jpg-
Audited Profit and Loss Statement 2015 - 2016File: P & L 2016.jpg-
Audited Profit and Loss Statement 2014 - 2015File: P&L 2015.jpg-
Director's Report 2016 - 2017File: directors report.pdf-
Director's Report 2015 - 2016File: directors report.pdf-
Director's Report 2014 - 2015File: directors report.pdf-
Cash Flow Statement 2016 - 2017File: CASH FLOW.pdf-
Cash Flow Statement 2015 - 2016File: CASH FLOW.pdf-
Auditor's Report 2016 - 2017File: Auditors report.pdf-
Auditor's Report 2015 - 2016File: Auditors report.pdf-
Auditor's Report 2014 - 2015File: Auditors report.pdf-
Income Tax Return Acknowledgement 2016 - 2017File: IT ACK RECIEPT.pdf-
Income Tax Return Acknowledgement 2015 - 2016File: IT ACK RECIEPT.pdf-
Income Tax Return Acknowledgement 2014 - 2015File: IT ACK RECIEPT.pdf-
FORM B-

How this compares with Dakshina Kannada

30%of Dakshina Kannada projects moved their completion datethis one moved by 12 months
0%of Dakshina Kannada registrations are shown as withdrawn or revokedthis one is not

Computed across the 620+ Dakshina Kannada projects on ReraGenie, from their own filings.

Keep Trikaaya Adita on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Dakshina Kannada620+ in Dakshina Kannada

Builder: Trikaaya Developers

Trikaaya Developers has 1 registration on RERA Karnataka, including Trikaaya Adita. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Dakshina Kannada district page.

Frequently asked questions

What are my rights if Trikaaya Adita is delayed beyond 31 Oct 2019?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Trikaaya Adita?

The registered promoter entity is Trikaaya Developers, a partnership firm as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Trikaaya Adita?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at Trikaaya Adita?

The professionals named in the filing: Architect: mR. dAMODAR SHENOY; Engineer: Premanand Shenoy. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Trikaaya Adita?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Trikaaya Adita. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Trikaaya Adita to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.