Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Dec 2029Possession promisedno revision filed
0 of 18Construction stages donefurthest along: Earth work and other leveling..., 75%
386 of 444Units unsoldnot recorded sold or booked
0Complaints at RERA Karnatakaon this registration
Jump to the 108 documents Report an error

Trifecta Veranza is a Residential/Group Housing project by TRIFECTA PROJECTS PRIVATE LIMITED in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/308/PR/210126/008418 on 21 Jan 2026. Possession is promised by 31 Dec 2029. 58 of the 444 units on this registration are recorded sold or booked, and 0 of 18 construction stages are filed complete.

At a glance

Project

  • NameTrifecta Veranza
  • TypeResidential/Group Housing
  • Location
    • Anekal
    • Bengaluru Urban
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1251/308/PR/210126/008418
  • ReraGenie IDRG-KA-78590

Builder

  • NameTRIFECTA PROJECTS PRIVATE LIMITED
  • Entity typeCompany
  • CINU45200KA2012PTC062831
  • GSTIN29AACCE9717F1ZG
  • Authorized SignatoryGedi Sylendra Kumar Reddy
  • Managing Director (MD)RAMIREDDYVENKATA SUBBA REDDY
  • DirectorsRAMIREDDYVENKATA SUBBA REDDY, SARADA REDDY RAMIREDDY, GEDI SYLENDRA KUMAR REDDY
  • Project HeadGEDI SYLENDRAKUMAR
  • Other registrations5 more →

Key dates

this monthRegisteredJan 2026PromisedDec 2029

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on21 Jan 2026
  • Promised completion31 Dec 2029
  • Revised completionNone
  • Buildings2 building records
  • Documents filed108 files

Current status

13%58 of 444 units booked
12.9%Of the estimated cost spent so far

Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A---2220222
B---2220222

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 18 construction stages are filed complete. The stage furthest along is Earth work and other leveling preparation work, at 75%.

Building: 18% average across the applicable activities

ActivityProgress
Earth work and other leveling preparation work75%
Foundation footing work60%
Upto Plinth Level60%
Sub-structure flooring (Parking Floor, more than one floor below general ground level)25%
Retaining wall (All types)40%
RCC or MS Framed structure25%
Masonry Construction15%
Plastering inside , outside & Ceiling10%
Joinery: Doors, Windows, Ventilators etc5%
Basic work of Water supply, Sanitary and Electrification0%
Dadoing, Skirting, Flooring, Tiles work (All types)0%
Railing and Grill fixing0%
Electrification, Water supply and Sanitary Finishing0%
Painting0%
Fire prevention and fire fighting fitting and fixture with network0%
Weather Proof work(tile,concrete)0%
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work0%
Internal and External work including landscapes as per sanctioned drawings0%

Progress on shared amenities40

As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes0%
Sewage and Drainage SystemYes0%
Water conservation/rain water harvesting/recharge of ground waterYes0%
Energy managementYes0%
Fire protection and fire safety requirementsYes0%
Solid waste management and disposalYes0%
Emergency Evacuation servicesYes0%
Internal Roads & FootpathsYes0%
Electricity supply transformer and substationYes0%
Storm water drainsYes0%
Use of renewable energyYes0%
Sewage Treatment Plant (STP)Yes0%
Parks & Tree plantingYes0%
Street LightingYes0%
ElectricityYes0%
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes0%
Club HouseYes0%
Community HallYes0%
Outdoor Sports facilityYes0%
Indoor Sports facilityYes0%
Swimming PoolYes0%
GymYes0%
ParksYes0%
Power BackupYes0%
Piped GasYes0%
Water and SanitationYes0%
Air ConditioningNoNot applicable
StaircasesYes0%
LiftsYes0%
Corridor/LobbiesYes0%
Fire escapesYes0%
Common entrance and exit for the building/common portico/foyer/verandahYes0%
BasementYes0%
TerraceYes0%
Outer WallYes0%
Open parking areasNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes0%
Common storage spacesYes0%

Land and ownership2

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Named landowners2
LandownerVillageDistrict
L Shankar--
L Shankar--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 248.02 cr
Cost incurredRs 31.91 cr
Spent of the estimate12.87%
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 164.74 crRs 23.41 cr
On-site expenditure-Site OverheadRs 51.00 crRs 6.90 cr
Principal sum and interest payable to financial institutions-Scheduled BanksRs 16.50 cr-
On-site expenditure-Salaries of workersRs 5.00 crRs 75.00 lakh
On-site expenditure-Consultants FeesRs 5.00 crRs 75.00 lakh
Other CostRs 5.00 cr-
On-site expenditure-Cost Of Services(Water, Electricity, Sewage)Rs 78.00 lakhRs 10.00 lakh

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSameer Deshpande
EngineerRamesh B
Chartered AccountantB MANOHAR BABU

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed108

As listed on the registration, under the names the promoter filed them with; the newest 80 of 108 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/308/PR/210126/008418 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Rera Q2 Veranza.pdf15 Oct 2026
Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Form-5, Architect VERANZA 30092026.pdf15 Oct 2026
Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: FORM 6 ENGINEER CERTIFICATE VERANZA 30092026.pdf15 Oct 2026
Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Rera Q1 Veranza.pdf15 Jul 2026
Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Form-5, Architect VERANZA 30062026.pdf15 Jul 2026
Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: FORM 6 ENGINEER CERTIFICATE VERANZA 30062026.pdf15 Jul 2026
Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: FORM 4 CA CERTIFICATE Q4.pdf15 Apr 2026
Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Form-5, Architect VERANZA 31032026.pdf15 Apr 2026
Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: FORM 6 ENGINEER CERTIFICATE VERANZA 31032026.pdf15 Apr 2026
No Sales ClarificationFile: No SALES CLARIFICATION.pdf17 Jan 2026
Bank Loan ClarificationFile: Bank Loan Clarification.pdf17 Jan 2026
Latest EC Sy No 96File: EC Sy No 96.pdf17 Jan 2026
Latest EC Sy No 97-3File: EC Sy No 97-3.pdf17 Jan 2026
Affidavit Cum DeclarationFile: Affidavit Cum Declaration.pdf17 Jan 2026
Affidavit Form 3BFile: Affidavit Form 3B.pdf17 Jan 2026
Affidavit Non-LitigationFile: Affidavit Non-Litigation.pdf17 Jan 2026
Affidavit NotarisedFile: Affidavit Notarised.pdf17 Jan 2026
DP Plan OrderFile: Development Plan Letter.pdf17 Jan 2026
ADLR Survey SketchFile: Survey Sketch.pdf17 Jan 2026
ADLR Survey SketchFile: Survey Sketch 1.pdf17 Jan 2026
KTCP NOCFile: NOC KTCP.pdf17 Jan 2026
CLUFile: CLU.pdf17 Jan 2026
Structural Stability certificate with Structural Engineer LicenceFile: Structural Stability Certificate.pdf17 Jan 2026
Proforma Allottment LetterFile: Proforma Allotment Letter.pdf17 Jan 2026
NOC FireFile: NOC Fire.pdf17 Jan 2026
STPFile: STP Veranza.pdf17 Jan 2026
Source of waterFile: Source of Water Borewell BWSSB clarification.pdf17 Jan 2026
Brief Estimated cost of constructionFile: Brief Estimated Cost of Construction.pdf17 Jan 2026
Proforma Agreement for SaleFile: Proforma Agreement for Sale.pdf17 Jan 2026
RTC, survey 96-
Mutation, survey 96-
Encumbrance Certificate, survey 96-
Conversion/Alienation Order, survey 96-
Sale/Title/Gift Deed, survey 96-
JDA, survey 96-
Khatha, survey 96-
RTC, survey 97/3-
Mutation, survey 97/3-
Encumbrance Certificate, survey 97/3-
Conversion/Alienation Order, survey 97/3-
Sale/Title/Gift Deed, survey 97/3-
JDA, survey 97/3-
Khatha, survey 97/3-
Registration CertificateFile: KYC Company Reg Certificate.PDF-
Memorandum of AssociationFile: KYC Company MOA.pdf-
Article of AssociationFile: KYC Company AOA.pdf-
GST CertificateFile: KYC Company GST Certificate.pdf-
Organization StructureFile: KYC Company MOA.pdf-
Certificate issued by CA Form 1File: Form 1.pdf-
Certificate issued by Architect Form 2File: Form 2 Veranza.pdf-
Certificate issued by Engineer Form 3File: Form 6 Trifecta Veranza.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: Affidavit Non-Litigation.pdf-
Balance Sheet 2024 - 2025File: BS FY 24-25.pdf-
Balance Sheet 2023 - 2024File: BS FY 23-24.pdf-
Balance Sheet 2022 - 2023File: BS FY 22-23.pdf-
Audited Profit and Loss Statement 2024 - 2025File: PnL FY 24-25.pdf-
Audited Profit and Loss Statement 2023 - 2024File: PnL FY 23-24.pdf-
Audited Profit and Loss Statement 2022 - 2023File: PnL FY 22-23.pdf-
Income Tax Return Acknowledgement 2024 - 2025File: ITR Ack FY 24-25.pdf-
Income Tax Return Acknowledgement 2023 - 2024File: ITR Ack FY 23-24.pdf-
Income Tax Return Acknowledgement 2022 - 2023File: ITR Ack FY 22-23.pdf-
Director's Report 2024 - 2025File: DR FY 24-25.pdf-
Director's Report 2023 - 2024File: DR FY 23-24.pdf-
Director's Report 2022 - 2023File: DR FY 22-23.pdf-
Cash Flow Statement 2024 - 2025File: CFS FY 24-25.pdf-
Cash Flow Statement 2023 - 2024File: CFS FY 23-24.pdf-
Auditor's Report 2024 - 2025File: AR FY 24-25.pdf-
Auditor's Report 2023 - 2024File: AR FY 23-24.pdf-
Auditor's Report 2022 - 2023File: AR FY 22-23.pdf-
Plan J Approval Letter-
Plan K Development Plan-
DP PLAN-
Project Specifications-
Relinquishment Deed of Park-
Proforma Allotment Letter-
Affidavit 3B-
Affidavit Notarised-

How this compares with Bengaluru Urban

13%of this project is bookeddistrict median 51%
34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep Trifecta Veranza on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

Builder: TRIFECTA PROJECTS PRIVATE LIMITED

TRIFECTA PROJECTS PRIVATE LIMITED has 6 registrations on RERA Karnataka, including Trifecta Veranza and TRIFECTA RETTO. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if Trifecta Veranza is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Trifecta Veranza?

The registered promoter entity is TRIFECTA PROJECTS PRIVATE LIMITED, a company as per the filing. Its CIN U45200KA2012PTC062831 and GSTIN 29AACCE9717F1ZG can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Trifecta Veranza?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at Trifecta Veranza?

The professionals named in the filing: Architect: Sameer Deshpande; Engineer: Ramesh B; Chartered Accountant: B MANOHAR BABU. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Trifecta Veranza?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Trifecta Veranza. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Trifecta Veranza to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.