Home / Browse projects / Bengaluru Urban, Karnataka / TRIFECTA VANTO PHASE-2

Registration approved No litigation declared Residential/Group Housing project

TRIFECTA VANTO PHASE-2

By TRIFECTA PROJECTS PRIVATE LIMITED

RG-KA-12738 · RERA PRM/KA/RERA/1251/310/PR/250625/007871 · Last updated on RERA Karnataka portal: 15 Oct 2026

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Mar 2028Possession promisedno revision filed
6 of 17Construction stages donefurthest along: Masonry Construction, 70%
97 of 202Units unsoldnot recorded sold or booked
0Complaints at RERA Karnatakaon this registration
Jump to the 374 documents Report an error

TRIFECTA VANTO PHASE-2 is a Residential/Group Housing project by TRIFECTA PROJECTS PRIVATE LIMITED in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/250625/007871 on 25 Jun 2025. Possession is promised by 31 Mar 2028. 105 of the 202 units on this registration are recorded sold or booked, and 6 of 17 construction stages are filed complete.

At a glance

Project

  • NameTRIFECTA VANTO PHASE-2
  • TypeResidential/Group Housing
  • Location
    • Bengaluru South
    • Bengaluru Urban
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1251/310/PR/250625/007871
  • ReraGenie IDRG-KA-12738

Builder

  • NameTRIFECTA PROJECTS PRIVATE LIMITED
  • Entity typeCompany
  • CINU45200KA2012PTC062831
  • GSTIN29AACCE9717F1ZG
  • Authorized SignatoryRamireddy Venka Subba Reddy
  • MdSubbarteddy
  • DirectorsSubbareddy, RAMIREDDY SARADA REDDY, GEDI SYLENDRAKUMAR REDDY
  • Project HeadSubbareddy
  • Other registrations5 more →

Key dates

this monthRegisteredJun 2025PromisedMar 2028

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on25 Jun 2025
  • Promised completion31 Mar 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed374 files

Current status

52%105 of 202 units booked
42.3%Of the estimated cost spent so far

Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower C---2020202

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 17 construction stages are filed complete. The stage furthest along is Masonry Construction, at 70%.

Building: 48% average across the applicable activities

ActivityProgress
Earth work and other leveling preparation work100%
Foundation footing work100%
Upto Plinth Level100%
Sub-structure flooring (Parking Floor, more than one floor below general ground level)100%
Retaining wall (All types)100%
RCC or MS Framed structure100%
Masonry Construction70%
Plastering inside , outside & Ceiling50%
Joinery: Doors, Windows, Ventilators etc0%
Basic work of Water supply, Sanitary and Electrification0%
Dadoing, Skirting, Flooring, Tiles work (All types)0%
Railing and Grill fixing0%
Electrification, Water supply and Sanitary Finishing20%
Painting20%
Fire prevention and fire fighting fitting and fixture with network20%
Weather Proof work(tile,concrete)20%
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work20%
Internal and External work including landscapes as per sanctioned drawingsNot applicable

Progress on shared amenities40

As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes10%
Sewage and Drainage SystemYes10%
Water conservation/rain water harvesting/recharge of ground waterYes10%
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes10%
Solid waste management and disposalYes10%
Emergency Evacuation servicesYes10%
Internal Roads & FootpathsYes10%
Electricity supply transformer and substationYes10%
Storm water drainsYes10%
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)Yes10%
Parks & Tree plantingYes10%
Street LightingYes10%
ElectricityYes10%
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes10%
Club HouseYes80%
Community HallYes80%
Outdoor Sports facilityYes0%
Indoor Sports facilityYes80%
Swimming PoolYes80%
GymYes80%
ParksYes80%
Power BackupYes0%
Piped GasNoNot applicable
Water and SanitationYes0%
Air ConditioningYes0%
StaircasesYes70%
LiftsYes70%
Corridor/LobbiesYes70%
Fire escapesYes70%
Common entrance and exit for the building/common portico/foyer/verandahYes100%
BasementYes70%
TerraceYes70%
Outer WallYes70%
Open parking areasYes70%
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable
Common storage spacesNoNot applicable

Land and ownership24

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Named landowners24
LandownerVillageDistrict
Trifecta Projects Pvt. Ltd. Represented by RV Subbareddy--
Trifecta Projects Pvt. Ltd. Represented by RV Subbareddy--
N. Nirmala--
K Shivaramreddy--
Deeksha (Legal Heir of Geetha)--
K H Parvathamma--
K H Saraswathamma--
Ashwantha Narayana Reddy--
K.H Ramanjaneya Reddy--
R. Jaimala--
KH Saraswathamma--
K H Parvathamma--
Savitha N--
N. Ashok Kumar--
N. Suresh--
Ashwantha Narayana Reddy--
Srinivasareddy--
Savithramma--
Sarojanamma--
Kamalamma--
Susheelamma--
Kamalamma--
Thanish Kumar--
Divya Ravanam--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 163.93 cr
Cost incurredRs 69.37 cr
Spent of the estimate42.32%
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 133.58 crRs 46.70 cr
On-site expenditure-Consultants FeesRs 10.10 crRs 10.46 cr
Principal sum and interest payable to financial institutions-Non Banking financial institution (NBFC)Rs 9.75 crRs 3.52 cr
On-site expenditure-Site OverheadRs 7.50 crRs 25.00 lakh
On-site expenditure-Salaries of workersRs 2.00 crRs 50.00 lakh
On-site expenditure-Cost Of Services(Water, Electricity, Sewage)Rs 1.00 crRs 25.00 lakh
Payment of taxes-Rs 7.70 cr

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRevathi SR
EngineerRamesh B
Chartered AccountantB Manohar Babu

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed374

As listed on the registration, under the names the promoter filed them with; the newest 80 of 374 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/250625/007871 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: RERA Q2 Vanto Phase II.pdf15 Oct 2026
Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Form-5, Architect VANTO-2 30092026.pdf15 Oct 2026
Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: FORM 6 ENGINEER CERTIFICATE VANTO 30092026.pdf15 Oct 2026
Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: RERA Q1 Vanto Phase II.pdf15 Jul 2026
Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Form 5 -Architect certificate Vanto Phase II.pdf15 Jul 2026
Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: FORM 6 ENGINEER CERTIFICATE VANTO 30062026.pdf15 Jul 2026
Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: FORM 4 CA CERTIFICATE Q4.pdf15 Apr 2026
Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Form-5, Architect VANTO-2 31032026.pdf15 Apr 2026
Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: FORM 6 ENGINEER CERTIFICATE VANTO 31032026.pdf15 Apr 2026
Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4 Vanto Phase 2.pdf13 Jan 2026
Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Form-5, Architect VANTO 31122025.pdf13 Jan 2026
Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: FORM 6 ENGINEER CERTIFICATE VANTO 31122025.pdf13 Jan 2026
37-2,4,5,6,7,8,9,10,11,12,19,20 COURT PARTISHAN DOCMENTFile: 37-2,4,5,6,7,8,9,10,11,12,19,20 COURT PARTISHAN DOCMENT.pdf18 Jun 2025
37-2,12 GWORAMMAFile: 37-2,12 GWORAMMA.pdf18 Jun 2025
37-2,AND 7,8 MOTHAR DOCMENT PANCHYATH PORTISHAN DEEDFile: 37-2,AND 7,8 MOTHAR DOCMENT PANCHYATH PORTISHAN DEED.pdf18 Jun 2025
37-3 ,13,14,15,16,17 PORTISHANDEEDFile: 37-3 ,13,14,15,16,17 PORTISHANDEED.pdf18 Jun 2025
37-3 MOTHAR DOCMENTFile: 37-3 MOTHAR DOCMENT.pdf18 Jun 2025
37-3 OLD RTCFile: 37-3 OLD RTC.pdf18 Jun 2025
37-4,11 BHAGYAMMAFile: 37-4,11 BHAGYAMMA.pdf18 Jun 2025
37-5,10 PARVATHAMMAFile: 37-5,10 PARVATHAMMA.pdf18 Jun 2025
37-6,9 SARASWATHAMMAFile: 37-6,9 SARASWATHAMMA.pdf18 Jun 2025
37-8 TO 37-19 GIFT DEEDFile: 37-8 TO 37-19 GIFT DEED.pdf18 Jun 2025
37-18 GIFTDEEDFile: 37-18 GIFTDEED.pdf18 Jun 2025
37-19 and 37-20File: 37-19 and 37-20.pdf18 Jun 2025
37-19 TO 20 SALEDEED TRIFECTAFile: 37-19 TO 20 SALEDEED TRIFECTA.pdf18 Jun 2025
43-4B FULL LAND SALEDEEDFile: 43-4B FULL LAND SALEDEED.pdf18 Jun 2025
Sale Deed 37-19 6GFile: Sale Deed 37-19 6G.pdf18 Jun 2025
Title 5 Sale Deed 37-19 6GFile: Title 5 Sale Deed 37-19 6G.pdf18 Jun 2025
Title 6 Sale Deed 37-1 3A 5G CompressedFile: Title 6 Sale Deed 37-1 3A 5G Compressed.pdf18 Jun 2025
MR Set 1File: MR Set 1.pdf16 Jun 2025
MR Set 2File: MR Set 2.pdf16 Jun 2025
RTC Set 1File: RTC Set 1.pdf16 Jun 2025
RTC Set 2File: RTC Set 2.pdf16 Jun 2025
Rev Conversion 37-1File: Rev Conversion 37-1.pdf16 Jun 2025
Rev Conversion 37-2File: Rev Conversion 37-2.pdf16 Jun 2025
Rev Conversion 37-3File: Rev Conversion 37-3.pdf16 Jun 2025
Rev Conversion 37-4File: Rev Conversion 37-4.pdf16 Jun 2025
Rev Conversion 37-5File: Rev Conversion 37-5.pdf16 Jun 2025
Rev Conversion 37-6File: Rev Conversion 37-6.pdf16 Jun 2025
Rev Conversion 37-7File: Rev Conversion 37-7.pdf16 Jun 2025
Rev Conversion 37-8File: Rev Conversion 37-8.pdf16 Jun 2025
Rev Conversion 37-9File: Rev Conversion 37-9.pdf16 Jun 2025
Rev Conversion 37-10File: Rev Conversion 37-10.pdf16 Jun 2025
Rev Conversion 37-11File: Rev Conversion 37-11.pdf16 Jun 2025
Rev Conversion 37-12File: Rev Conversion 37-12.pdf16 Jun 2025
Rev Conversion 37-13File: Rev Conversion 37-13.pdf16 Jun 2025
Rev Conversion 37-14File: Rev Conversion 37-14.pdf16 Jun 2025
Rev Conversion 37-15File: Rev Conversion 37-15.pdf16 Jun 2025
Rev Conversion 37-16File: Rev Conversion 37-16.pdf16 Jun 2025
Rev Conversion 37-17File: Rev Conversion 37-17.pdf16 Jun 2025
Rev Conversion 37-18File: Rev Conversion 37-18.pdf16 Jun 2025
Rev Conversion 37-19File: Rev Conversion 37-19.pdf16 Jun 2025
Rev Conversion 37-20File: Rev Conversion 37-20.pdf16 Jun 2025
Rev Conversion 43-4BFile: Rev Conversion 43-4B.pdf16 Jun 2025
Rev EC 37 1File: Rev EC 37 1.pdf16 Jun 2025
Rev EC 37 3File: Rev EC 37 3.pdf16 Jun 2025
Rev EC 37 8File: Rev EC 37 8.pdf16 Jun 2025
Rev EC 37 13File: Rev EC 37 13.pdf16 Jun 2025
Rev EC 37 14File: Rev EC 37 14.pdf16 Jun 2025
Rev EC 37 15File: Rev EC 37 15.pdf16 Jun 2025
Rev EC 37 16File: Rev EC 37 16.pdf16 Jun 2025
Rev EC 37 17File: Rev EC 37 17.pdf16 Jun 2025
Rev EC 37 18File: Rev EC 37 18.pdf16 Jun 2025
Rev EC for Sy no 37(2) from 01-01-2004 to 20-03-2024File: Rev EC for Sy no 37(2) from 01-01-2004 to 20-03-2024.pdf16 Jun 2025
Rev EC for Sy no 37(4) from 01-01-2004 to 20-03-2024File: Rev EC for Sy no 37(4) from 01-01-2004 to 20-03-2024.pdf16 Jun 2025
Rev EC for Sy no 37(5) from 01-01-2004 to 20-03-2024File: Rev EC for Sy no 37(5) from 01-01-2004 to 20-03-2024.pdf16 Jun 2025
Rev EC for Sy no 37(6) from 01-01-2004 to 20-03-2024File: Rev EC for Sy no 37(6) from 01-01-2004 to 20-03-2024.pdf16 Jun 2025
Rev EC for Sy no 37(7) from 01-01-2004 to 20-03-2024File: Rev EC for Sy no 37(7) from 01-01-2004 to 20-03-2024.pdf16 Jun 2025
Rev EC for Sy no 37(8) from 01-01-2004 to 20-03-2024 extent 13 guntasFile: Rev EC for Sy no 37(8) from 01-01-2004 to 20-03-2024 extent 13 guntas.pdf16 Jun 2025
Rev EC for Sy no 37(8) from 01-01-2004 to 20-03-2024 extent 39 guntasFile: Rev EC for Sy no 37(8) from 01-01-2004 to 20-03-2024 extent 13 guntas.pdf16 Jun 2025
Rev EC for Sy no 37(9) from 01-01-2004 to 20-03-2024File: Rev EC for Sy no 37(9) from 01-01-2004 to 20-03-2024.pdf16 Jun 2025
Rev EC for Sy no 37(10) from 01-01-2004 to 20-03-2024File: Rev EC for Sy no 37(10) from 01-01-2004 to 20-03-2024.pdf16 Jun 2025
Rev EC for Sy no 37(11) from 01-01-2004 to 20-03-2024File: Rev EC for Sy no 37(11) from 01-01-2004 to 20-03-2024.pdf16 Jun 2025
Rev EC for Sy no 37(12) from 01-01-2004 to 20-03-2024File: Rev EC for Sy no 37(12) from 01-01-2004 to 20-03-2024.pdf16 Jun 2025
Rev EC for Sy no 43(4B) from 01-04-2004 to 20-03-2024File: Rev EC for Sy no 43(4B) from 01-04-2004 to 20-03-2024.pdf16 Jun 2025
Company name should be as per registration certificateFile: Clarification ACC for Company Name.pdf29 May 2025
Acc : ITR ACK FY 23-24File: Acc ITR ACK 23-24.pdf29 May 2025
Acc; Acc IFC Report FY 23-24File: Acc IFC Report FY 23-24.pdf29 May 2025
Acc: Acc 3CB 3CD FY 23-24File: Acc 3CB 3CD FY 23-24.pdf29 May 2025
Acc: Acc Caro Report FY 23-24File: Acc Caro Report FY 23-24.pdf29 May 2025

How this compares with Bengaluru Urban

52%of this project is bookeddistrict median 51%
34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep TRIFECTA VANTO PHASE-2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

Builder: TRIFECTA PROJECTS PRIVATE LIMITED

TRIFECTA PROJECTS PRIVATE LIMITED has 6 registrations on RERA Karnataka, including Trifecta Veranza and TRIFECTA RETTO. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if TRIFECTA VANTO PHASE-2 is delayed beyond 31 Mar 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of TRIFECTA VANTO PHASE-2?

The registered promoter entity is TRIFECTA PROJECTS PRIVATE LIMITED, a company as per the filing. Its CIN U45200KA2012PTC062831 and GSTIN 29AACCE9717F1ZG can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in TRIFECTA VANTO PHASE-2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at TRIFECTA VANTO PHASE-2?

The professionals named in the filing: Architect: Revathi SR; Engineer: Ramesh B; Chartered Accountant: B Manohar Babu. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in TRIFECTA VANTO PHASE-2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About TRIFECTA VANTO PHASE-2. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save TRIFECTA VANTO PHASE-2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.