Home / Browse projects / Bengaluru Urban, Karnataka / TRIFECTA VANTO PHASE-1
TRIFECTA VANTO PHASE-1
By TRIFECTA PROJECTS PRIVATE LIMITED
RG-KA-88097 · RERA PRM/KA/RERA/1251/446/PR/190424/006813 · Last updated on RERA Karnataka portal: 15 Oct 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
TRIFECTA VANTO PHASE-1 is a Residential/Group Housing project by TRIFECTA PROJECTS PRIVATE LIMITED in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/190424/006813 on 19 Apr 2024. Possession is promised by 31 Aug 2027. 463 of the 825 units on this registration are recorded sold or booked, and 7 of 18 construction stages are filed complete.
At a glance
Project
- NameTRIFECTA VANTO PHASE-1
- TypeResidential/Group Housing
- Location
- Bengaluru East
- Bengaluru Urban
- 560035
- Pincode560035
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/446/PR/190424/006813
- ReraGenie IDRG-KA-88097
Builder
- NameTRIFECTA PROJECTS PRIVATE LIMITED
- Entity typeCompany
- CINU45200KA2012PTC062831
- GSTIN29AACCE9717F1ZG
- Authorized SignatoryRamireddy Venka Subba Reddy
- Managing DirectorRamireddy Venka Subba Reddy
- DirectorsRamireddy Venkata Subba Reddy, RAMIREDDY SARADA REDDY, GEDI SYLENDRAKUMAR REDDY
- Project HeadRAMIREDDY VENKATA SUBBAR EDDY
- Other registrations5 more →
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on19 Apr 2024
- Promised completion31 Aug 2027
- Revised completionNone
- Buildings2 building records
- Documents filed268 files
Current status
Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A | - | - | - | 450 | 0 | 450 |
| B | - | - | - | 375 | 0 | 375 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
7 of 18 construction stages are filed complete. The stage furthest along is Plastering inside, at 95%.
Building: 86% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 100% |
| Foundation footing work | 100% |
| Upto Plinth Level | 100% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 100% |
| Retaining wall (All types) | 100% |
| RCC or MS Framed structure | 100% |
| Masonry Construction | 100% |
| Plastering inside , outside & Ceiling | 95% |
| Joinery: Doors, Windows, Ventilators etc | 85% |
| Basic work of Water supply, Sanitary and Electrification | 80% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 70% |
| Railing and Grill fixing | 70% |
| Electrification, Water supply and Sanitary Finishing | 80% |
| Painting | 80% |
| Fire prevention and fire fighting fitting and fixture with network | 80% |
| Weather Proof work(tile,concrete) | 75% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | 70% |
| Internal and External work including landscapes as per sanctioned drawings | 70% |
Progress on shared amenities40
As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 80% |
| Sewage and Drainage System | Yes | 80% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 80% |
| Energy management | Yes | 80% |
| Fire protection and fire safety requirements | Yes | 80% |
| Solid waste management and disposal | Yes | 80% |
| Emergency Evacuation services | Yes | 80% |
| Internal Roads & Footpaths | Yes | 80% |
| Electricity supply transformer and substation | Yes | 80% |
| Storm water drains | Yes | 80% |
| Use of renewable energy | Yes | 80% |
| Sewage Treatment Plant (STP) | Yes | 80% |
| Parks & Tree planting | Yes | 80% |
| Street Lighting | Yes | 80% |
| Electricity | Yes | 80% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | 80% |
| Club House | Yes | 100% |
| Community Hall | Yes | 80% |
| Outdoor Sports facility | Yes | 80% |
| Indoor Sports facility | Yes | 80% |
| Swimming Pool | Yes | 80% |
| Gym | Yes | 80% |
| Parks | Yes | 80% |
| Power Backup | Yes | 80% |
| Piped Gas | No | Not applicable |
| Water and Sanitation | Yes | 80% |
| Air Conditioning | Yes | 80% |
| Staircases | Yes | 100% |
| Lifts | Yes | 90% |
| Corridor/Lobbies | Yes | 100% |
| Fire escapes | Yes | 80% |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | 100% |
| Basement | Yes | 100% |
| Terrace | Yes | 100% |
| Outer Wall | Yes | 100% |
| Open parking areas | Yes | 100% |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | No | Not applicable |
| Common storage spaces | No | Not applicable |
Land and ownership26
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| N. NIRMALA | - | - |
| K.H. RAMANJANEYA REDDY | - | - |
| ASHWANTHA NARAYANA REDDY | - | - |
| K. SHIVSARAMAREDDY | - | - |
| SAVITHA .N | - | - |
| K.H. SARASWATHAMMA | - | - |
| K.H. SARASWATHAMMA | - | - |
| K.H. PARVATHAMMA | - | - |
| N. ASHOK KUMAR | - | - |
| K.H. PARVATHAMMA | - | - |
| Srinivasareddy | - | - |
| Kamalamma | - | - |
| Savithramma | - | - |
| Sarojamma | - | - |
| Sushilamma | - | - |
| Kamalamma | - | - |
| Tanish Kumar | - | - |
| Trifecta Projects Private Limited Represented by Ramireddy Venkata Subba Reddy | - | - |
| Divya Ravanam | - | - |
| Rajasekhar Ravanam | - | - |
| Ashlesh Ravanam | - | - |
| Deekhsa Ravanam | - | - |
| Divya Ravanam | - | - |
| R. RAMAKRISHNA | - | - |
| K.AHALYA DEVI | - | - |
| R. Kishor Kumar | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 347.00 cr | Rs 181.79 cr |
| On-site expenditure-Consultants Fees | Rs 33.14 cr | Rs 22.48 cr |
| Principal sum and interest payable to financial institutions-Scheduled Banks | Rs 19.70 cr | Rs 19.00 cr |
| On-site expenditure-Salaries of workers | Rs 7.37 cr | Rs 6.25 cr |
| On-site expenditure-Cost Of Services(Water, Electricity, Sewage) | Rs 7.37 cr | Rs 6.25 cr |
| On-site expenditure-Site Overhead | Rs 7.37 cr | Rs 6.25 cr |
| Payment of taxes | - | Rs 27.09 cr |
| Principal sum and interest payable to financial institutions-Non Banking financial institution (NBFC) | - | Rs 1.94 cr |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Revathi SR |
| Engineer | Ramesh B |
| Chartered Accountant | B Manohar Babu |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed268
As listed on the registration, under the names the promoter filed them with; the newest 80 of 268 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/190424/006813 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: FORM 4 - Vanto Phase I.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Form-5, Architect VANTO-1 30092026.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: FORM 6 ENGINEER CERTIFICATE VANTO-1 30092026.pdf | 15 Oct 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: RERA Q1 - Vanto Phase I_compressed.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Form-5, Architect VANTO-1 30062026.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: FORM 6 ENGINEER CERTIFICATE VANTO-1 30062026.pdf | 15 Jul 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: FORM 4 CA CERTIFICATE Q4.pdf | 15 Apr 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Form-5, Architect VANTO-1 31032026.pdf | 15 Apr 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: FORM 6 ENGINEER CERTIFICATE VANTO-1 31032026.pdf | 15 Apr 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4 Vanto Phase I_compressed.pdf | 13 Jan 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Form-5, Architect VANTO 31122025.pdf | 13 Jan 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: FORM 6 ENGINEER CERTIFICATE VANTO 31122025.pdf | 13 Jan 2026 |
| Upload Single plot layout/DP orderFile: DLP39 sy no 37-2,3,4,,,,,kodathi village Work Order.pdf | 17 Apr 2024 |
| NOC AAIFile: NOC AAI.pdf | 17 Apr 2024 |
| Clarification for NOC issued by the concerned HAL/ Aiport authorityFile: Clarification for HAL NOC.pdf | 17 Apr 2024 |
| Title / Sale deed in favour of Land owner for all projects Sy nosFile: 37-2,4,5,6,7,8,9,10,11,12,19,20 COURT PARTISHAN DOCMENT.pdf | 4 Apr 2024 |
| Title / Sale deed in favour of Land owner for all projects Sy nosFile: 37-2,12 GWORAMMA.pdf | 4 Apr 2024 |
| Title / Sale deed in favour of Land owner for all projects Sy nosFile: 37-2,AND 7,8 MOTHAR DOCMENT PANCHYATH PORTISHAN DEED.pdf | 4 Apr 2024 |
| Title / Sale deed in favour of Land owner for all projects Sy nosFile: 37-3 ,13,14,15,16,17 PORTISHANDEED.pdf | 4 Apr 2024 |
| Title / Sale deed in favour of Land owner for all projects Sy nosFile: 37-3 MOTHAR DOCMENT.pdf | 4 Apr 2024 |
| Title / Sale deed in favour of Land owner for all projects Sy nosFile: 37-3 OLD RTC.pdf | 4 Apr 2024 |
| Title / Sale deed in favour of Land owner for all projects Sy nosFile: 37-4,11 BHAGYAMMA.pdf | 4 Apr 2024 |
| Title / Sale deed in favour of Land owner for all projects Sy nosFile: 37-5,10 PARVATHAMMA.pdf | 4 Apr 2024 |
| Title / Sale deed in favour of Land owner for all projects Sy nosFile: 37-6,9 SARASWATHAMMA.pdf | 4 Apr 2024 |
| Title / Sale deed in favour of Land owner for all projects Sy nosFile: 37-8 TO 37-19 GIFT DEED.pdf | 4 Apr 2024 |
| Title / Sale deed in favour of Land owner for all projects Sy nosFile: 37-18 GIFTDEED.pdf | 4 Apr 2024 |
| Title / Sale deed in favour of Land owner for all projects Sy nosFile: 37-19 TO 20 SALEDEED TRIFECTA.pdf | 4 Apr 2024 |
| Title / Sale deed in favour of Land owner for all projects Sy nosFile: 43-4B FULL LAND SALEDEED.pdf | 4 Apr 2024 |
| Title / Sale deed in favour of Land owner for all projects Sy nosFile: SY NO 43-4B GIFTDEED.pdf | 4 Apr 2024 |
| Hissa Phody copy and Hissa Phody Mutation copy for all project Sy nos in the name of Land ownersFile: HISSA TIPPANI PHODY.pdf | 4 Apr 2024 |
| BBMP khata for all project Sy nos in the name of company TRIFECTA PROJECTS PRIVATE LIMITEDFile: Khata.pdf | 4 Apr 2024 |
| EC from 10.01.2023 to till date for Sy no. 37/2 Ext: 0-03 guntas, Sy no. 37/8 Ext: 0-39 guntasFile: EC for Sy no 37(2) from 01-01-2004 to 20-03-2024.pdf | 4 Apr 2024 |
| EC from 10.01.2023 to till date for Sy no. 37/2 Ext: 0-03 guntas, Sy no. 37/8 Ext: 0-39 guntasFile: EC for Sy no 37(8) from 01-01-2004 to 20-03-2024 extent 13 guntas.pdf | 4 Apr 2024 |
| EC from 01.01.2007 to till date for all project Sy nos (Except Sy no. 37/2 and Sy no. 37/8)File: EC for Sy no 37(5) from 01-01-2004 to 20-03-2024.pdf | 4 Apr 2024 |
| EC from 01.01.2007 to till date for all project Sy nos (Except Sy no. 37/2 and Sy no. 37/8)File: EC for Sy no 37(4) from 01-01-2004 to 20-03-2024.pdf | 4 Apr 2024 |
| EC from 01.01.2007 to till date for all project Sy nos (Except Sy no. 37/2 and Sy no. 37/8)File: EC for Sy no 37(6) from 01-01-2004 to 20-03-2024.pdf | 4 Apr 2024 |
| EC from 01.01.2007 to till date for all project Sy nos (Except Sy no. 37/2 and Sy no. 37/8)File: EC for Sy no 37(7) from 01-01-2004 to 20-03-2024.pdf | 4 Apr 2024 |
| EC from 01.01.2007 to till date for all project Sy nos (Except Sy no. 37/2 and Sy no. 37/8)File: EC for Sy no 37(8) from 01-01-2004 to 20-03-2024 extent 39 guntas.pdf | 4 Apr 2024 |
| EC from 01.01.2007 to till date for all project Sy nos (Except Sy no. 37/2 and Sy no. 37/8)File: EC for Sy no 37(9) from 01-01-2004 to 20-03-2024.pdf | 4 Apr 2024 |
| EC from 01.01.2007 to till date for all project Sy nos (Except Sy no. 37/2 and Sy no. 37/8)File: EC for Sy no 37(10) from 01-01-2004 to 20-03-2024.pdf | 4 Apr 2024 |
| EC from 01.01.2007 to till date for all project Sy nos (Except Sy no. 37/2 and Sy no. 37/8)File: EC for Sy no 37(11) from 01-01-2004 to 20-03-2024.pdf | 4 Apr 2024 |
| EC from 01.01.2007 to till date for all project Sy nos (Except Sy no. 37/2 and Sy no. 37/8)File: EC for Sy no 37(12) from 01-01-2004 to 20-03-2024.pdf | 4 Apr 2024 |
| EC from 01.01.2007 to till date for all project Sy nos (Except Sy no. 37/2 and Sy no. 37/8)File: EC for Sy no 43(4B) from 01-04-2004 to 20-03-2024.pdf | 4 Apr 2024 |
| relevant documents separately for Sy no.37/19 and 37/20File: 37-19 and 37-20.pdf | 4 Apr 2024 |
| relevant documents separately for Sy no.37/19 and 37/20File: SyNo 37-19 and 37-20.pdf | 4 Apr 2024 |
| Notarized Non litigation AffidavitFile: Non litigation Affidavit.pdf | 4 Apr 2024 |
| Notarized Form-BFile: Form - B.pdf | 4 Apr 2024 |
| Advocate Search reportFile: Advocate Search Report_compressed.pdf | 4 Apr 2024 |
| Guidance Value certificate issued by the Sub Register for all project Sy nosFile: Sub register guidance value certificate.pdf | 4 Apr 2024 |
| FAR As per the sanction planFile: Clarification for FAR.pdf | 4 Apr 2024 |
| Single plot layoutFile: SINGEL SITE PLAN.pdf | 4 Apr 2024 |
| Single plot layout orderFile: SINGIL PLOT ORDER.pdf | 4 Apr 2024 |
| certified carpet area calculationFile: Certified Carpet Area.pdf | 4 Apr 2024 |
| CDP map showing the proposed siteFile: CDP map showing the proposed site.pdf | 4 Apr 2024 |
| village map showing the proposed siteFile: Village map kodthi.pdf | 4 Apr 2024 |
| village map showing the proposed siteFile: Village Map kodti.pdf | 4 Apr 2024 |
| commencement certificateFile: Clarification for commencement certificate.pdf | 4 Apr 2024 |
| Clarification for Areanumber of units of Upload KSPCB CFEFile: Clarification for Areanumber of units of Upload KSPCB CFE.pdf | 4 Apr 2024 |
| Clarification for Area/number of units of Upload SEIAAFile: Clarification for Areanumber of units of Upload SEIAA.pdf | 4 Apr 2024 |
| clear legible sanctioned drawings floor plan, sectional drawings and elevationsFile: Plan 3 to 18 & 20 to 24 Typical Floor.pdf | 4 Apr 2024 |
| clear legible sanctioned drawings floor plan, sectional drawings and elevationsFile: plan Club House Section, Elevation and Site.pdf | 4 Apr 2024 |
| clear legible sanctioned drawings floor plan, sectional drawings and elevationsFile: Single Site Plan.pdf | 4 Apr 2024 |
| self-attested dated copy of the Engineer license certificate issued by the local Development AuthoriFile: Self attested copy of the Engineer license certificate.pdf | 4 Apr 2024 |
| Engineer certificate in the prescribed formatFile: Form3 trifecta Vanto phase.pdf | 4 Apr 2024 |
| estimated cost of construction certified by the registered Civil EngineerFile: Brief Estimated Cost of Construction.pdf | 4 Apr 2024 |
| proforma of the Allotment letterFile: Proforma of Allotment Letter.pdf | 4 Apr 2024 |
| project specification by incorporating the project Name and Project Address certified by the EngineeFile: Project Specifications.pdf | 4 Apr 2024 |
| STP design drawing certified by the EngineerFile: STP PLAN & SECTIONS-Layout.pdf | 4 Apr 2024 |
| Certificate from the Registered Engineer indicating the structural safety adopted for the proposed bFile: Structural Safety Certificate.pdf | 4 Apr 2024 |
| project name and project address and upload the project section 3(1) notarized affidavitFile: Affidavit.pdf | 4 Apr 2024 |
| Land cost calculation sheet as per the guidance value(Self-attested copy)File: Land cost calculation sheet as per the guidance value.pdf | 4 Apr 2024 |
| karnataka ground water authority regarding bore wellFile: Clarification for permission letter issued by Karnataka Ground Water Authority.pdf | 4 Apr 2024 |
| permission letter issued by the concerned HAL and Aiport authorityFile: Clarification for permission letter issued by the concerned HAL and Aiport authority.pdf | 4 Apr 2024 |
| Clarification for Height of the buildingFile: Clarification for Height of the Building.pdf | 4 Apr 2024 |
| Clarification for Height of the building - Sanction Plan Height highlightedFile: Approved Plan.pdf | 4 Apr 2024 |
| Clarification for ongoing projectFile: Clarification for Ongoing Project.pdf | 4 Apr 2024 |
| Agreement for SaleFile: Proforma Agreement for sale.pdf | 4 Apr 2024 |
| Notarized Joint Affidavit Cum DeclarationFile: Notarized Joint Affidavit Cum Declaration.pdf | 4 Apr 2024 |
| RTC, survey 37/2 | - |
| Mutation, survey 37/2 | - |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep TRIFECTA VANTO PHASE-1 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 30 registered projects within 2 km.
BIRLA EVARA
VARDHITA PROPERTIES PRIVATE LIMITED
DSR HIGHLAND GREENZ
DSR INFRA PROJECTS
GODREJ LAKESIDE ORCHARD
Godrej Properties Limited
Adarsh Tropica (Phase-2)
ORCHIDS APARTMENTS PVT LTD
East Park Residences
Ramsons Trendsquares Realty LLP
ADARSH LUMINA
SHIVAKAR DEVELOPERS PRIVATE LIMITED
See every Bengaluru Urban project, with the district possession charts
Builder: TRIFECTA PROJECTS PRIVATE LIMITED
TRIFECTA PROJECTS PRIVATE LIMITED has 6 registrations on RERA Karnataka, including Trifecta Veranza and TRIFECTA RETTO. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if TRIFECTA VANTO PHASE-1 is delayed beyond 31 Aug 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of TRIFECTA VANTO PHASE-1?
The registered promoter entity is TRIFECTA PROJECTS PRIVATE LIMITED, a company as per the filing. Its CIN U45200KA2012PTC062831 and GSTIN 29AACCE9717F1ZG can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in TRIFECTA VANTO PHASE-1?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at TRIFECTA VANTO PHASE-1?
The professionals named in the filing: Architect: Revathi SR; Engineer: Ramesh B; Chartered Accountant: B Manohar Babu. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in TRIFECTA VANTO PHASE-1?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback