Registration approved No litigation declared Residential/Group Housing project

DSR HIGHLAND GREENZ

By DSR INFRA PROJECTS

RG-KA-30400 · RERA PRM/KA/RERA/1251/446/PR/110522/004876 · Last updated on RERA Karnataka portal: 31 Mar 2026

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Mar 2026Possession promisedno revision filed
18 of 18Construction stages doneevery applicable stage filed complete
297 of 900Units unsoldnot recorded sold or booked
0Complaints at RERA Karnatakaon this registration
Jump to the 200 documents Report an error

DSR HIGHLAND GREENZ is a Residential/Group Housing project by DSR INFRA PROJECTS in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/110522/004876 on 11 May 2022. Possession is promised by 30 Mar 2026. 603 of the 900 units on this registration are recorded sold or booked, and 18 of 18 construction stages are filed complete.

At a glance

Project

  • NameDSR HIGHLAND GREENZ
  • TypeResidential/Group Housing
  • Location
    • Bengaluru East
    • Bengaluru Urban
    • 560035
  • Pincode560035
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/446/PR/110522/004876
  • ReraGenie IDRG-KA-30400

Builder

  • NameDSR INFRA PROJECTS
  • Entity typePartnership Firm
  • GSTIN29AAPFD6671B1Z7
  • Authorized SignatoryK S SATYANARAYANA REDDY
  • Other registrations2 more →
  • Declared earlier projects3 →

Key dates

this monthRegisteredMay 2022PromisedMar 2026

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on11 May 2022
  • Promised completion30 Mar 2026
  • Revised completionNone
  • Buildings4 building records
  • Documents filed200 files

Current status

67%603 of 900 units booked
111.5%Of the estimated cost spent so far

Figures as on 31 Mar 2026, this project's latest RERA Karnataka filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TOWER 1---1920192
Tower 2---2400240
Tower 3---3360336
Tower 4---1320132

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 31 Mar 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

18 of 18 construction stages are filed complete.

Building: 100% average across the applicable activities

ActivityProgress
Earth work and other leveling preparation work100%
Foundation footing work100%
Upto Plinth Level100%
Sub-structure flooring (Parking Floor, more than one floor below general ground level)100%
Retaining wall (All types)100%
RCC or MS Framed structure100%
Masonry Construction100%
Plastering inside , outside & Ceiling100%
Joinery: Doors, Windows, Ventilators etc100%
Basic work of Water supply, Sanitary and Electrification100%
Dadoing, Skirting, Flooring, Tiles work (All types)100%
Railing and Grill fixing100%
Electrification, Water supply and Sanitary Finishing100%
Painting100%
Fire prevention and fire fighting fitting and fixture with network100%
Weather Proof work(tile,concrete)100%
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work100%
Internal and External work including landscapes as per sanctioned drawings100%

Progress on shared amenities31

As on 31 Mar 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes100%
Sewage and Drainage SystemYes100%
Water conservation/rain water harvesting/recharge of ground waterYes100%
Energy managementYes100%
Fire protection and fire safety requirementsYes100%
Solid waste management and disposalYes100%
Emergency Evacuation servicesYes100%
Internal Roads & FootpathsYes100%
Electricity supply transformer and substationYes100%
Storm water drainsYes100%
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)Yes100%
Parks & Tree plantingYes100%
Street LightingYes100%
ElectricityYes100%
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes100%
Club HouseYes100%
Community HallNoNot applicable
Outdoor Sports facilityYes100%
Indoor Sports facilityYes100%
Swimming PoolYes100%
GymYes100%
ParksYes100%
Power BackupYes100%
Piped GasNoNot applicable
Water and SanitationNoNot applicable
Air ConditioningNoNot applicable
StaircasesYes100%
LiftsYes100%
Corridor/LobbiesYes100%

Land and ownership8

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area40,873 sq m
Named landowners8
LandownerVillageDistrict
DSR INFRASTRUCTURE PVT LTD REP BY K S SATYANARAYANA REDDY--
DSR INFRASTRUCTURE PVT LTD REP BY K S SATYANARAYANA REDDY--
DSR INFRASTRUCTURE PVT LTD REP BY K S SATYANARAYANA REDDY--
MANDADI ROHAN--
SAKAMMA M--
ASWTHA NARAYANA SWAMY--
VENKATASWAMY REDDY CR--
DSR INFRAPROJECTS--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 290.16 cr
Cost incurredRs 323.38 cr
Spent of the estimate111.45%
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 231.11 crRs 264.33 cr
On-site expenditure-Site OverheadRs 55.80 crRs 55.80 cr
On-site expenditure-Consultants FeesRs 2.72 crRs 2.72 cr
On-site expenditure-Salaries of workersRs 52.50 lakhRs 52.50 lakh

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectGENESIS PLANNERS PVT LTD REP BY AKTHAR IMAM
EngineerZAKI ASSOCIATES REP BY ZAKI AHMED
Chartered AccountantKBSASSOCIATES REP BY BALASUBRAMANIAM G

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed200

As listed on the registration, under the names the promoter filed them with; the newest 80 of 200 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/110522/004876 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: HIGHLAND GREENZ RERA CA CER.pdf31 Mar 2026
Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Architect Certificate HG RERa.pdf31 Mar 2026
Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: HIGHLAND GREENZ Q3 ENGG CERTIFICATE.pdf31 Mar 2026
Q3 2025-26 Water supply and sewage board31 Mar 2026
Q3 2025-26 KSPCB- PCB (10 Acres to 125 Acres)31 Mar 2026
Q3 2025-26 KPTCL- BESCOM31 Mar 2026
Q3 2025-26 Fire and Safety31 Mar 2026
Q3 2025-26 Airport Authority of India31 Mar 2026
Q3 2025-26 BSNL/Telecommunication Department31 Mar 2026
AIRPORT NOCFile: AIA NOC FINAL.pdf6 May 2022
FIRE NOCFile: FIRE NOC FINAL.pdf6 May 2022
SALE AGREEMENT DRAFTFile: SALE AGREEMENT DRAFT FINAL.pdf6 May 2022
SY NO 14/4 Khatha ExplanationFile: SY NO 14 4 KHATHA EXTRACT EXPLANATION.pdf6 May 2022
DSR HIGHLAND GREENZ DEMARCATED LOCATIONFile: DSR HIGHLAND GREENZ DEMARCATED LOCATION.jpg6 May 2022
Extract of DEMARCATED Master PlanFile: CDP DEMARCATED PLAN FINAL.pdf6 May 2022
sanctioned Development Plan OrderFile: Licence to Construct_BDA.pdf6 May 2022
Highland greenz guideline value Certified by sub registrar banaswadiFile: Highland greenz guideline value Certified by sub registrar banaswadi.pdf6 May 2022
SITE PLANFile: SITE PLAN.pdf6 May 2022
GROUND FLOOR PLANFile: GROUND FLOOR PLAN.pdf6 May 2022
BASEMENT PLANFile: BASEMENT PLAN.pdf6 May 2022
TOWER A WING 1 1 TO 12 FLOOR PLAN , TERRACE FLOOR PLAN ELEVATION AND SECTION PLANFile: TOWER A WING 1 1 TO 12 FLOOR PLAN , TERRACE FLOOR PLAN ELEVATION AND SECTION PLAN.pdf6 May 2022
TOWER A WING 2 1 TO 12 FLOOR PLAN , TERRACE FLOOR PLAN ELEVATION AND SECTION PLANFile: TOWER A WING 2 1 TO 12 FLOOR PLAN , TERRACE FLOOR PLAN ELEVATION AND SECTION PLAN.pdf6 May 2022
TOWER B WING 1 1 TO 12 FLOOR PLAN , TERRACE FLOOR PLAN ELEVATION AND SECTION PLANFile: TOWER B WING 1 1 TO 12 FLOOR PLAN , TERRACE FLOOR PLAN ELEVATION AND SECTION PLAN.pdf6 May 2022
TOWER B WING 2 1 TO 12 FLOOR PLAN , ELEVATIONFile: TOWER B WING 2 1 TO 12 FLOOR PLAN , ELEVATION.pdf6 May 2022
TOWER B WING 2 TERRACE FLOOR PLAN SECTIONFile: TOWER B WING 2 TERRACE FLOOR PLAN SECTION.pdf6 May 2022
TOWER C WING 1 1 TO 12 FLOOR PLAN , TERRACE FLOOR PLAN ELEVATION AND SECTION PLANFile: TOWER C WING 1 1 TO 12 FLOOR PLAN , TERRACE FLOOR PLAN ELEVATION AND SECTION PLAN.pdf6 May 2022
TOWER C WING 2 1 TO 12 FLOOR PLAN , TERRACE FLOOR PLAN ELEVATION AND SECTION PLANFile: TOWER C WING 2 1 TO 12 FLOOR PLAN , TERRACE FLOOR PLAN ELEVATION AND SECTION PLAN.pdf6 May 2022
TOWER C WING 3 , TERRACE FLOOR PLAN AND SECTION PLANFile: TOWER C WING 3 , TERRACE FLOOR PLAN AND SECTION PLAN.pdf6 May 2022
TOWER C WING 3 1 TO 12 FLOOR PLAN , ELEVATIONFile: TOWER C WING 3 1 TO 12 FLOOR PLAN , ELEVATION.pdf6 May 2022
TOWER D 1 TO 11 FLOOR PLAN , TERRACE FLOOR PLAN ELEVATION AND SECTION PLANFile: TOWER D 1 TO 11 FLOOR PLAN , TERRACE FLOOR PLAN ELEVATION AND SECTION PLAN.pdf6 May 2022
CA CERTIFICATE FOR REVISED PROJECT COSTFile: Highland Greenz CA Certificates03052022.pdf6 May 2022
Balance Sheet 19 20 UDIN Explaining letterFile: Balance Sheet 19 20 UDIN Explaining letter.pdf23 Mar 2022
Balance Sheet 20 21 UDIN Explaining letterFile: Balance Sheet 20 21 UDIN Explaining letter.pdf23 Mar 2022
P AND L 19 20 UDIN Explaining letterFile: P AND L 19 20 UDIN Explaining letter.pdf23 Mar 2022
P AND L 20 21 UDIN Explaining letterFile: P AND L 20 21 UDIN Explaining letter.pdf23 Mar 2022
sale deed and title deed for survey nos 18/3,18/4, 18/5File: Partiton Deed final.pdf23 Mar 2022
EC SY NO 17File: ECS SY NO 17 ALL.pdf23 Mar 2022
EC 18/1File: EC 18 1.pdf23 Mar 2022
EC 18/2File: EC 18 2.pdf23 Mar 2022
EC 18/3File: EC 18 3.pdf23 Mar 2022
EC 18/4File: EC 18 4 - Copy.pdf23 Mar 2022
EC 18/5File: EC 18 5 - Copy.pdf23 Mar 2022
EC 14/4File: EC 14 4.pdf23 Mar 2022
Highland greenz guideline value Certified by sub registrar banaswadiFile: Highland greenz guideline value Certified by sub registrar banaswadi.pdf23 Mar 2022
FORM BFile: Form-B.pdf23 Mar 2022
SY NO 14/ 4 KHATHA NAME CONFIRMATION LETTERFile: 14 4 KHATHA CORRECTION LETTER AND KHATHA.pdf23 Mar 2022
BDA plan sanction orderFile: BDA plan sanction order.pdf23 Mar 2022
BDA SANCTIONED PLAN AND SECTIONAL DRAWINGSFile: DSR HIGHLAND GREENS PLAN NEW f.pdf23 Mar 2022
Relinquishment Deed Area difference ExplanationFile: Relinquishment Deed Area difference Explanation.pdf23 Mar 2022
KSPCB NOCFile: KSCPCB NOC.pdf23 Mar 2022
Change of Land explanationFile: Change of Land explanation.pdf23 Mar 2022
DSR HIGHLAND GREENZ DEMARCATED LOCATIONFile: DSR HIGHLAND GREENZ DEMARCATED LOCATION.jpg23 Mar 2022
DSR HIGHLAND GREENZ SPECIFICATIONSFile: DSR HIGHLAND GREENZ SPECIFICATIONS.pdf23 Mar 2022
FIRE NOCFile: Fire NOC.pdf23 Mar 2022
Notarized Panchayat water supply NocFile: Notarized Panchayat water supply Noc.pdf23 Mar 2022
Notarized Bescom NocFile: Notarized Bescom Noc.pdf23 Mar 2022
Airport Authority NOCFile: Airport Authority.pdf23 Mar 2022
STP DEMARCATION PLAN AND DESIGN DETAILSFile: STP DEMARCATION PLAN AND DESIGN DETAILS.pdf23 Mar 2022
RTC, survey 17-
Mutation, survey 17-
Encumbrance Certificate, survey 17-
Conversion/Alienation Order, survey 17-
Sale/Title/Gift Deed, survey 17-
JDA, survey 17-
Khatha, survey 17-
RTC, survey 18/1-
Mutation, survey 18/1-
Encumbrance Certificate, survey 18/1-
Conversion/Alienation Order, survey 18/1-
Sale/Title/Gift Deed, survey 18/1-
JDA, survey 18/1-
Khatha, survey 18/1-
RTC, survey 18/2-
Mutation, survey 18/2-
Encumbrance Certificate, survey 18/2-
Conversion/Alienation Order, survey 18/2-
Sale/Title/Gift Deed, survey 18/2-
JDA, survey 18/2-
Khatha, survey 18/2-
RTC, survey 18/3-

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 declared completed, no finish date filed
ProjectLocationStatusPromisedDelivered
DSR WHITEWATERS IIDSR WHITEWATERS II BBMP KHATHA NO 638 GUNJUR VILLAGE VARTHUR HOBLICompleted-No date filed
DSR WATERSCAPEDSR WATERSCAPE BBMP KHATHA NO 10 K CHANNASANDRA VILLAGE BENGALURUCompleted-No date filed

How this compares with Bengaluru Urban

67%of this project is bookeddistrict median 51%
34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep DSR HIGHLAND GREENZ on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmDSR HIGHLAND GREENZOther 61Dot size: filed unitsN

Filed coordinates, straight-line distance. 61 registered projects within 2 km.

Builder: DSR INFRA PROJECTS

DSR INFRA PROJECTS has 3 registrations on RERA Karnataka, including DSR HIGHLAND GREENZ and DSR VERTEX AND APEX. Its filings declare 3 earlier projects, 2 of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if DSR HIGHLAND GREENZ is delayed beyond 30 Mar 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of DSR HIGHLAND GREENZ?

The registered promoter entity is DSR INFRA PROJECTS, a partnership firm as per the filing. Its GSTIN 29AAPFD6671B1Z7 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in DSR HIGHLAND GREENZ?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at DSR HIGHLAND GREENZ?

The professionals named in the filing: Architect: GENESIS PLANNERS PVT LTD REP BY AKTHAR IMAM; Engineer: ZAKI ASSOCIATES REP BY ZAKI AHMED; Chartered Accountant: KBSASSOCIATES REP BY BALASUBRAMANIAM G. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in DSR HIGHLAND GREENZ?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About DSR HIGHLAND GREENZ. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save DSR HIGHLAND GREENZ to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.