GODREJ LAKESIDE ORCHARD
RG-KA-44073 · RERA PRM/KA/RERA/1251/446/PR/300924/007105 · Last updated on RERA Karnataka portal: 15 Oct 2026
Source: official RERA Karnataka filing
Red flags
- Litigation declared
- 2 complaints at RERA Karnataka
Clear
- Completion date never moved
- Separate project account declared
Saved.
GODREJ LAKESIDE ORCHARD is a Residential/Group Housing project by Godrej Properties Limited in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/300924/007105 on 30 Sep 2024. Possession is promised by 30 Sep 2030. 869 of the 698 units on this registration are recorded sold or booked, and 1 of 18 construction stages are filed complete. 2 complaints are on record with the regulator.
At a glance
Project
- NameGODREJ LAKESIDE ORCHARD
- TypeResidential/Group Housing
- Location
- Bengaluru East
- Bengaluru Urban
- 560035
- Pincode560035
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/446/PR/300924/007105
- ReraGenie IDRG-KA-44073
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on30 Sep 2024
- Promised completion30 Sep 2030
- Revised completionNone
- Buildings8 building records
- Documents filed302 files
Current status
Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Tower A | - | - | - | 123 | 0 | 123 |
| Tower B | - | - | - | 99 | 0 | 99 |
| Tower C | - | - | - | 95 | 0 | 95 |
| Tower D | - | - | - | 95 | 0 | 95 |
| Tower E | - | - | - | 188 | 0 | 188 |
| Tower F | - | - | - | 98 | 0 | 98 |
| Tower G | - | - | - | 150 | 0 | 150 |
| Tower H | - | - | - | 122 | 0 | 122 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
1 of 18 construction stages are filed complete. The stage furthest along is Earth work and other leveling preparation work, at 96%.
Building: 24% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 96% |
| Foundation footing work | 100% |
| Retaining wall (All types) | 70% |
| Plinth level Beam | 0% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 70% |
| RCC or MS Framed structure | 46% |
| Masonry construction: Bricks, Concrete blocks etc | 4% |
| Plastering inside , outside & Ceiling | 6% |
| Joinery: Doors, Windows, Ventilators etc | 1% |
| Basic work of Water supply, Sanitary and Electrification | 19% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 2% |
| Railing and Grill fixing | 10% |
| Electrification, Water supply and Sanitary Finishing | 1% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Fire prevention and fire fighting fitting and fixture with network | 8% |
| Weather Proof work(tile,concrete) | 0% |
| Painting | 1% |
| Elevation work | 0% |
| Internal and External work including landscapes as per santioned drawings | 0% |
Progress on shared amenities41
As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 0% |
| Internal Roads & Footpaths | No | Not applicable |
| Sewage and Drainage System | Yes | 0% |
| Parks & Tree planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Provision for community buildings and for treatment and disposal of sewage and sullage water | No | Not applicable |
| Solid waste management and disposal | Yes | 0% |
| Water conservation | Yes | 0% |
| Energy management | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Education/Health/Other public amenities | No | Not applicable |
| Electricity supply transformer and substation | Yes | 0% |
| Emergency Evacuation services | Yes | 0% |
| Storm water drains | Yes | 0% |
| Use of renewable energy | Yes | 0% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 0% |
| Electricity | Yes | 0% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | 0% |
| Club House | Yes | 50% |
| Community Hall | Yes | 0% |
| Outdoor Sports facility | Yes | 0% |
| Indoor Sports facility | Yes | 0% |
| Swimming Pool | Yes | 0% |
| Gym | Yes | 0% |
| Parks | Yes | 0% |
| Power Backup | Yes | 0% |
| Gas | No | Not applicable |
| Water and Sanitation | Yes | 0% |
| Air Conditioning And incerntion | No | Not applicable |
| Staircases | Yes | 23% |
| Lifts | Yes | 0% |
| Staircases and Lift lobbies, corridor,lobbies, corridor | Yes | 0% |
| Fire escapes | Yes | 0% |
| Common entrance and exit for the building / common portico/foyer/verandah | Yes | 0% |
| Basement | Yes | 0% |
| Terrace | Yes | 0% |
| Outer Wall | Yes | 0% |
| Open parking areas and common storage spaces | Yes | 0% |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | Yes | 0% |
Land and ownership8
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Godrej Properties Limited | - | - |
| Godrej Properties Limited | - | - |
| Godrej Properties Limited | - | - |
| Godrej Properties Limited | - | - |
| Godrej Properties Limited | - | - |
| Godrej Properties Limited | - | - |
| Godrej Properties Limited | - | - |
| Godrej Properties Limited | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 961.80 cr | Rs 184.01 cr |
| On-site expenditure-Salaries of workers | - | Rs 59.84 cr |
| Principal sum and interest payable to financial institutions-Non Banking financial institution (NBFC) | - | Rs 29.43 cr |
Certifying professionals and partners4
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | NIMITA MAISNAM |
| Engineer | Madhura Manjrekar |
| Engineer | Akash Shahaji Dalvi |
| Chartered Accountant | BHAVESH D SHAH |
Litigation declaredYes
The promoter declares litigation on this registration. The case records are in the filed documents.
Complaints filed with RERA Karnataka2
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| 00056/2025 | - | Godrej Properties Limited | 07/01/2025 |
| 00810/2025 | - | Godrej Properties Limited | 10/06/2025 |
Documents filed302
As listed on the registration, under the names the promoter filed them with; the newest 80 of 302 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/300924/007105 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form 4 GODREJ LAKESIDE ORCHARD-CA Cert.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Form-5 TEMPLATE - GLO - 07-Oct-26.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: RERA Form -6 Engineer I Godrej Lakeside Orchards - 30th Sep26.pdf | 15 Oct 2026 |
| Q2 2026-27 Water supply and sewage board | 15 Oct 2026 |
| Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 15 Oct 2026 |
| Q2 2026-27 KSPCB- MOEF (Above 50 Acres) | 15 Oct 2026 |
| Q2 2026-27 KPTCL- BESCOM | 15 Oct 2026 |
| Q2 2026-27 Fire and Safety | 15 Oct 2026 |
| Q2 2026-27 Airport Authority of India | 15 Oct 2026 |
| Q2 2026-27 BSNL/Telecommunication Department | 15 Oct 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form 4 CA GODREJ LAKESIDE ORCHARD.pdf | 13 Jul 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Form-5 TEMPLATE -GLO_2026-6-30.pdf | 13 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form -6 Engineer I Godrej Lakeside Orchards - 30th June'26.pdf | 13 Jul 2026 |
| Q1 2026-27 Water supply and sewage board | 13 Jul 2026 |
| Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 13 Jul 2026 |
| Q1 2026-27 KSPCB- MOEF (Above 50 Acres) | 13 Jul 2026 |
| Q1 2026-27 KPTCL- BESCOM | 13 Jul 2026 |
| Q1 2026-27 Fire and Safety | 13 Jul 2026 |
| Q1 2026-27 Airport Authority of India | 13 Jul 2026 |
| Q1 2026-27 BSNL/Telecommunication Department | 13 Jul 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4 GLO-CA Certificate.pdf | 13 Apr 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Form -6 Engineer I Godrej Lakeside Orchards - 31st Mar'26.pdf | 13 Apr 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form-5 TEMPLATE -GLO_2026-3-31.pdf | 13 Apr 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4 GODREJ LAKESIDE ORCHARD - Dec 25.pdf | 12 Jan 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Form 5 GODREJ LAKESIDE ORCHARD - Dec 25.pdf | 12 Jan 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form 6 GODREJ LAKESIDE ORCHARD - Dec 25.pdf | 12 Jan 2026 |
| Proforma AFSFile: 1 Proforma AFS.pdf | 22 Mar 2025 |
| Godrej Lakeside Orchard BrochureFile: 2 Godrej Lakeside Orchard Brochure.pdf | 22 Mar 2025 |
| HAL NOCFile: 3 HAL NOC.pdf | 22 Mar 2025 |
| Form-6 Engineer CertificateFile: 1 Form-6 Engineer Certificate.pdf | 19 Mar 2025 |
| Sold and Unsold Unit DetailsFile: 2 Sold and Unsold Unit Details.pdf | 19 Mar 2025 |
| Modified Building LicenseFile: 3 Modified Building License.pdf | 19 Mar 2025 |
| Modified Demarcation of DPFile: 4 Modified Demarcation of DP.pdf | 19 Mar 2025 |
| Approved Plan Page 31 - Section-01File: 5 Approved Plan Page 31 - Section-01.pdf | 19 Mar 2025 |
| Approved Plan Page 32 - Section-02File: 6 Approved Plan Page 32 - Section-02.pdf | 19 Mar 2025 |
| Approved Plan Page 33 - ElevationFile: 7 Approved Plan Page 33 - Elevation.pdf | 19 Mar 2025 |
| RRT-CR-534File: 1 RRT-CR-534.pdf | 30 Sep 2024 |
| Conversion Sketch-79-2 New Sy No 79-1C2File: 2 Conversion Sketch-79-2 New Sy No 79-1C2.pdf | 30 Sep 2024 |
| MR copies and Sy sketchesFile: 3 MR copies and Sy sketches.pdf | 30 Sep 2024 |
| CONVERSION-79-2 New 79-1C2File: 4 CONVERSION-79-2 New 79-1C2.pdf | 30 Sep 2024 |
| OS 506 DetailsFile: OS 506 Details.pdf | 30 Sep 2024 |
| AffidavitFile: Affidavit.pdf | 30 Sep 2024 |
| HAL NOC AffidavitFile: HAL NOC Affidavit.pdf | 30 Sep 2024 |
| Building Plan 1 OF 27File: Building Plan 1 OF 27.pdf | 30 Sep 2024 |
| Building Plan 2 OF 27File: Building Plan 2 OF 27.pdf | 30 Sep 2024 |
| Building Plan 3 OF 27File: Building Plan 3 OF 27.pdf | 30 Sep 2024 |
| Building Plan 4 OF 27File: Building Plan 4 OF 27.pdf | 30 Sep 2024 |
| Building Plan 5 OF 27File: Building Plan 5 OF 27.pdf | 30 Sep 2024 |
| Building Plan 6 OF 27File: Building Plan 6 OF 27.pdf | 30 Sep 2024 |
| Building Plan 7 OF 27File: Building Plan 7 OF 27.pdf | 30 Sep 2024 |
| Building Plan 8 OF 27File: Building Plan 8 OF 27.pdf | 30 Sep 2024 |
| Building Plan 9 OF 27File: Building Plan 9 OF 27.pdf | 30 Sep 2024 |
| Building Plan 10 OF 27File: Building Plan 10 OF 27.pdf | 30 Sep 2024 |
| Building Plan 11 OF 27File: Building Plan 11 OF 27.pdf | 30 Sep 2024 |
| Building Plan 12 OF 27File: Building Plan 12 OF 27.pdf | 30 Sep 2024 |
| Building Plan 13 OF 27File: Building Plan 13 OF 27.pdf | 30 Sep 2024 |
| Building Plan 14 OF 27File: Building Plan 14 OF 27.pdf | 30 Sep 2024 |
| Building Plan 15 OF 27File: Building Plan 15 OF 27.pdf | 30 Sep 2024 |
| Building Plan 16 OF 27File: Building Plan 16 OF 27.pdf | 30 Sep 2024 |
| Building Plan 17 OF 27File: Building Plan 17 OF 27.pdf | 30 Sep 2024 |
| Building Plan 18 OF 27File: Building Plan 18 OF 27.pdf | 30 Sep 2024 |
| Building Plan 19 OF 27File: Building Plan 19 OF 27.pdf | 30 Sep 2024 |
| Building Plan 20 OF 27File: Building Plan 20 OF 27.pdf | 30 Sep 2024 |
| Building Plan 21 OF 27File: Building Plan 21 OF 27.pdf | 30 Sep 2024 |
| Building Plan 22 OF 27File: Building Plan 22 OF 27.pdf | 30 Sep 2024 |
| Building Plan 23 OF 27File: Building Plan 23 OF 27.pdf | 30 Sep 2024 |
| Building Plan 24 OF 27File: Building Plan 24 OF 27.pdf | 30 Sep 2024 |
| Building Plan 25 OF 27File: Building Plan 25 OF 27.pdf | 30 Sep 2024 |
| Building Plan 26 OF 27File: Building Plan 26 OF 27.pdf | 30 Sep 2024 |
| Building Plan 27 OF 27File: Building Plan 27 OF 27.pdf | 30 Sep 2024 |
| RTC, survey 73(p) | - |
| Mutation, survey 73(p) | - |
| Encumbrance Certificate, survey 73(p) | - |
| Conversion/Alienation Order, survey 73(p) | - |
| Sale/Title/Gift Deed, survey 73(p) | - |
| Khatha, survey 73(p) | - |
| RTC, survey 78/1A | - |
| Mutation, survey 78/1A | - |
| Encumbrance Certificate, survey 78/1A | - |
| Conversion/Alienation Order, survey 78/1A | - |
Promoter's earlier projects4
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Status | Promised | Delivered |
|---|---|---|---|---|
| Godrej Woodscapes | Sy.No 3 and 4 Konadasapura Village , , Bidarahalli Hobli, Bangalore East Taluk , Near Budigere cross , old Madras Road , Bengaluru East , Bengaluru Urban, Karnataka - 560049 | Ongoing | Jan 2028 | Not due yet |
| Godrej Splendour Phase II | 46/1, 46/2, 46/3, 46/4, 46/5, 46/6, 47, 49/3, 57(P), 61/2 OF DOMMASANDRA VILLAGESY NO.107/1, 107/2 OF KUMBENA AGRAHARA VILLAGE,BIDARAHALLI HOBLI,, BENGALURU EAST, BENGALURU URBAN | Ongoing | Jan 2028 | Not due yet |
| Godrej Splendour | 46/1, 46/2, 46/3, 46/4, 46/5, 46/6, 47, 49/3, 57(P), 61/2 OF DOMMASANDRA VILLAGESY NO.107/1, 107/2 OF KUMBENA AGRAHARA VILLAGE,BIDARAHALLI HOBLI,, BENGALURU EAST, BENGALURU URBAN | Ongoing | Mar 2027 | Not due yet |
| Godrej Park Retreat Ph1 and Ph2 | GODREJ PARK RETREAT, SY.NO.77,175/1,175/2A,175/2B,176/2A,176/2B & 177,KODATHI VILLAGE,VARTHUR HOBLI, BENGALURU EAST, BENGALURU URBAN | Ongoing | Feb 2027 | Not due yet |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep GODREJ LAKESIDE ORCHARD on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 54 registered projects within 2 km.
BIRLA EVARA
VARDHITA PROPERTIES PRIVATE LIMITED
DSR HIGHLAND GREENZ
DSR INFRA PROJECTS
TRIFECTA VANTO PHASE-1
TRIFECTA PROJECTS PRIVATE LIMITED
Adarsh Tropica (Phase-2)
ORCHIDS APARTMENTS PVT LTD
East Park Residences
Ramsons Trendsquares Realty LLP
ADARSH LUMINA
SHIVAKAR DEVELOPERS PRIVATE LIMITED
See every Bengaluru Urban project, with the district possession charts
Builder: Godrej Properties Limited
Godrej Properties Limited has 17 registrations on RERA Karnataka, including Godrej Woodland Phase 2 and GODREJ PARKSHIRE. Its filings declare 8 earlier projects, none of them declared completed. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if GODREJ LAKESIDE ORCHARD is delayed beyond 30 Sep 2030?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of GODREJ LAKESIDE ORCHARD?
The registered promoter entity is Godrej Properties Limited, a company as per the filing. Its CIN L74120MH1985PLC035308 and GSTIN 29AAACG3995M1ZX can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in GODREJ LAKESIDE ORCHARD?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against GODREJ LAKESIDE ORCHARD?
Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
Who certifies construction progress at GODREJ LAKESIDE ORCHARD?
The professionals named in the filing: Architect: NIMITA MAISNAM; Engineer: Madhura Manjrekar; Engineer: Akash Shahaji Dalvi; Chartered Accountant: BHAVESH D SHAH. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in GODREJ LAKESIDE ORCHARD?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters.