Home / Browse projects / Bengaluru Urban, Karnataka / TRIFECTA RETTO

Registration approved No litigation declared Residential/Group Housing project

TRIFECTA RETTO

By TRIFECTA PROJECTS PRIVATE LIMITED

RG-KA-12870 · RERA PRM/KA/RERA/1251/310/PR/060423/005849 · Last updated on RERA Karnataka portal: 26 Mar 2023

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Mar 2026Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 97 documents Report an error

TRIFECTA RETTO is a Residential/Group Housing project by TRIFECTA PROJECTS PRIVATE LIMITED in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/060423/005849 on 6 Apr 2023. Possession is promised by 26 Mar 2026.

At a glance

Project

  • NameTRIFECTA RETTO
  • TypeResidential/Group Housing
  • Location
    • Bengaluru South
    • Bengaluru Urban
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1251/310/PR/060423/005849
  • ReraGenie IDRG-KA-12870

Builder

  • NameTRIFECTA PROJECTS PRIVATE LIMITED
  • Entity typeCompany
  • CINU45200KA2012PTC062831
  • GSTIN29AACCE9717F1ZG
  • Authorized SignatoryGEDI SYLENDRA KUMAR REDDY
  • Managing DirectorR V Subba Reddy
  • DirectorsR V Subba Reddy, Ramireddy Sarada Reddy, GEDI SYLENDRA KUMAR REDDY
  • Project HeadR V Subba Reddy
  • Other registrations5 more →

Key dates

this monthRegisteredApr 2023PromisedMar 2026

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on6 Apr 2023
  • Promised completion26 Mar 2026
  • Revised completionNone
  • Buildings2 building records
  • Documents filed97 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A---94094
B---94094

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 26 Mar 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)-
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work-
Internal and External work including landscapes as per sanctioned drawings-

Progress on shared amenities40

As on 26 Mar 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemYes-
Water conservation/rain water harvesting/recharge of ground waterNoNot applicable
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes-
Solid waste management and disposalNoNot applicable
Emergency Evacuation servicesYes-
Internal Roads & FootpathsYes-
Electricity supply transformer and substationYes-
Storm water drainsYes-
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)Yes-
Parks & Tree plantingYes-
Street LightingYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseYes-
Community HallYes-
Outdoor Sports facilityYes-
Indoor Sports facilityYes-
Swimming PoolYes-
GymYes-
ParksYes-
Power BackupYes-
Piped GasNoNot applicable
Water and SanitationYes-
Air ConditioningYes-
StaircasesYes-
LiftsYes-
Corridor/LobbiesYes-
Fire escapesYes-
Common entrance and exit for the building/common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areasYes-
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes-
Common storage spacesYes-

Land and ownership2

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Named landowners2
LandownerVillageDistrict
J Shivappa--
J. Hari--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 82.78 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 60.68 cr-
Payment of taxesRs 5.72 cr-
Principal sum and interest payable to financial institutions-Scheduled BanksRs 5.50 cr-
On-site expenditure-Salaries of workersRs 4.58 cr-
On-site expenditure-Site OverheadRs 4.58 cr-
On-site expenditure-Consultants FeesRs 1.72 cr-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRevathi SR
EngineerRamesh B
Chartered AccountantB Manohar Babu

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed97

As listed on the registration, under the names the promoter filed them with; the newest 80 of 97 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/060423/005849 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Old Project: Annual Audit Form 7_TRIFECTA BUENOFile: Form 7_TRIFECTA BUENO.pdf26 Mar 2023
Old Project: Annual Audit Form 7_TRIFECTA VERDE EN RESPLENDORFile: Form 7_TRIFECTA VERDE EN RESPLENDOR.pdf26 Mar 2023
ADVOCATE SEARCH REPORTFile: Advocate Search Report.pdf26 Mar 2023
certified Carpet area calculationFile: Certified Carpet Area Calculation.pdf26 Mar 2023
CDP map showing the proposed siteFile: CDP Map.pdf26 Mar 2023
village map showing the proposed siteFile: Village MAP.pdf26 Mar 2023
relinquishment deed (Road widening area)File: Clarification for Road widening Relinquishment deed.pdf26 Mar 2023
SEIAA NOCFile: SEIAA Environment Clearence.pdf26 Mar 2023
estimated cost of construction for civil works certified by the EngineerFile: Estimation certificate Trifecta RETTO.pdf26 Mar 2023
Certificate from Registered Engineer indicating the structural safety for the proposed buildingFile: Structural Safty Certificate.pdf26 Mar 2023
project name and project address and upload the signed copy of the project specification pertains toFile: Project Specifications.pdf26 Mar 2023
proforma of Agreement for SaleFile: Proforma Agreement for sale.pdf26 Mar 2023
Proforma Allotment letterFile: Proforma ALlotment Letter.pdf26 Mar 2023
STP design drawing and STP demarcation drawing as per the guidelines of KSPCBFile: Z STP.pdf26 Mar 2023
section 3(1) notarized affidavit by incorporating with the project name and project addressFile: Affidavit.pdf26 Mar 2023
clarify the source of water supply to the project/ residential ApartmentFile: Clarification for Water Supply.pdf26 Mar 2023
Project Location & Demarcation of areal viewFile: Project Location & Demarcation of areal view.pdf26 Mar 2023
Source of FundsFile: Source of Fund.pdf26 Mar 2023
RTC, survey 79/2-
Mutation, survey 79/2-
Encumbrance Certificate, survey 79/2-
Conversion/Alienation Order, survey 79/2-
JDA, survey 79/2-
Khatha, survey 79/2-
Registration CertificateFile: Company Registration Certificate.PDF-
Organization StructureFile: Organisation Structure.pdf-
Certificate issued by CA Form 1File: Form 1 CA Certificate RERA_compressed.pdf-
Certificate issued by Architect Form 2File: Form 1 Architect Certificate.pdf-
Certificate issued by Engineer Form 3File: Form 3 Trifecta Retto_compressed.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: A Affidavit.pdf-
Certificate from Chartered AccountFile: Form 1 CA Certificate RERA_compressed.pdf-
Balance Sheet 2021 - 2022File: Attached below Clarification.pdf-
Balance Sheet 2020 - 2021File: TRIFECTA Balance Sheet-2021.pdf-
Balance Sheet 2019 - 2020File: TRIFECTA Balance Sheet-2020.pdf-
Audited Profit and Loss Statement 2021 - 2022File: TRIFECTA P_L -2022.pdf-
Audited Profit and Loss Statement 2020 - 2021File: TRIFECTA P_L -2021.pdf-
Audited Profit and Loss Statement 2019 - 2020File: TRIFECTA P_L -2019.pdf-
Director's Report 2021 - 2022File: Attached below Clarification.pdf-
Director's Report 2020 - 2021File: Direct Report 2021_compressed.pdf-
Director's Report 2019 - 2020File: Directors Report 2020-compressed.pdf-
Cash Flow Statement 2021 - 2022File: TRIFECTA CF 2021-22.pdf-
Cash Flow Statement 2020 - 2021File: TRIFECTA CF 2020-21.pdf-
Auditor's Report 2021 - 2022File: Attached below Clarification.pdf-
Auditor's Report 2020 - 2021File: Audit Report 20-21.pdf-
Auditor's Report 2019 - 2020File: Auditor Report-2020.pdf-
Income Tax Return Acknowledgement 2021 - 2022File: ITR V 21-22.pdf-
Income Tax Return Acknowledgement 2020 - 2021File: ITR 2020-21.pdf-
Income Tax Return Acknowledgement 2019 - 2020File: ITR 2019-20.pdf-
Trifecta Sanction letter-
NOC BESCOM_compressed-
NOC Water Grama Panchayati-
Approved Plan-
Approved Plan-
Approved Plan-
Approved Plan-
Specifications-
JDA_compressed-
A Form B-
A Non-Litigation-
Attached below Clarification-
NOC BESCOM_compressed-
NOC Water Grama Panchayati-
NOC AIRPORT_compressed-
NOC FIRE_compressed (1)-compressed-
NOC Pollution-
NOC SEIAA-
NOC BSNL-
Conversion Order-
Conversion Order-
Mutation-
RELEASE DEED POINT-
PARTITION DEED_compressed (1)-
GPA_compressed-
GOVT GUIDELINE VALUE-
Sub reg gud val-
TRIFECTA Balance Sheet-2022-
Directors Report 2022-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep TRIFECTA RETTO on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

Builder: TRIFECTA PROJECTS PRIVATE LIMITED

TRIFECTA PROJECTS PRIVATE LIMITED has 6 registrations on RERA Karnataka, including Trifecta Veranza and TRIFECTA RETTO. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if TRIFECTA RETTO is delayed beyond 26 Mar 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of TRIFECTA RETTO?

The registered promoter entity is TRIFECTA PROJECTS PRIVATE LIMITED, a company as per the filing. Its CIN U45200KA2012PTC062831 and GSTIN 29AACCE9717F1ZG can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in TRIFECTA RETTO?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at TRIFECTA RETTO?

The professionals named in the filing: Architect: Revathi SR; Engineer: Ramesh B; Chartered Accountant: B Manohar Babu. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in TRIFECTA RETTO?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About TRIFECTA RETTO. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save TRIFECTA RETTO to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.