Home / Browse projects / Bengaluru Urban, Karnataka / TRENDSQUARE AMBIENCE

Registration approved No litigation declared Residential/Group Housing project

TRENDSQUARE AMBIENCE

By Trendsquares Constructions

RG-KA-46841 · RERA PRM/KA/RERA/1251/446/PR/060423/005842 · Last updated on RERA Karnataka portal: 14 Dec 2024

Source: official RERA Karnataka filing

Red flags

  • 2 complaints at RERA Karnataka

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
Jun 2024Possession promisedno revision filed
2Complaints at RERA Karnatakaon this registration
Jump to the 136 documents Report an error

TRENDSQUARE AMBIENCE is a Residential/Group Housing project by Trendsquares Constructions in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/060423/005842 on 6 Apr 2023. Possession is promised by 30 Jun 2024. 2 complaints are on record with the regulator.

At a glance

Project

  • NameTRENDSQUARE AMBIENCE
  • TypeResidential/Group Housing
  • Location
    • Bengaluru East
    • Bengaluru Urban
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1251/446/PR/060423/005842
  • ReraGenie IDRG-KA-46841

Builder

  • NameTrendsquares Constructions
  • Entity typePartnership Firm
  • GSTIN29AANFT6548D1ZP
  • Authorized SignatoryRamireddy Lakshmi Prasanna
  • Other registrations2 more →
  • Declared earlier projects2 →

Key dates

this monthRegisteredApr 2023PromisedJun 2024

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on6 Apr 2023
  • Promised completion30 Jun 2024
  • Revised completionNone
  • Buildings3 building records
  • Documents filed136 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower A, B & C---45045
Tower B---60060
Tower C---90090

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 14 Dec 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)-
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Wardrobe, Showcase, Kitchen cabinet, Puja work-
Elevation work-
Internal and External work including landscapes as per sanctioned drawings-

Progress on shared amenities38

As on 14 Dec 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
Energy managementYes-
Fire protection and fire safety requirementsYes-
Solid waste management and disposalYes-
Emergency Evacuation servicesYes-
Internal Roads & FootpathsYes-
Electricity supply transformer and substationYes-
Storm water drainsYes-
Use of renewable energyYes-
Sewage Treatment Plant (STP)Yes-
Parks & Tree plantingYes-
Street LightingYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseYes-
Community HallYes-
Outdoor Sports facilityYes-
Indoor Sports facilityYes-
Swimming PoolYes-
GymYes-
ParksYes-
Power BackupYes-
Piped GasYes-
StaircasesYes-
LiftsYes-
Corridor/LobbiesNoNot applicable
Fire escapesYes-
Common entrance and exit for the building/common portico/foyer/verandahNoNot applicable
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areasYes-
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes-
Common storage spacesNoNot applicable

Land and ownership4

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Named landowners4
LandownerVillageDistrict
B.R.Alluri Sitharamaraju--
Bondu Bhagath Singh--
B.R.Ragamma--
Bondu Ramaswamy M--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 115.52 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 96.02 cr-
Payment of taxesRs 8.00 cr-
Principal sum and interest payable to financial institutions-Scheduled BanksRs 6.00 cr-
On-site expenditure-Consultants FeesRs 3.00 cr-
On-site expenditure-Cost Of Services(Water, Electricity, Sewage)Rs 84.00 lakh-
On-site expenditure-Salaries of workersRs 83.00 lakh-
On-site expenditure-Site OverheadRs 83.00 lakh-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRachita Bhonsle
EngineerM.N. Lakshmi Keshava
Chartered AccountantAnnimireddy Ramakrishna

Complaints filed with RERA Karnataka2

Case no.ComplainantRespondentFiled
01637/2023-Trendsquares Constructions31/10/2023
00540/2024-Trendsquares Constructions04/06/2024

Documents filed136

As listed on the registration, under the names the promoter filed them with; the newest 80 of 136 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/060423/005842 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Ambience Ext Bank ac change clarificationFile: Ambience Ext Bank ac change clarification.pdf14 Dec 2024
Form Ex Form BFile: Form Ex Form B.pdf14 Dec 2024
Form Ex 1 AmbienceFile: Form Ex 1 Ambience.pdf14 Dec 2024
Form Ex 2 AmbienceFile: Form Ex 2 Ambience.pdf14 Dec 2024
Latest ECFile: Latest EC.pdf14 Dec 2024
Renewed Sanction planFile: Renewed Sanction plan.pdf14 Dec 2024
As per quarterly updates project is not completed yet, PRM/KA/RERA/1251/309/PR/181022/002098File: Declaration for 100% completion of old project.pdf28 Mar 2023
all the sources of funds to complete the projectFile: Source of Funds.pdf28 Mar 2023
BWSSB NOC ClarificationFile: BWSSB NOC Notice, Request Letter & Affidavit.pdf28 Mar 2023
PRM/KA/RERA/1251/309/PR/181022/002098 status of the projectFile: Clarification for Ortus Phase I PRMKARERA1251309PR181022002098 completion.pdf9 Mar 2023
Designated bank account number not matched with CA certificateFile: Form - 1, Chartered Accountant (Reg)_compressed.pdf9 Mar 2023
What are all the sources of funds to complete the projectFile: Clarification for Sources of funds ambience.pdf9 Mar 2023
total area of plan is 9914 sq mtr therefore rupees 44480 need to payFile: Clarification for reg charges payment.pdf9 Mar 2023
project detail address field mentioned PID nos and synos of shivanahlli village and jakkur village ,File: Clarification for Project address.pdf9 Mar 2023
need RTC obtained from revenue department office and MRsFile: RTC Tanisandra.pdf9 Mar 2023
need RTC obtained from revenue department office and MRsFile: MR 4 Tanisandra.pdf9 Mar 2023
need conversion order for 0.08 gunatsFile: Conversion merge 8 guntas.pdf9 Mar 2023
individual local authority kathas before amalgamation and consolidated katha after amalgamationFile: katha for 2 acres.pdf9 Mar 2023
katha name of M devaraj is present as per sale deed he has no right instead of his name trendsquareFile: 100_1 Katha M Devaraj.pdf9 Mar 2023
sale deed from muniyappa and confirmation deed from M devaraj to kalyan builders and developers pvtFile: 8 Guntas Saledeed to SKB from Muniyappa_compressed.pdf9 Mar 2023
AC court order copy regarding sale valid orderFile: AC Court Order Copy.pdf9 Mar 2023
synos 100/8 and 100/7 in project need to upload documents for those synosFile: Clarificaation for Sy no 100-8 100-7.pdf9 Mar 2023
land owners sign in joint affidavitFile: Affidavit cum Declaration joint affidavit.pdf9 Mar 2023
ec from 01-04-2005 to upto date for synos and kahata noFile: EC.pdf9 Mar 2023
advocate search report is incomplete pagesFile: Ambience Leagal Opinion_compressed.pdf9 Mar 2023
certified copy obtained by the concerned Sub-registrar regarding value of the property on the basFile: Sub reg guidence Value certificate.pdf9 Mar 2023
Project Address in the project details page and sanction plan not matching Clarify / Upload the releFile: Clarification for Project address.pdf9 Mar 2023
FAR As per the sanction Plan is Not Matching with the details EnteredFile: Clarification for FAR with Plan reference.pdf9 Mar 2023
Upload CDP map showing the proposed siteFile: CDP MAP.pdf9 Mar 2023
Upload village map showing the proposed site.File: Tanisandra village map_compressed.pdf9 Mar 2023
Upload SEIAA NOCFile: SEAI NOC.pdf9 Mar 2023
Upload Building LicenseFile: Building Licence Done.pdf9 Mar 2023
Upload KSPCB CFE and the promoter name in the NOC is not matchingFile: Clarification for kspcb cfe & NOC Name.pdf9 Mar 2023
Updated area details are incorrect, please update the area details properly as per sanctioned drawiFile: Clarification for area and cost details updation.pdf9 Mar 2023
Updated cost details are incorrect, please update the cost details properly as per CA and Engineer cFile: Clarification for area and cost details updation.pdf9 Mar 2023
Please upload the project Engineer license certificateFile: Engineer Licence certificate.pdf9 Mar 2023
The cost mentioned on the Engineer certificate does not tally with the cost mentioned on the cost dFile: Form three Engineer Certificate.pdf9 Mar 2023
Please upload the renewed BESCOM NOC along with the copy of fee receipt paid towards NOC.File: BESCOM NOC.pdf9 Mar 2023
Please upload the valid BWSSB NOC along with the copy of fee receipt paid towards BOC.File: NOC BWSSB.pdf9 Mar 2023
Please mention the project name and project address and upload the signed copy of the project specifFile: Clarification for project specifications.pdf9 Mar 2023
Please upload the Certificate from Registered Engineer indicating the structural safety adopted forFile: Structural Safety certificate.pdf9 Mar 2023
Please mention the time line completion date and Project name in the Para 7.1 & 14 and upload the prFile: Proforma Agreement for sale.pdf9 Mar 2023
Please mention the project name project address and upload the section 3(1) notarizedFile: Affidavit.pdf9 Mar 2023
Please upload the STP design drawing and STP demarcation drawingFile: STP Drawings.pdf9 Mar 2023
individual local authority kathas before amalgamation and consolidated katha after amalgamationFile: Amalgamated katha with saikalyani.pdf9 Mar 2023
individual local authority kathas before amalgamation and consolidated katha after amalgamationFile: Amalgamated Katha With Trendsauares name.pdf9 Mar 2023
Boundries MAPFile: Boundries MAP.pdf9 Mar 2023
Confirmation deed from Devaraj to SKB_compressedFile: Confirmation deed from Devaraj to SKB_compressed.pdf9 Mar 2023
Affidavit Non-LitigationFile: Affidavit Non-Litigation.pdf9 Mar 2023
Please update the Type of Inventory and No. of Inventory with the BHK wise break up details on the pFile: Inventory details clarification.pdf9 Mar 2023
RTC, survey 100/1-
Mutation, survey 100/1-
Encumbrance Certificate, survey 100/1-
Conversion/Alienation Order, survey 100/1-
JDA, survey 100/1-
Khatha, survey 100/1-
Registration CertificateFile: Trends square partnership deed.pdf-
Partnership DeedFile: Trends square partnership deed.pdf-
Partner Details-
Partner Details-
Certificate issued by CA Form 1File: Form - 1, Chartered Accountant (Reg)_compressed.pdf-
Certificate issued by Architect Form 2File: Form Two.pdf-
Certificate issued by Engineer Form 3File: Form three Engineer Certificate.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: Joint Affidavit.pdf-
Certificate from Chartered AccountFile: Form - 1, Chartered Accountant (Reg)_compressed.pdf-
Balance Sheet 2021 - 2022File: Bs 22.pdf-
Balance Sheet 2020 - 2021File: Bs 21.pdf-
Balance Sheet 2019 - 2020File: Bs 20.pdf-
Audited Profit and Loss Statement 2021 - 2022File: Pnl 22.pdf-
Audited Profit and Loss Statement 2020 - 2021File: PnL 21.pdf-
Audited Profit and Loss Statement 2019 - 2020File: PnL 20.pdf-
Director's Report 2021 - 2022File: FIn Clarification.pdf-
Director's Report 2020 - 2021File: FIn Clarification.pdf-
Director's Report 2019 - 2020File: FIn Clarification.pdf-
Cash Flow Statement 2021 - 2022File: FIn Clarification.pdf-
Cash Flow Statement 2020 - 2021File: FIn Clarification.pdf-
Auditor's Report 2021 - 2022File: Ar 22.pdf-

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 declared completed, no finish date filed
ProjectLocationStatusPromisedDelivered
TRENDSQUARES ORTUS- PHASE Isy. No.40/1, near lakshminarayana Temple, amruthahalli, , sahakar nagar postCompleted-No date filed
TRENDSQUARES ORTUS - PHASE IIsy. No.40/1, near lakshminarayana Temple, amruthahalli, , sahakar nagar postCompleted-No date filed

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep TRENDSQUARE AMBIENCE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

Builder: Trendsquares Constructions

TRENDSQUARES CONSTRUCTIONS has 3 registrations on RERA Karnataka, including Trendsquares ORTUS- Phase I and TRENDSQUARES ORTUS - PHASE II. Its filings declare 2 earlier projects, 2 of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if TRENDSQUARE AMBIENCE is delayed beyond 30 Jun 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of TRENDSQUARE AMBIENCE?

The registered promoter entity is Trendsquares Constructions, a partnership firm as per the filing. Its GSTIN 29AANFT6548D1ZP can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in TRENDSQUARE AMBIENCE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against TRENDSQUARE AMBIENCE?

Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

Who certifies construction progress at TRENDSQUARE AMBIENCE?

The professionals named in the filing: Architect: Rachita Bhonsle; Engineer: M.N. Lakshmi Keshava; Chartered Accountant: Annimireddy Ramakrishna. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in TRENDSQUARE AMBIENCE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About TRENDSQUARE AMBIENCE. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save TRENDSQUARE AMBIENCE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.