Home / Browse projects / Bengaluru Urban, Karnataka / TRENDSQUARE AMBIENCE
TRENDSQUARE AMBIENCE
RG-KA-46841 · RERA PRM/KA/RERA/1251/446/PR/060423/005842 · Last updated on RERA Karnataka portal: 14 Dec 2024
Source: official RERA Karnataka filing
Red flags
- 2 complaints at RERA Karnataka
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
Saved.
TRENDSQUARE AMBIENCE is a Residential/Group Housing project by Trendsquares Constructions in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/060423/005842 on 6 Apr 2023. Possession is promised by 30 Jun 2024. 2 complaints are on record with the regulator.
At a glance
Project
- NameTRENDSQUARE AMBIENCE
- TypeResidential/Group Housing
- Location
- Bengaluru East
- Bengaluru Urban
- PincodeNot stated
- RERA no.PRM/KA/RERA/1251/446/PR/060423/005842
- ReraGenie IDRG-KA-46841
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on6 Apr 2023
- Promised completion30 Jun 2024
- Revised completionNone
- Buildings3 building records
- Documents filed136 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Tower A, B & C | - | - | - | 45 | 0 | 45 |
| Tower B | - | - | - | 60 | 0 | 60 |
| Tower C | - | - | - | 90 | 0 | 90 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 14 Dec 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
Building:
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | - |
| Foundation footing work | - |
| Upto Plinth Level | - |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | - |
| Retaining wall (All types) | - |
| RCC or MS Framed structure | - |
| Masonry Construction | - |
| Plastering inside , outside & Ceiling | - |
| Joinery: Doors, Windows, Ventilators etc | - |
| Basic work of Water supply, Sanitary and Electrification | - |
| Dadoing, Skirting, Flooring, Tiles work (All types) | - |
| Railing and Grill fixing | - |
| Electrification, Water supply and Sanitary Finishing | - |
| Painting | - |
| Fire prevention and fire fighting fitting and fixture with network | - |
| Weather Proof work(tile,concrete) | - |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | - |
| Elevation work | - |
| Internal and External work including landscapes as per sanctioned drawings | - |
Progress on shared amenities38
As on 14 Dec 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | - |
| Sewage and Drainage System | Yes | - |
| Water conservation/rain water harvesting/recharge of ground water | Yes | - |
| Energy management | Yes | - |
| Fire protection and fire safety requirements | Yes | - |
| Solid waste management and disposal | Yes | - |
| Emergency Evacuation services | Yes | - |
| Internal Roads & Footpaths | Yes | - |
| Electricity supply transformer and substation | Yes | - |
| Storm water drains | Yes | - |
| Use of renewable energy | Yes | - |
| Sewage Treatment Plant (STP) | Yes | - |
| Parks & Tree planting | Yes | - |
| Street Lighting | Yes | - |
| Electricity | Yes | - |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | - |
| Club House | Yes | - |
| Community Hall | Yes | - |
| Outdoor Sports facility | Yes | - |
| Indoor Sports facility | Yes | - |
| Swimming Pool | Yes | - |
| Gym | Yes | - |
| Parks | Yes | - |
| Power Backup | Yes | - |
| Piped Gas | Yes | - |
| Staircases | Yes | - |
| Lifts | Yes | - |
| Corridor/Lobbies | No | Not applicable |
| Fire escapes | Yes | - |
| Common entrance and exit for the building/common portico/foyer/verandah | No | Not applicable |
| Basement | Yes | - |
| Terrace | Yes | - |
| Outer Wall | Yes | - |
| Open parking areas | Yes | - |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | Yes | - |
| Common storage spaces | No | Not applicable |
Land and ownership4
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| B.R.Alluri Sitharamaraju | - | - |
| Bondu Bhagath Singh | - | - |
| B.R.Ragamma | - | - |
| Bondu Ramaswamy M | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 96.02 cr | - |
| Payment of taxes | Rs 8.00 cr | - |
| Principal sum and interest payable to financial institutions-Scheduled Banks | Rs 6.00 cr | - |
| On-site expenditure-Consultants Fees | Rs 3.00 cr | - |
| On-site expenditure-Cost Of Services(Water, Electricity, Sewage) | Rs 84.00 lakh | - |
| On-site expenditure-Salaries of workers | Rs 83.00 lakh | - |
| On-site expenditure-Site Overhead | Rs 83.00 lakh | - |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Rachita Bhonsle |
| Engineer | M.N. Lakshmi Keshava |
| Chartered Accountant | Annimireddy Ramakrishna |
Complaints filed with RERA Karnataka2
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| 01637/2023 | - | Trendsquares Constructions | 31/10/2023 |
| 00540/2024 | - | Trendsquares Constructions | 04/06/2024 |
Documents filed136
As listed on the registration, under the names the promoter filed them with; the newest 80 of 136 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/060423/005842 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Ambience Ext Bank ac change clarificationFile: Ambience Ext Bank ac change clarification.pdf | 14 Dec 2024 |
| Form Ex Form BFile: Form Ex Form B.pdf | 14 Dec 2024 |
| Form Ex 1 AmbienceFile: Form Ex 1 Ambience.pdf | 14 Dec 2024 |
| Form Ex 2 AmbienceFile: Form Ex 2 Ambience.pdf | 14 Dec 2024 |
| Latest ECFile: Latest EC.pdf | 14 Dec 2024 |
| Renewed Sanction planFile: Renewed Sanction plan.pdf | 14 Dec 2024 |
| As per quarterly updates project is not completed yet, PRM/KA/RERA/1251/309/PR/181022/002098File: Declaration for 100% completion of old project.pdf | 28 Mar 2023 |
| all the sources of funds to complete the projectFile: Source of Funds.pdf | 28 Mar 2023 |
| BWSSB NOC ClarificationFile: BWSSB NOC Notice, Request Letter & Affidavit.pdf | 28 Mar 2023 |
| PRM/KA/RERA/1251/309/PR/181022/002098 status of the projectFile: Clarification for Ortus Phase I PRMKARERA1251309PR181022002098 completion.pdf | 9 Mar 2023 |
| Designated bank account number not matched with CA certificateFile: Form - 1, Chartered Accountant (Reg)_compressed.pdf | 9 Mar 2023 |
| What are all the sources of funds to complete the projectFile: Clarification for Sources of funds ambience.pdf | 9 Mar 2023 |
| total area of plan is 9914 sq mtr therefore rupees 44480 need to payFile: Clarification for reg charges payment.pdf | 9 Mar 2023 |
| project detail address field mentioned PID nos and synos of shivanahlli village and jakkur village ,File: Clarification for Project address.pdf | 9 Mar 2023 |
| need RTC obtained from revenue department office and MRsFile: RTC Tanisandra.pdf | 9 Mar 2023 |
| need RTC obtained from revenue department office and MRsFile: MR 4 Tanisandra.pdf | 9 Mar 2023 |
| need conversion order for 0.08 gunatsFile: Conversion merge 8 guntas.pdf | 9 Mar 2023 |
| individual local authority kathas before amalgamation and consolidated katha after amalgamationFile: katha for 2 acres.pdf | 9 Mar 2023 |
| katha name of M devaraj is present as per sale deed he has no right instead of his name trendsquareFile: 100_1 Katha M Devaraj.pdf | 9 Mar 2023 |
| sale deed from muniyappa and confirmation deed from M devaraj to kalyan builders and developers pvtFile: 8 Guntas Saledeed to SKB from Muniyappa_compressed.pdf | 9 Mar 2023 |
| AC court order copy regarding sale valid orderFile: AC Court Order Copy.pdf | 9 Mar 2023 |
| synos 100/8 and 100/7 in project need to upload documents for those synosFile: Clarificaation for Sy no 100-8 100-7.pdf | 9 Mar 2023 |
| land owners sign in joint affidavitFile: Affidavit cum Declaration joint affidavit.pdf | 9 Mar 2023 |
| ec from 01-04-2005 to upto date for synos and kahata noFile: EC.pdf | 9 Mar 2023 |
| advocate search report is incomplete pagesFile: Ambience Leagal Opinion_compressed.pdf | 9 Mar 2023 |
| certified copy obtained by the concerned Sub-registrar regarding value of the property on the basFile: Sub reg guidence Value certificate.pdf | 9 Mar 2023 |
| Project Address in the project details page and sanction plan not matching Clarify / Upload the releFile: Clarification for Project address.pdf | 9 Mar 2023 |
| FAR As per the sanction Plan is Not Matching with the details EnteredFile: Clarification for FAR with Plan reference.pdf | 9 Mar 2023 |
| Upload CDP map showing the proposed siteFile: CDP MAP.pdf | 9 Mar 2023 |
| Upload village map showing the proposed site.File: Tanisandra village map_compressed.pdf | 9 Mar 2023 |
| Upload SEIAA NOCFile: SEAI NOC.pdf | 9 Mar 2023 |
| Upload Building LicenseFile: Building Licence Done.pdf | 9 Mar 2023 |
| Upload KSPCB CFE and the promoter name in the NOC is not matchingFile: Clarification for kspcb cfe & NOC Name.pdf | 9 Mar 2023 |
| Updated area details are incorrect, please update the area details properly as per sanctioned drawiFile: Clarification for area and cost details updation.pdf | 9 Mar 2023 |
| Updated cost details are incorrect, please update the cost details properly as per CA and Engineer cFile: Clarification for area and cost details updation.pdf | 9 Mar 2023 |
| Please upload the project Engineer license certificateFile: Engineer Licence certificate.pdf | 9 Mar 2023 |
| The cost mentioned on the Engineer certificate does not tally with the cost mentioned on the cost dFile: Form three Engineer Certificate.pdf | 9 Mar 2023 |
| Please upload the renewed BESCOM NOC along with the copy of fee receipt paid towards NOC.File: BESCOM NOC.pdf | 9 Mar 2023 |
| Please upload the valid BWSSB NOC along with the copy of fee receipt paid towards BOC.File: NOC BWSSB.pdf | 9 Mar 2023 |
| Please mention the project name and project address and upload the signed copy of the project specifFile: Clarification for project specifications.pdf | 9 Mar 2023 |
| Please upload the Certificate from Registered Engineer indicating the structural safety adopted forFile: Structural Safety certificate.pdf | 9 Mar 2023 |
| Please mention the time line completion date and Project name in the Para 7.1 & 14 and upload the prFile: Proforma Agreement for sale.pdf | 9 Mar 2023 |
| Please mention the project name project address and upload the section 3(1) notarizedFile: Affidavit.pdf | 9 Mar 2023 |
| Please upload the STP design drawing and STP demarcation drawingFile: STP Drawings.pdf | 9 Mar 2023 |
| individual local authority kathas before amalgamation and consolidated katha after amalgamationFile: Amalgamated katha with saikalyani.pdf | 9 Mar 2023 |
| individual local authority kathas before amalgamation and consolidated katha after amalgamationFile: Amalgamated Katha With Trendsauares name.pdf | 9 Mar 2023 |
| Boundries MAPFile: Boundries MAP.pdf | 9 Mar 2023 |
| Confirmation deed from Devaraj to SKB_compressedFile: Confirmation deed from Devaraj to SKB_compressed.pdf | 9 Mar 2023 |
| Affidavit Non-LitigationFile: Affidavit Non-Litigation.pdf | 9 Mar 2023 |
| Please update the Type of Inventory and No. of Inventory with the BHK wise break up details on the pFile: Inventory details clarification.pdf | 9 Mar 2023 |
| RTC, survey 100/1 | - |
| Mutation, survey 100/1 | - |
| Encumbrance Certificate, survey 100/1 | - |
| Conversion/Alienation Order, survey 100/1 | - |
| JDA, survey 100/1 | - |
| Khatha, survey 100/1 | - |
| Registration CertificateFile: Trends square partnership deed.pdf | - |
| Partnership DeedFile: Trends square partnership deed.pdf | - |
| Partner Details | - |
| Partner Details | - |
| Certificate issued by CA Form 1File: Form - 1, Chartered Accountant (Reg)_compressed.pdf | - |
| Certificate issued by Architect Form 2File: Form Two.pdf | - |
| Certificate issued by Engineer Form 3File: Form three Engineer Certificate.pdf | - |
| Project Chartered Accountant | - |
| Project Engineer | - |
| Project Architect | - |
| AffidavitFile: Joint Affidavit.pdf | - |
| Certificate from Chartered AccountFile: Form - 1, Chartered Accountant (Reg)_compressed.pdf | - |
| Balance Sheet 2021 - 2022File: Bs 22.pdf | - |
| Balance Sheet 2020 - 2021File: Bs 21.pdf | - |
| Balance Sheet 2019 - 2020File: Bs 20.pdf | - |
| Audited Profit and Loss Statement 2021 - 2022File: Pnl 22.pdf | - |
| Audited Profit and Loss Statement 2020 - 2021File: PnL 21.pdf | - |
| Audited Profit and Loss Statement 2019 - 2020File: PnL 20.pdf | - |
| Director's Report 2021 - 2022File: FIn Clarification.pdf | - |
| Director's Report 2020 - 2021File: FIn Clarification.pdf | - |
| Director's Report 2019 - 2020File: FIn Clarification.pdf | - |
| Cash Flow Statement 2021 - 2022File: FIn Clarification.pdf | - |
| Cash Flow Statement 2020 - 2021File: FIn Clarification.pdf | - |
| Auditor's Report 2021 - 2022File: Ar 22.pdf | - |
Promoter's earlier projects2
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Status | Promised | Delivered |
|---|---|---|---|---|
| TRENDSQUARES ORTUS- PHASE I | sy. No.40/1, near lakshminarayana Temple, amruthahalli, , sahakar nagar post | Completed | - | No date filed |
| TRENDSQUARES ORTUS - PHASE II | sy. No.40/1, near lakshminarayana Temple, amruthahalli, , sahakar nagar post | Completed | - | No date filed |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep TRENDSQUARE AMBIENCE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Prestige Park Grove
PRESTIGE PROJECTS PRIVATE LIMITED
Prestige Lakeside Habitat
Prestige Habitat Ventures
LivingTree by Kalyani Developers
Kalyani Tech Park Private Limited
PRESTIGE FALCON CITY
PRESTIGE NOTTINGHILL INVESTMENTS
SATTVA CITY
SATTVA CITY PRIVATE LIMITED
GM AMBITIOUS ENCLAVE
M/s. Allam Infinite India Private Limited
See every Bengaluru Urban project, with the district possession charts
Builder: Trendsquares Constructions
TRENDSQUARES CONSTRUCTIONS has 3 registrations on RERA Karnataka, including Trendsquares ORTUS- Phase I and TRENDSQUARES ORTUS - PHASE II. Its filings declare 2 earlier projects, 2 of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if TRENDSQUARE AMBIENCE is delayed beyond 30 Jun 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of TRENDSQUARE AMBIENCE?
The registered promoter entity is Trendsquares Constructions, a partnership firm as per the filing. Its GSTIN 29AANFT6548D1ZP can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in TRENDSQUARE AMBIENCE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against TRENDSQUARE AMBIENCE?
Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
Who certifies construction progress at TRENDSQUARE AMBIENCE?
The professionals named in the filing: Architect: Rachita Bhonsle; Engineer: M.N. Lakshmi Keshava; Chartered Accountant: Annimireddy Ramakrishna. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in TRENDSQUARE AMBIENCE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback