ReraGenieLog inGet a buyer report

Home / Browse projects / Bengaluru Urban, Karnataka / “Townsville”

Registration approved Residential/Group Housing project

“Townsville”

By M/s. GM INFINITE DWELLING (INDIA) PVT LTD

RG-KA-46388 · RERA PRM/KA/RERA/1251/308/PR/180611/001885

Source: official RERA Karnataka filing

Red flags

  • 10 complaints at RERA Karnataka
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • Separate project account declared
Oct 2020Possession promisedmoved 12 months from the original
10Complaints at RERA Karnatakaon this registration
Jump to the 55 documents Report an error

“Townsville” is a Residential/Group Housing project by M/s. GM INFINITE DWELLING (INDIA) PVT LTD in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/308/PR/180611/001885 on 11 Jun 2018. Possession is promised by 10 Oct 2020. The completion date has moved by 12 months from the original filing. 10 complaints are on record with the regulator.

At a glance

Project

  • Name“Townsville”
  • TypeResidential/Group Housing
  • Location
    • Anekal
    • Bengaluru Urban
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1251/308/PR/180611/001885
  • ReraGenie IDRG-KA-46388

Builder

  • NameM/s. GM INFINITE DWELLING (INDIA) PVT LTD
  • Entity typeCompany
  • CINU45400KA2007PTC043955
  • Authorized SignatoryJawid Hussain

Key dates

this monthRegisteredJun 2018First promiseOct 2019Revised toOct 2020

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on11 Jun 2018
  • Promised completion10 Oct 2020
  • Revised completionRevised to 10 Oct 2020 (originally 10 Oct 2019)
  • Buildings1 building record
  • Documents filed55 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Townsville---1240124

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)Not applicable
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsYes-
Sewage and Drainage SystemYes-
Parks & Tree plantingYes-
Street LightingYes-
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes-
Solid waste management and disposalYes-
Water conservationNoNot applicable
Energy managementYes-
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesYes-
Electricity supply transformer and substationYes-
Emergency Evacuation servicesYes-
Storm water drainsYes-
Use of renewable energyNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseYes-
Community HallYes-
Outdoor Sports facilityYes-
Indoor Sports facilityYes-
Swimming PoolYes-
GymYes-
ParksYes-
Power BackupYes-
GasNoNot applicable
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesNoNot applicable
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesYes-
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area20,033 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 169.90 cr

Certifying professionals and partners1

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
EngineerMunish Sharma

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EX/PRM/KA/RERA/1251/308/PR/220620/001885Oct 2019 → Oct 2020

Reason as filed by the promoterothers

Complaints filed with RERA Karnataka10

Case no.ComplainantRespondentFiled
CMP/210309/0007765-M/s. GM INFINITE DWELLING (INDIA) PVT LTD09/03/2021
CMP/210425/0007924-M/s. GM INFINITE DWELLING (INDIA) PVT LTD25/04/2021
CMP/220909/0009995-M/s. GM INFINITE DWELLING (INDIA) PVT LTD09/09/2022
00144/2024-M/s. GM INFINITE DWELLING (INDIA) PVT LTD30/01/2024
01023/2024-M/s. GM INFINITE DWELLING (INDIA) PVT LTD18/10/2024
00002/2025-M/s. GM INFINITE DWELLING (INDIA) PVT LTD01/01/2025
00010/2025-M/s. GM INFINITE DWELLING (INDIA) PVT LTD02/01/2025
00011/2025-M/s. GM INFINITE DWELLING (INDIA) PVT LTD02/01/2025
00031/2025-M/s. GM INFINITE DWELLING (INDIA) PVT LTD04/01/2025
00261/2026-M/s. GM INFINITE DWELLING (INDIA) PVT LTD16/03/2026

Documents filed55

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/308/PR/180611/001885 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CertificateFile: Incorporation Certificate of GMIDPL.pdf-
Architect Certificate for Work Completion Schedule till DateFile: Arc certificate - work completed.pdf-
Engineer Certificate for Work Completion Schedule till DateFile: Arc certificate - work completed.pdf-
CA Certificate for Funds UtilizationFile: Arc certificate - work completed.pdf-
Architect Certificate for Pending Work Completion Schedule.File: Arc certificate - work completed.pdf-
Engineer Certificate for Pending Work Completion Schedule.File: Arc certificate - work completed.pdf-
CA Certificate for Funds required for Project CompletionFile: Arc certificate - work completed.pdf-
AffidavitFile: 2 AFFIDAVITS.pdf-
Latest Encumbrance CertificateFile: EC Latest.pdf-
Details Of Sold/ Un-sold UnitsFile: Details of Sold Units by Patel.pdf-
Commencement Certificate-
Apprvd building plan pdf-
DP Plan-
Proforma of Sale Deed TOWNSVILLE-
Proforma of Sale Agreement Townsville-
Sale deed & RTC-
Apprvd building plan pdf-
DP Plan-
Allotment Letter-Townsville-
Broucher townsville-
01-MOEF-
Project Specifications-Annexture -I-
EC--
Katha Sy No 352 ( old155-11)-
JDA & GPA-
Conversons-
02-AAI-
03-BWSSB-
05-KSPCB-
01-MOEF-
04-BSNL-
Site plan-
Apprvd building plan pdf-
CLU townsville-
Balance Sheet 2016 - 2017File: Balance sheet 2017.pdf-
Balance Sheet 2015 - 2016File: Balance Sheet 2015-16.pdf-
Balance Sheet 2014 - 2015File: Balance Sheet 2014-15.pdf-
Audited Profit and Loss Statement 2016 - 2017File: Profit & Loss Sheet 2016-17.pdf-
Audited Profit and Loss Statement 2015 - 2016File: P & L Ac 2015-16.pdf-
Audited Profit and Loss Statement 2014 - 2015File: P & L 2014-15.pdf-
Director's Report 2016 - 2017File: Director Report 2016-17.pdf-
Director's Report 2015 - 2016File: Directors report 2015-16.pdf-
Director's Report 2014 - 2015File: Directors report 2014-15.pdf-
Cash Flow Statement 2016 - 2017File: cash flow 2016-2017.pdf-
Cash Flow Statement 2015 - 2016File: Cash Flow 2015-16.pdf-
Auditor's Report 2016 - 2017File: Auditors report 2016-2017.pdf-
Auditor's Report 2015 - 2016File: Auditor Report 2015-16.pdf-
Auditor's Report 2014 - 2015File: Auditor Report 2014-15.pdf-
Income Tax Return Acknowledgement 2016 - 2017File: IT Acknowledgement 2016-17.pdf-
Income Tax Return Acknowledgement 2015 - 2016File: IT Acknowledgement 2015-16.pdf-
Income Tax Return Acknowledgement 2014 - 2015File: IT Acknowledgement 2014-15.pdf-
Affidivat Cum Declaration-
Prospectus/BrochureFile: GM-Townsville-BROCHURE.pdf-
Advertisement Copy 1File: Advertisement Townville.pdf-
Tower Excel SheetFile: PRM_KA_RERA_1251_308_PR_180611_001885.xlsx-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one moved by 12 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep “Townsville” on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

Builder: M/s. GM INFINITE DWELLING (INDIA) PVT LTD

M/s. GM INFINITE DWELLING (INDIA) PVT LTD has 1 registration on RERA Karnataka, including “Townsville”. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if “Townsville” is delayed beyond 10 Oct 2020?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of “Townsville”?

The registered promoter entity is M/s. GM INFINITE DWELLING (INDIA) PVT LTD, a company as per the filing. Its CIN U45400KA2007PTC043955 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in “Townsville”?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against “Townsville”?

Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

Who certifies construction progress at “Townsville”?

The professionals named in the filing: Engineer: Munish Sharma. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in “Townsville”?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About “Townsville”. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save “Townsville” to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.