Red flags
- Completion date moved by 9 months
- 1 extension taken
Clear
- No complaints on record
- Separate project account declared
Saved.
Tower 7 One Bangalore West is a Residential/Group Housing project by Palladium Constructions Pvt. Ltd., in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/309/PR/190412/002524 on 12 Apr 2019. Possession is promised by 7 Nov 2024. The completion date has moved by 9 months from the original filing.
At a glance
Project
- NameTower 7 One Bangalore West
- TypeResidential/Group Housing
- Location
- Bengaluru North
- Bengaluru Urban
- PincodeNot stated
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/309/PR/190412/002524
- ReraGenie IDRG-KA-77929
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on12 Apr 2019
- Promised completion7 Nov 2024
- Revised completionRevised to 7 Nov 2024 (originally 7 Feb 2024)
- Buildings1 building record
- Documents filed96 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Tower 1 | - | - | - | 122 | 0 | 122 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 20 Oct 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
Building:
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | - |
| Foundation footing work | - |
| Retaining wall (All types) | - |
| Plinth level Beam | Not applicable |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | - |
| RCC or MS Framed structure | - |
| Masonry construction: Bricks, Concrete blocks etc | - |
| Plastering inside , outside & Ceiling | - |
| Joinery: Doors, Windows, Ventilators etc | - |
| Basic work of Water supply, Sanitary and Electrification | - |
| Dadoing, Skirting, Flooring, Tiles work (All types) | - |
| Railing and Grill fixing | - |
| Electrification, Water supply and Sanitary Finishing | - |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Fire prevention and fire fighting fitting and fixture with network | - |
| Weather Proof work(tile,concrete) | - |
| Painting | - |
| Elevation work | - |
| Internal and External work including landscapes as per santioned drawings | - |
Progress on shared amenities41
As on 20 Oct 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | - |
| Internal Roads & Footpaths | Yes | - |
| Sewage and Drainage System | Yes | - |
| Parks & Tree planting | No | Not applicable |
| Street Lighting | Yes | - |
| Provision for community buildings and for treatment and disposal of sewage and sullage water | Yes | - |
| Solid waste management and disposal | Yes | - |
| Water conservation | Yes | - |
| Energy management | Yes | - |
| Fire protection and fire safety requirements | Yes | - |
| Education/Health/Other public amenities | Yes | - |
| Electricity supply transformer and substation | Yes | - |
| Emergency Evacuation services | Yes | - |
| Storm water drains | Yes | - |
| Use of renewable energy | Yes | - |
| Water conservation/rain water harvesting/recharge of ground water | Yes | - |
| Electricity | Yes | - |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | - |
| Club House | Yes | - |
| Community Hall | Yes | - |
| Outdoor Sports facility | Yes | - |
| Indoor Sports facility | Yes | - |
| Swimming Pool | Yes | - |
| Gym | Yes | - |
| Parks | Yes | - |
| Power Backup | Yes | - |
| Gas | Yes | - |
| Water and Sanitation | Yes | - |
| Air Conditioning And incerntion | No | Not applicable |
| Staircases | Yes | - |
| Lifts | Yes | - |
| Staircases and Lift lobbies, corridor,lobbies, corridor | Yes | - |
| Fire escapes | Yes | - |
| Common entrance and exit for the building / common portico/foyer/verandah | Yes | - |
| Basement | Yes | - |
| Terrace | Yes | - |
| Outer Wall | Yes | - |
| Open parking areas and common storage spaces | No | Not applicable |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | Yes | - |
Land and ownership
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
No reason recorded in the filing
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed96
As listed on the registration, under the names the promoter filed them with; the newest 80 of 96 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/309/PR/190412/002524 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Block 1 1A 1B 1C Basement Carparking PlanFile: Block 1 1A 1B 1C Basement Carparking Plan pdf.pdf | 20 Oct 2022 |
| Block 1 1A 1B 1C Section PlanFile: Block 1 1A 1B 1C Section Plan.pdf | 20 Oct 2022 |
| Block 1 1st 2nd 27th Level Floor PlanFile: Block 1 1st 2nd 27th Level Floor Plan.pdf | 20 Oct 2022 |
| Block 1 and 1a 1st to 23rd Floor PlanFile: Block 1 and 1a 1st to 23rd Floor Plan pdf.pdf | 20 Oct 2022 |
| Block 1 and 1a 1st to 23rd Floor PlanFile: Block 1 and 1A ground Floor Plan pdf.pdf | 20 Oct 2022 |
| Block 1a 7th10th 24th 30th Tarrece Floor PlanFile: Block 1a 7th10th 24th 30th Tarrece Floor Plan pdf.pdf | 20 Oct 2022 |
| Block 3 2nd 28th to 29th FloorFile: Block 3 2nd 28th to 29th Floor.pdf | 20 Oct 2022 |
| Block 3A 27th 28th Floors Block 3B 29th FloorFile: Block 3A 27th 28th Floors Block 3B 29th Floor.pdf | 20 Oct 2022 |
| Block 3A 27th 28th Floors Block 3B 29th FloorFile: Block 3D 1st 2nd 29th Floors.pdf | 20 Oct 2022 |
| Tower 1 Block 1 1A 1B 1C Basement ParkingFile: Tower 1 Block 1 1A 1B 1C Basement Parking.pdf | 20 Oct 2022 |
| Tower 1 Block 1 1A 1B 1C Basement Parking PlanFile: Tower 1 Block 1 1A 1B 1C Basement Parking Plan.pdf | 20 Oct 2022 |
| Tower 1 Block 1 1A 1B 1C Basement Parking PlanFile: Tower 1 Block 1 1A 1B 1C Basement Parking Plan.pdf | 20 Oct 2022 |
| Tower 1 Block 1 1A 1B 1C Basement Parking PlanFile: Tower 1 Block 1 1A 1B 1C Basement Parking Plan.pdf | 20 Oct 2022 |
| Tower 1 ElevationFile: Tower 1 Elevation.pdf | 20 Oct 2022 |
| DRC certificate 2976File: 3 DRC certificate 2976.pdf | 20 Oct 2022 |
| Certificate 001907File: Certificate 001907.pdf | 20 Oct 2022 |
| DRC 22File: DRC 22.pdf | 20 Oct 2022 |
| DRC 29File: DRC 29.pdf | 20 Oct 2022 |
| 1b Tower 7 Structural Stability CertFile: 1b Tower 7 Structural Stability Cert.pdf | 20 Oct 2022 |
| 1d Total Units sold and Unsold as per new planFile: 1d Total Units sold and Unsold as per new plan.xlsx | 20 Oct 2022 |
| 2c Total Units sold and Unsold as per old planFile: 2c Total Units sold and Unsold as per old plan.xlsx | 20 Oct 2022 |
| QUERYFile: Query.pdf | 20 Oct 2022 |
| CertificateFile: Certificate of Incorporation PCPL.pdf | - |
| Already registered project ongoing detailsFile: 07 PRMKARERA1251309PR190412002524.pdf | - |
| Modified plan details site plan, floor plans, Plan Licence LetterFile: 08 Licence and Conditions 2021.pdf | - |
| Elevation, Sections, Specifications ( If changes are there )File: 09 Elevation n.pdf | - |
| List Of AllotteesFile: 10 List of allottees.pdf | - |
| Consent LetterFile: CONSENT LETTERS 12.pdf | - |
| Chartered Accountant CertificateFile: 12 CA certificate.pdf | - |
| Notarized AffidavitFile: 16 Affidavit.pdf | - |
| Engineer CertificateFile: 14 Engineer Certificate.pdf | - |
| Architect CertificateFile: 13 Architect Certificate.pdf | - |
| Modification of Plan DetailsFile: BBMP Site Plan 8th feb 2019.pdf | - |
| Modification of Plan DetailsFile: 03 Project Plan 2021.pdf | - |
| Modification of Plan DetailsFile: 04 CC for Block 1A.pdf | - |
| Modification of Plan DetailsFile: 04 CC for Block 1A.pdf | - |
| Modification of Plan DetailsFile: 05 Sold and Unsold as per old plan.xlsx | - |
| Modification of Plan DetailsFile: 06 Sold and Unsold as per new plan.xlsx | - |
| Document 1File: 221220 BSNL NOC.pdf | - |
| Document 2File: AAI NOC 12032020.pdf | - |
| Document 3File: BESCOM NOC.PDF | - |
| Document 4File: BWSSB NOC.pdf | - |
| Document 5File: Fire NOC.pdf | - |
| Document 6File: KSPCB.pdf | - |
| Modification LetterFile: Tower 7 Modification covering letter.pdf | - |
| Licence Copy For Modified Plan Sanction 08-02-2019 | - |
| ALL TYPICAL FLOOR PLANS | - |
| Sale Deed shall be uploaded shorty | - |
| ATS Shall be uploaded shortly | - |
| All sale deeds | - |
| BDA Mod DP plan 2018 | - |
| BBMP Site Plan 8th feb 2019 | - |
| Allotment Letter shall be uploaded shortly | - |
| Specifications | - |
| Encumbrance certificates till feb 2019 | - |
| Affidavit | - |
| Land documents | - |
| Land documents | - |
| Noc's | - |
| SECTION PLAN BLOCK 1, 1A, 1B, & 1C | - |
| SECTION PLAN BLOCK 1, 1A, 1B, & 1C | - |
| Land documents | - |
| Legal opinion PCPL_compressed | - |
| Balance Sheet 2017 - 2018File: Balence Sheet 17 - 18.pdf | - |
| Balance Sheet 2016 - 2017File: Balence Sheet 16 - 17.pdf | - |
| Balance Sheet 2015 - 2016File: Balence Sheet 15 - 16.pdf | - |
| Audited Profit and Loss Statement 2017 - 2018File: Statement of Profit and Loss 17 - 18.pdf | - |
| Audited Profit and Loss Statement 2016 - 2017File: Statement of Profit and Loss 16 - 17.pdf | - |
| Audited Profit and Loss Statement 2015 - 2016File: Statement of Profit and Loss 15-16.pdf | - |
| Director's Report 2017 - 2018File: Statement of Profit and Loss 17 - 18.pdf | - |
| Director's Report 2016 - 2017File: Statement of Profit and Loss 16 - 17.pdf | - |
| Director's Report 2015 - 2016File: Statement of Profit and Loss 15-16.pdf | - |
| Cash Flow Statement 2017 - 2018File: Cash Flow 17 - 18.pdf | - |
| Cash Flow Statement 2016 - 2017File: Cash Flow 16 - 17.pdf | - |
| Auditor's Report 2017 - 2018File: Auditors Report 17 - 18.pdf | - |
| Auditor's Report 2016 - 2017File: Auditors Report 17 - 18.pdf | - |
| Auditor's Report 2015 - 2016File: Auditors Report 16 - 17.pdf | - |
| Income Tax Return Acknowledgement 2017 - 2018File: ITR Acknowledgment 16 - 17.pdf | - |
| Income Tax Return Acknowledgement 2016 - 2017File: ITR Acknoledegment 17 - 18.pdf | - |
| Income Tax Return Acknowledgement 2015 - 2016File: ITR Acknowledgement 15 - 16.pdf | - |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep Tower 7 One Bangalore West on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 23 registered projects within 2 km.
Prestige Park Grove
PRESTIGE PROJECTS PRIVATE LIMITED
Prestige Lakeside Habitat
Prestige Habitat Ventures
LivingTree by Kalyani Developers
Kalyani Tech Park Private Limited
PRESTIGE FALCON CITY
PRESTIGE NOTTINGHILL INVESTMENTS
SATTVA CITY
SATTVA CITY PRIVATE LIMITED
GM AMBITIOUS ENCLAVE
M/s. Allam Infinite India Private Limited
See every Bengaluru Urban project, with the district possession charts
Builder: Palladium Constructions Pvt. Ltd.,
Palladium Constructions Pvt Ltd has 6 registrations on RERA Karnataka, including NIWA of Kessaku and FAIA of Kessaku. Its filings declare 1 earlier project, 1 of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if Tower 7 One Bangalore West is delayed beyond 7 Nov 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of Tower 7 One Bangalore West?
The registered promoter entity is Palladium Constructions Pvt. Ltd.,, a company as per the filing. Its CIN U45400MH2008PTC178115 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in Tower 7 One Bangalore West?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
What should I check before booking in Tower 7 One Bangalore West?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback