Red flags

  • 1 complaint at RERA Karnataka
  • Completion date moved by 15 months
  • 2 extensions taken

Clear

  • Separate project account declared
Mar 2023Possession promisedmoved 15 months from the original
1Complaints at RERA Karnatakaon this registration
Jump to the 47 documents Report an error

Torino is a Residential/Group Housing project by Suadela Constructions Private Limited in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/190305/002472 on 5 Mar 2019. Possession is promised by 31 Mar 2023. The completion date has moved by 15 months from the original filing. 1 complaint is on record with the regulator.

At a glance

Project

  • NameTorino
  • TypeResidential/Group Housing
  • Location
    • Bengaluru South
    • Bengaluru Urban
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1251/310/PR/190305/002472
  • ReraGenie IDRG-KA-58649

Builder

  • NameSuadela Constructions Private Limited
  • Entity typeCompany
  • CINU45200MH2007PTC172213
  • Authorized SignatoryDebdoot Das
  • Other registrations1 more →

Key dates

this monthRegisteredMar 2019First promiseDec 2021Revised toMar 2023

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on5 Mar 2019
  • Promised completion31 Mar 2023
  • Revised completionRevised to 31 Mar 2023 (originally 31 Dec 2021)
  • Buildings1 building record
  • Documents filed47 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TORINO---96096

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsYes-
Sewage and Drainage SystemYes-
Parks & Tree plantingYes-
Street LightingYes-
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes-
Solid waste management and disposalYes-
Water conservationYes-
Energy managementYes-
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesYes-
Electricity supply transformer and substationYes-
Emergency Evacuation servicesYes-
Storm water drainsYes-
Use of renewable energyNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseYes-
Community HallYes-
Outdoor Sports facilityYes-
Indoor Sports facilityYes-
Swimming PoolYes-
GymYes-
ParksYes-
Power BackupYes-
GasNoNot applicable
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesYes-
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesYes-
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes-

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,781 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 24.04 cr

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

ExtensionDec 2021 → Sep 2022

No reason recorded in the filing

EX/PRM/KA/RERA/1251/310/PR/220930/002472Sep 2022 → Mar 2023

Reason as filed by the promoterForce Majeure

Complaints filed with RERA Karnataka1

Case no.ComplainantRespondentFiled
01295/2023-Suadela Constructions Private Limited25/08/2023

Documents filed47

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/190305/002472 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CertificateFile: Company Incoroporation.pdf-
Architect Certificate for Work Completion Schedule till DateFile: Torino - Form-Ex1 Architect Certificate For Status of Work As On Date 31072022.pdf-
Engineer Certificate for Work Completion Schedule till DateFile: Engg_Cert_Torino-form5.pdf-
CA Certificate for Funds UtilizationFile: Torino - Form 3.pdf-
Architect Certificate for Pending Work Completion Schedule.File: Evita - Form-Ex2 Architect Certificate For Pending Work As On Date 31072022.pdf-
Engineer Certificate for Pending Work Completion Schedule.File: Engg_Cert_Torino-form6.pdf-
CA Certificate for Funds required for Project CompletionFile: Torino - Form 4.pdf-
AffidavitFile: Torino- Form B_compressed.pdf-
Latest Encumbrance CertificateFile: EC 23062021 to 20072022 Sy no 330 (1).pdf-
Details Of Sold/ Un-sold UnitsFile: SoldUnsoldDetails_Torino.xlsx-
Document 1File: Torino - Form Ex 7 Affidavit for seeking extension.pdf-
COMMENCEMENT CERITIFICATE-
RERA-Torino-Block - 7B-Model (1)-
Site Plan-
performa of sale-
performa of sale-
Sale Deed-
Torino RERA Area Plan-ilovepdf-compressed-
Development Plan-
Brouchers-
Torino - RERA Additional Fees-
Project Specification-
EC-
TORINO Project Affidavit-
Katha-
JDA-
Conversion Order-
Torino - RERA Additional Fees-
Torino - RERA Additional Fees-
Site Plan-
Legal Openion-
Income Tax Return Acknowledgement 2017 - 2018File: ITR AY 2017-18.pdf-
Income Tax Return Acknowledgement 2016 - 2017File: ITR AY 2016-17.pdf-
Income Tax Return Acknowledgement 2015 - 2016File: ITR AY 2015-16.pdf-
Form B-
Tower Excel SheetFile: PRM_KA_RERA_1251_310_PR_190305_002472.xlsx-
Stability CertificateFile: Structural stability_Torino.pdf-
NOC issued by the Fire Force department after completion of workFile: FIRE NOC_Torino.pdf-
Occupancy CertificateFile: OC Evita & Torino (1).pdf-
Consent for operation issued by KSPCBFile: NOC FROM PCB_Torino.pdf-
Certificate of operation for lifts issued by the Chief of Department of Electrical inspectorate Government of File: Completed.pdf-
Sanctioned Letter issued by concerned ESCOM of Power sanction and details of transformer installed and whetherFile: NOC FROM BESCOM_Torino.pdf-
Sanctioned letter issued by concerned water supply and sanitary board for the projectFile: NOC FROM BWSSB_Torino.pdf-
Details of external infrastructure work such as drive way, play area, park, STP and water treatment plant, WheFile: Completed.pdf-
Architect certificate for having completed the work(in format no 5)File: Torino - Architect certificate 24032023 .jpeg-
Chartered Accountant certificate for having completed the work(in format no 4)File: RERA CERTIFICATE-TORINO PROJECT.pdf-
Affidavit cum declaration from promoter for having completed the project as per specification and as per adverFile: Torino Aff Cum Declaration 27032023.pdf-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one moved by 15 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep Torino on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

Builder: Suadela Constructions Private Limited

Suadela Constructions Private limited has 2 registrations on RERA Karnataka, including Queens Gate Block 4 and Torino. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if Torino is delayed beyond 31 Mar 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Torino?

The registered promoter entity is Suadela Constructions Private Limited, a company as per the filing. Its CIN U45200MH2007PTC172213 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Torino?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Torino?

Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

What should I check before booking in Torino?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Torino. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Torino to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.