ReraGenieLog inGet a buyer report

Home / Browse projects / Bengaluru Urban, Karnataka / TIRUMALA HOMES KODIPALYA

Registration approved Residential/Group Housing project

TIRUMALA HOMES KODIPALYA

By TIRUMALA PROPERTIES

RG-KA-47048 · RERA PRM/KA/RERA/1251/310/PR/191025/002977

Source: official RERA Karnataka filing

Red flags

  • Completion date moved by 9 months
  • 1 extension taken

Clear

  • No complaints on record
  • Separate project account declared
Apr 2024Possession promisedmoved 9 months from the original
0Complaints at RERA Karnatakaon this registration
Jump to the 47 documents Report an error

TIRUMALA HOMES KODIPALYA is a Residential/Group Housing project by TIRUMALA PROPERTIES in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/191025/002977 on 25 Oct 2019. Possession is promised by 20 Apr 2024. The completion date has moved by 9 months from the original filing.

At a glance

Project

  • NameTIRUMALA HOMES KODIPALYA
  • TypeResidential/Group Housing
  • Location
    • Bengaluru South
    • Bengaluru Urban
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/310/PR/191025/002977
  • ReraGenie IDRG-KA-47048

Builder

  • NameTIRUMALA PROPERTIES
  • Entity typePartnership Firm
  • Authorized SignatoryK . BALAJI NAIDU

Key dates

this monthRegisteredOct 2019First promiseJul 2023Revised toApr 2024

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on25 Oct 2019
  • Promised completion20 Apr 2024
  • Revised completionRevised to 20 Apr 2024 (originally 20 Jul 2023)
  • Buildings1 building record
  • Documents filed47 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TIRUMALA HOMES KODIPALYA---36036

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)Not applicable
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)-
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsYes-
Sewage and Drainage SystemYes-
Parks & Tree plantingYes-
Street LightingYes-
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes-
Solid waste management and disposalYes-
Water conservationYes-
Energy managementYes-
Fire protection and fire safety requirementsYes-
Education/Health/Other public amenitiesYes-
Electricity supply transformer and substationYes-
Emergency Evacuation servicesYes-
Storm water drainsYes-
Use of renewable energyYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseNoNot applicable
Community HallYes-
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolYes-
GymYes-
ParksNoNot applicable
Power BackupYes-
GasNoNot applicable
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesNoNot applicable
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes-

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,115 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 8.50 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSiva Kumar.V
EngineerSrinivas Rao Bolimuta

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

ExtensionJul 2023 → Apr 2024

No reason recorded in the filing

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed47

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/191025/002977 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CertificateFile: Registration Certificate.pdf-
Commencement Certificate-
Approved Building Plan-
Approved Building Plan-
Proforma For Sale Deed-
Performa Agreement for Sale-
Sale Deed & RTC-
Approved Section of building-
Area Development Plan of project area-
Proforma of Allotment Letter-
Brochure of current project-
Project Specification-
Encumbrance Certificate-
Section 3(1) Notarized Affidavit-
JD AFFIDAVIT CUM DECLARATION-
Khatha-
Collaboration Agreement-
Any other document-
Fire force department NOC-
Airport Authority of India NOC-
BESCOM NOC-
BWSSB NOC-
KSPCB NOC-
SEIAA NOC-
BSNL NOC-
Existing Layout Plan-
Existing Section Plan and specification-
Advocate Search Report-
Balance Sheet 2017 - 2018File: Balance sheet.pdf-
Balance Sheet 2016 - 2017File: Balance sheet.pdf-
Balance Sheet 2015 - 2016File: Balance sheet.pdf-
Audited Profit and Loss Statement 2017 - 2018File: Audited Profit loss statement.pdf-
Audited Profit and Loss Statement 2016 - 2017File: Audited Profit loss statement.pdf-
Audited Profit and Loss Statement 2015 - 2016File: Audited Profit loss statement.pdf-
Director's Report 2017 - 2018File: Directors Report.pdf-
Director's Report 2016 - 2017File: Directors Report.pdf-
Director's Report 2015 - 2016File: Directors Report.pdf-
Cash Flow Statement 2017 - 2018File: Cash Flow Statement.pdf-
Cash Flow Statement 2016 - 2017File: Cash Flow Statement.pdf-
Auditor's Report 2017 - 2018File: Auditor Report.pdf-
Auditor's Report 2016 - 2017File: Auditor Report.pdf-
Auditor's Report 2015 - 2016File: Auditor Report.pdf-
Income Tax Return Acknowledgement 2017 - 2018File: Income Tax Return 18-19.pdf-
Income Tax Return Acknowledgement 2016 - 2017File: Income Tax Return 17-18.pdf-
Income Tax Return Acknowledgement 2015 - 2016File: Income Tax Return 16-17.pdf-
Declaration Form B-
Tower Excel SheetFile: PRM_KA_RERA_1251_310_PR_191025_002977.xlsx-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one moved by 9 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep TIRUMALA HOMES KODIPALYA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmTIRUMALA HOMES KODIPALYAOther 20Dot size: filed unitsN

Filed coordinates, straight-line distance. 20 registered projects within 2 km.

Builder: TIRUMALA PROPERTIES

TIRUMALA PROPERTIES has 1 registration on RERA Karnataka, including TIRUMALA HOMES KODIPALYA. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if TIRUMALA HOMES KODIPALYA is delayed beyond 20 Apr 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of TIRUMALA HOMES KODIPALYA?

The registered promoter entity is TIRUMALA PROPERTIES, a partnership firm as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in TIRUMALA HOMES KODIPALYA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at TIRUMALA HOMES KODIPALYA?

The professionals named in the filing: Architect: Siva Kumar.V; Engineer: Srinivas Rao Bolimuta. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in TIRUMALA HOMES KODIPALYA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About TIRUMALA HOMES KODIPALYA. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save TIRUMALA HOMES KODIPALYA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.