The Rising 58

By Ashapura United

RG-MH-56196 · RERA P51800034950 · Last updated on MahaRERA portal: 14 Feb 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
6 of 11Construction stages donefurthest along: Internal walls, 90%
0Complaints at MahaRERAon this registration
Jump to the 66 documents Report an error

The Rising 58 is a Residential / Group Housing project by Ashapura United in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800034950 on 28 Apr 2022. Possession was promised by 31 Dec 2025 and is now 10 months past that date.

At a glance

Project

  • NameThe Rising 58
  • TypeResidential / Group Housing
  • Location
    • Kannamwar Nagar 1
    • Vikhroli East
    • Kurla
    • Mumbai Suburban
    • 400083
  • Pincode400083
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800034950
  • ReraGenie IDRG-MH-56196

Builder

  • NameAshapura United
  • Entity typePartnership
  • PartnersDhilen Harilal Patel, Jay Navin Patel
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked

Key dates

10 months past promisethis monthRegisteredApr 2022PromisedDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on28 Apr 2022
  • Promised completion31 Dec 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed66 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
The Rising 58NA220000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 14 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 90%.

The Rising 58: 65% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises5%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.25%

Progress on shared amenities15

As on 14 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area938 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Kannamwar Nagar Prabhat CHS LtdKurlaMumbai Suburban

Approvals and building plan

Sanctioning authorityMHADA
Permissible FSI7584.0
Proposed, not sanctioned7,576 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI Bank Ltd, A Wing Sai Suman CHS, CTS No 252, Near Reliance Fresh, Station Road, Vikhroli East,

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRohit Parmar
EngineerM/s S V Patel & Associates
Chartered AccountantDNR CONSULTANCY LLP
Chartered AccountantHeena B Momaya & Co
PartnerRole in project
Ashapura United-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 1 Apr 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 7 Mar 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 7 Mar 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 Feb 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed66

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: AU- FORM 1 - ARCHITECT CERTIFICATE - 30-10-2025.pdf14 Feb 2026
Form 2File: 1521- RERA CERTIFICATE Form 2.pdf14 Feb 2026
Form 3File: Fianl Form 3 - CA Certificate.pdf14 Feb 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD.pdf14 Feb 2026
Form 1File: AU- FORM 1 - ARCHITECT CERTIFICATE - 30-10-2025.pdf27 Nov 2025
Form 2File: 1521- RERA CERTIFICATE Form 2.pdf27 Nov 2025
Form 3File: CA Certificate -26-11-2025-The Rising Form 3_compressed.pdf27 Nov 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD & UNSOLD.pdf27 Nov 2025
Form 1File: AU- FORM 1 - ARCHITECT CERTIFICATE - 18072025.pdf30 Aug 2025
Form 2File: Form 2 -1521 -RERA CERTIFICATE 10-08-2025.pdf30 Aug 2025
Form 3File: RERA Certificate - Form 3.pdf30 Aug 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD -KN58- 2-6-2025.pdf30 Aug 2025
Form 2File: The Rising 58 - Form 3 RERA Certificate 31-3-25.pdf11 Jun 2025
Form 3File: DISCLOSURE OF SOLD.pdf11 Jun 2025
Disclosure of Sold and Booked Inventory11 Jun 2025
Form 1File: FORM 2 (31-03-2025) Engineer Certificate.pdf3 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate_compressed (1).pdf27 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - -1521 -RERA CERTIFICATE (1) (2).pdf27 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AU- FORM 1 - ARCHITECT CERTIFICATE - 24-01-2025.pdf3 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate- 13-11-2024.pdf9 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 C A Certificate- 27-11-2024_compressed.pdf9 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: S V Patel Associates Form 2- Engineers Certificate.pdf9 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1521 - RERA CERTIFICATE.pdf13 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AU- FORM 1 - ARCHITECT CERTIFICATE - 15072024.pdf23 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Ashapura United- Rising 58 -19072024_compressed.pdf23 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate- Ashapura United - 10-04-2024 Signed copy.pdf7 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certi 1521 - RERA CERTIFIVATE.pdf7 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: AU_ CA Certificate Form 3 of Q4 2023-24 Signed_compressed.pdf7 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 - Annual Report on Statement of Accounts FY 2022-23.pdf12 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1521 - RERA CERTIFICATE 31-12-2023.pdf13 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate RERA Form 3_compressed (1).pdf10 Feb 2024
Other - FinanceFile: Declaration in Correction in Estimate Cost.pdf10 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate - 08-01-2024 with stamp n sign.pdf8 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - 30-09-2023 -1521 -RERA CERTIFICATE (1).pdf28 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA Form 3 CA Certificate 30-09-2023_compressed.pdf28 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA FORM 1 - United- 17-10-2023_compressed.pdf19 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - 30-06-2023 -1521 -RERA CERTIFICATE.pdf18 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate 30-06-2023_compressed.pdf18 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AU- FORM 1 - ARCHITECT CERTIFICATE - 18-07-2023.pdf20 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA Form 1 Architect Certificate 31-03-2023.pdf8 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - 31-03-2023 -1521 -RERA CERTIFICATE.pdf8 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA Certificate Form 3 CA 31-03-2023_compressed.pdf8 May 2023
Proforma of Agreement for saleFile: Agreement for sale Final Draft with Without Parking_compressed.pdf10 Apr 2023
Commencement Certificates / NA Order for plotted developmentFile: Further CC_signed Ashapura United.pdf10 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 RERA 31-12-2022_compressed.pdf6 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 RERA 31-12-22 Signed copy_compressed.pdf6 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate RERA 02-01-2023_compressed.pdf2 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 RERA signed certificate 30-09-2022.pdf19 Nov 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 RERA Certificate Signed 30-09-2022.pdf19 Nov 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AU- FORM 1 - ARCHITECT CERTIFICATE - 19-10-2022.pdf19 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer RERA CERTIFICATE_30-06-2022.pdf6 Aug 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA RERA CERTIFICATE 30-06-2022.pdf6 Aug 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate - 30-06-2022.pdf14 Jul 2022
Declaration in FORM BFile: FORM - B RERA - Society.pdf9 Apr 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - CA CERTIFICATE - 01-04-2022.pdf9 Apr 2022
Proforma of Allotment letterFile: allotment letter and agreement for sale Ashapura_compressed.pdf8 Apr 2022
Copy of the legal title reportFile: Title Certificate - Ashapura United.pdf1 Apr 2022
Details of encumbrancesFile: Free from encumbracrs certificate.pdf25 Mar 2022
Commencement Certificates / NA Order for plotted developmentFile: CC - BLDG NO 58.pdf25 Mar 2022
Declaration about Commencement CertificateFile: Declaration about CC.pdf25 Mar 2022
CERSAI detailsFile: Not created any interest Statement.pdf25 Mar 2022
Layout approvalFile: IOA Plan dated 21-02-2022_compressed.pdf7 Mar 2022
Building plan approvalFile: IOA - BLDG NO 58_compressed.pdf7 Mar 2022
PAN CardFile: PAN Card_compressed - Ashapura United.pdf7 Mar 2022
Copy of Layout Approval (in case of layout)File: IOA Plan dated 21-02-2022_compressed.pdf7 Mar 2022
Building Plan Approval / NA Order for plotted developmentFile: IOA - BLDG NO 58_compressed.pdf7 Mar 2022

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep The Rising 58 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Vikhroli East6,700+ in Mumbai Suburban

2 kmThe Rising 58Completed 24Lapsed / revoked 23Other 85Dot size: filed unitsN

Filed coordinates, straight-line distance. 132 registered projects within 2 km.

Builder: Ashapura United

Ashapura United has 2 registrations on MahaRERA, including The Rising 58 and The Legend. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that The Rising 58 shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if The Rising 58 is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of The Rising 58?

The registered promoter entity is Ashapura United, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in The Rising 58?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for The Rising 58?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at The Rising 58?

The professionals named in the filing: Architect: Rohit Parmar; Engineer: M/s S V Patel & Associates; Chartered Accountant: DNR CONSULTANCY LLP; Chartered Accountant: Heena B Momaya & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in The Rising 58?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About The Rising 58. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save The Rising 58 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.