Home / Browse projects / Bengaluru Urban, Karnataka / THE PINNACLE

Registration approved No litigation declared Residential/Group Housing project

THE PINNACLE

By Sruthika Builders & Developers

RG-KA-31045 · RERA PRM/KA/RERA/1251/472/PR/160224/006635 · Last updated on RERA Karnataka portal: 14 Oct 2026

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Dec 2027Possession promisedno revision filed
6 of 17Construction stages donefurthest along: Masonry Construction, 98%
78 of 120Units unsoldnot recorded sold or booked
0Complaints at RERA Karnatakaon this registration
Jump to the 157 documents Report an error

THE PINNACLE is a Residential/Group Housing project by Sruthika Builders & Developers in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/472/PR/160224/006635 on 16 Feb 2024. Possession is promised by 31 Dec 2027. 42 of the 120 units on this registration are recorded sold or booked, and 6 of 17 construction stages are filed complete.

At a glance

Project

  • NameTHE PINNACLE
  • TypeResidential/Group Housing
  • Location
    • Yelahanka
    • Bengaluru Urban
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1251/472/PR/160224/006635
  • ReraGenie IDRG-KA-31045

Builder

  • NameSruthika Builders & Developers
  • Entity typePartnership Firm
  • GSTIN29ABLFS7711C1Z1
  • Authorized SignatoryKasetty Kiran Kumar
  • Other registrations1 more →
  • Declared earlier projects1 →

Key dates

this monthRegisteredFeb 2024PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on16 Feb 2024
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed157 files

Current status

35%42 of 120 units booked
7.3%Of the estimated cost spent so far

Figures as on 14 Oct 2026, this project's latest RERA Karnataka filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A Block---1200120

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 14 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 17 construction stages are filed complete. The stage furthest along is Masonry Construction, at 98%.

Building: 97% average across the applicable activities

ActivityProgress
Earth work and other leveling preparation work100%
Foundation footing work100%
Upto Plinth Level100%
Sub-structure flooring (Parking Floor, more than one floor below general ground level)100%
Retaining wall (All types)100%
RCC or MS Framed structure100%
Masonry Construction98%
Plastering inside , outside & Ceiling97%
Joinery: Doors, Windows, Ventilators etc97%
Basic work of Water supply, Sanitary and Electrification97%
Dadoing, Skirting, Flooring, Tiles work (All types)96%
Railing and Grill fixing95%
Electrification, Water supply and Sanitary Finishing98%
Painting97%
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)97%
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work95%
Internal and External work including landscapes as per sanctioned drawings85%

Progress on shared amenities40

As on 14 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes88%
Sewage and Drainage SystemYes88%
Water conservation/rain water harvesting/recharge of ground waterYes65%
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Solid waste management and disposalNoNot applicable
Emergency Evacuation servicesNoNot applicable
Internal Roads & FootpathsYes0%
Electricity supply transformer and substationYes0%
Storm water drainsYes0%
Use of renewable energyYes0%
Sewage Treatment Plant (STP)Yes65%
Parks & Tree plantingNoNot applicable
Street LightingYes0%
ElectricityYes70%
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes70%
Club HouseNoNot applicable
Community HallYes0%
Outdoor Sports facilityYes0%
Indoor Sports facilityNoNot applicable
Swimming PoolYes0%
GymYes0%
ParksNoNot applicable
Power BackupYes0%
Piped GasNoNot applicable
Water and SanitationYes70%
Air ConditioningNoNot applicable
StaircasesYes90%
LiftsYes80%
Corridor/LobbiesYes75%
Fire escapesNoNot applicable
Common entrance and exit for the building/common portico/foyer/verandahYes65%
BasementYes99%
TerraceYes80%
Outer WallYes75%
Open parking areasNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes0%
Common storage spacesYes65%

Land and ownership19

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Named landowners19
LandownerVillageDistrict
Ms Navya M--
Smt SK Anjina--
Ms Prathibha M--
N Murthy--
N Shivanna--
Ms Lavanya--
Smt Shakunthala M--
N Srinivasa--
Ms Prithvi SS--
Smt Kausalya N--
S Shree Harsh--
Ms Aruna S--
Dilip S--
Dwneeth S--
Smt A Latha--
N Suresh--
Smt Sukanya--
Ms Kavana N--
Kirana N--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 31.18 cr
Cost incurredRs 2.29 cr
Spent of the estimate7.33%
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 28.13 crRs 1.98 cr
On-site expenditure-Salaries of workersRs 1.50 crRs 30.78 lakh
On-site expenditure-Consultants FeesRs 75.00 lakh-
Payment of chargesRs 40.00 lakh-
Principal sum and interest payable to financial institutions-Non Banking financial institution (NBFC)Rs 40.00 lakh-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPushpendra Kumar Bharti
EngineerIftikar Ahmad Chappu
Chartered AccountantKasiraju Venkata Chala Pavan Kumar

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed157

As listed on the registration, under the names the promoter filed them with; the newest 80 of 157 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/472/PR/160224/006635 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Sruthika SEP 26 Form -4, Chartered Accountant SIGNED.pdf14 Oct 2026
Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Sruthika SEP 26 Form -5, Architect (QU).pdf14 Oct 2026
Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Sruthika SEP 26 Form -6, Engineer (QU).pdf14 Oct 2026
Q2 2026-27 Water supply and sewage board14 Oct 2026
Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres)14 Oct 2026
Q2 2026-27 KPTCL- BESCOM14 Oct 2026
Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Sruthika Qu 1 2026-27 Form 4 CA.pdf11 Jul 2026
Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Sruthika Qu 1 26-27 Form -5 Architect.pdf11 Jul 2026
Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Sruthika Qu 1 2026-27 Form 6 Er.pdf11 Jul 2026
Q1 2026-27 Water supply and sewage board11 Jul 2026
Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres)11 Jul 2026
Q1 2026-27 KPTCL- BESCOM11 Jul 2026
Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Qu 4 25-26 Form 4 C A.pdf11 Apr 2026
Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Qu 4 25-26 Form -5 Ar.pdf11 Apr 2026
Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Qu 4 25-26 FORM- 6 Er.pdf11 Apr 2026
Q4 2025-26 Water supply and sewage board11 Apr 2026
Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres)11 Apr 2026
Q4 2025-26 KPTCL- BESCOM11 Apr 2026
Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4 Qu 3 25-26_compressed (1).pdf14 Jan 2026
Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Form 5 Qu 3 25-26.pdf14 Jan 2026
Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form 6 Qu 3 25-26.pdf14 Jan 2026
Q3 2025-26 Water supply and sewage board14 Jan 2026
Q3 2025-26 KSPCB- PCB (10 Acres to 125 Acres)14 Jan 2026
Q3 2025-26 KPTCL- BESCOM14 Jan 2026
Clarification on Mortgage cleared with full proofFile: To upload the back up papers for Mortgage clerance.pdf28 Jan 2024
Affidavit on BWSSB's NOCFile: To Upload Affidavit cum declaration BWSSB.pdf28 Jan 2024
Mortgage cleared backup papers RTC 47 (2)File: 1 Complete Clarification on cleared Mortgage with the evidence.pdf28 Dec 2023
Mortgage Cleared Certificate from VSSNLFile: Loan Clearance Certificate VSSNL (1).pdf28 Dec 2023
Clarification on Commencement Certificate with sanctioned planFile: 2 a Complete clarification on Commencement Certificate with evidence.pdf28 Dec 2023
Clarification on Commencement CertificateFile: Clarification on the Commencement Certificate 2.pdf28 Dec 2023
Sanctioned plan for 120 units with the digital signatureFile: Sanctioned plan with the digital signature.pdf28 Dec 2023
Clarification on FAR as per the sanctioned plan as no edit option on portalFile: 3 FAR Clarification (1).pdf28 Dec 2023
Height of tower 14.95 SQM no edit option so clarifiedFile: 7 Clarification over the height of the building with stability certificate.pdf28 Dec 2023
NOC BWSSB with Payt Legible ReceiptFile: 4 BWSSB NOC Dt 09 10 2019 incl Payment Receipts.pdf28 Dec 2023
CA's certificate for the sales reported in Financial Statement for Rs 4.46CRFile: 1 CA's Certificate on sales reported for Rs 446Cr.pdf4 Dec 2023
JD Affidavit and DeclarationFile: 1 JDA Affidavit_compressed.pdf4 Dec 2023
Clarification on Land not being pledged with the proofFile: 2 Clarification on the pledge of land and release order.pdf4 Dec 2023
Clarification over the commencement certificate and other relevent documentssFile: 3 Clarification on commencement certificate with other documents.pdf4 Dec 2023
Floor plan part of sanctioned plan with the digital signature of the officialFile: 4 Plan Sanctioned PRJ-5197_compressed.pdf4 Dec 2023
KSPCB CFE DocumentFile: 5 KSPCB CFE_compressed.pdf4 Dec 2023
Clarification on FARFile: 6 FAR Clarification (1).pdf4 Dec 2023
Built up area mentioned in the project page is as per sanctioned planFile: 4 Plan Sanctioned PRJ-5197_compressed.pdf4 Dec 2023
Clarification over the height of the building supported by the stability certificateFile: 7 Clarification over the height of the building with stability certificate.pdf4 Dec 2023
Form 6 of the ongoing project with up to date progress of workFile: 7 Ongoing The Pinnacle upto 30 09 2023 Form 6 Er Certificate.pdf4 Dec 2023
Project Specification with the Engineer's CertificationFile: 8 Project Specification with Engineer's Seal and signature.pdf4 Dec 2023
NOC of BWSSB with the payt receiptFile: 9 BWSSB NOC and Payt Receipt_compressed.pdf4 Dec 2023
Clarification as to why we made the late application for the registrationFile: 10 Clarification over the late application for registration with the evidence of no sales 4 Dec 2023
Break up of the units as certified by the EngineerFile: 10 Flat areas of THE PINNACLE.pdf4 Dec 2023
Engineer's license with BBMP also attached with the concerned details pageFile: 19 Er LIcense with BBMP.PDF4 Dec 2023
Stability Certificate as certified by Certified EngineerFile: The Pinnacle Stability of structure (PR)-1.pdf4 Dec 2023
Form 3 in the specified formatFile: FORM - 3.pdf4 Dec 2023
Bank Account 100 percent collection accountFile: 1 RERA Main Bank Account Main Account.pdf7 Nov 2023
Bank Account 70 percent balance accountFile: 1 RERA Main Bank Account 70 percent.pdf7 Nov 2023
Bank Account 30 percent balance accountFile: 1 RERA Main Bank Account 30 percent.pdf7 Nov 2023
Balance Sheet 2019-20 with UDIN and SchedulesFile: 2 B S with Schedules 2019-20.pdf7 Nov 2023
Balance Sheet 2020-21 with Udin and SchedulesFile: 2 B S with Schedules FY 2020 21.pdf7 Nov 2023
Balancer Sheet 2021-22 with Udin and SchedulesFile: 2 B S with Schedules FY 2021-22.pdf7 Nov 2023
Profit & Loss Account 2019-20 with Udin and SchedulesFile: 2 P & L Ac with Schedules 2019-20.pdf7 Nov 2023
Profit & LOss Account 2020-21 with Udin and SchedulesFile: 2 P & L Ac with Schedules 2020-21.pdf7 Nov 2023
Profit & LOss Account 2021-22 with Udin and SchedulesFile: 2 P & L Ac with Schedules 2021-22.pdf7 Nov 2023
Firm's PAN with the seal and signature of the PartnerFile: 3 Firm's Pan with seal and signature.pdf7 Nov 2023
Firm Registration Certificate with the existing partners for the projectFile: 4 Registration of Firms dated 23 09 2016.pdf7 Nov 2023
Reconstitution of the FirmFile: 4 Reconstitution of Parnership Deed dated 16 09 2016.pdf7 Nov 2023
RTC for Sy No 47 1 latestFile: 5 RTC 47 1 from 2021-22 to 2023-24_compressed.pdf7 Nov 2023
RTC for Sy No 47 2 latestFile: 5 RTC 47 2 FY 2023 24 upto 20 10 2023.pdf7 Nov 2023
RTC for Sy No 47 2 for the current yearFile: 5 RTC 47 2 FY 2022 23.pdf7 Nov 2023
EC Sy No 47 1 01 /04/ 2022 to up to dateFile: 6 ECC- 47 1 from 01 04 2022 to 11 10 2023.pdf7 Nov 2023
EC for Sy No 47 2 01/04/2022 to up to dateFile: 6 ECC- 47 2 from 01 04 2022 to 11 10 2023.pdf7 Nov 2023
Land DocumentFile: 7 Land Documents 6 Lr to DC_compressed.pdf7 Nov 2023
Land Title DocumentFile: 7 Land Title Documents_compressed.pdf7 Nov 2023
Partition DeedFile: 7 Partition Deed_compressed_compressed.pdf7 Nov 2023
Plan Sanctioned for 120 unitsFile: 8 Plan Sanctioned PRJ-5197_compressed.pdf7 Nov 2023
Clarification on Single Plot LayoutFile: 9 Clarification on Single Plot Layout or Order.pdf7 Nov 2023
Clarification on Single Layout OrderFile: 9 Clarification on Single Plot Layout or Order.pdf7 Nov 2023
Flat Areas of the Project as certifiedFile: 10 Flat areas of THE PINNACLE.pdf7 Nov 2023
CDPFile: 11 Pinnacle CDP_compressed.pdf7 Nov 2023
Village MapFile: 12 Singapura village map.pdf7 Nov 2023
Clarification on commencement certificate with the supporting documentsFile: 13 Clarification on commencement certificate with documents.pdf7 Nov 2023
Floor Drawings according to the plan sanctionedFile: 14 Floor drawings Plan Sanctioned compressed.pdf7 Nov 2023
KSPCB NOCFile: 15 KSPCB NOC compressed.pdf7 Nov 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 declared completed, no finish date filed
ProjectLocationStatusPromisedDelivered
Sruthika SpringFieldsSy No 219/46&47/1, Singapura Main Road, Vidyaranyapura Post, Bangalore NorthCompleted-No date filed

How this compares with Bengaluru Urban

35%of this project is bookeddistrict median 51%
34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep THE PINNACLE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

Builder: Sruthika Builders & Developers

SRUTHIKA BUILDERS & DEVELOPERS has 2 registrations on RERA Karnataka, including Sruthika Springfields and THE PINNACLE. Its filings declare 1 earlier project, 1 of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if THE PINNACLE is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of THE PINNACLE?

The registered promoter entity is Sruthika Builders & Developers, a partnership firm as per the filing. Its GSTIN 29ABLFS7711C1Z1 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in THE PINNACLE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at THE PINNACLE?

The professionals named in the filing: Architect: Pushpendra Kumar Bharti; Engineer: Iftikar Ahmad Chappu; Chartered Accountant: Kasiraju Venkata Chala Pavan Kumar. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in THE PINNACLE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About THE PINNACLE. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save THE PINNACLE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.