Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Dec 2026Possession promisedno revision filed
11 of 13Construction stages donefurthest along: Electrification, 90%
9 of 32Units unsoldnot recorded sold or booked
0Complaints at RERA Karnatakaon this registration
Jump to the 71 documents Report an error

THE PEARL PARADISE is a Residential/Group Housing project by SRI SAI INFRA PROJECTS in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/230725/007949 on 23 Jul 2025. Possession is promised by 31 Dec 2026. 23 of the 32 units on this registration are recorded sold or booked, and 11 of 13 construction stages are filed complete.

At a glance

Project

  • NameTHE PEARL PARADISE
  • TypeResidential/Group Housing
  • Location
    • Bengaluru East
    • Bengaluru Urban
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1251/446/PR/230725/007949
  • ReraGenie IDRG-KA-52622

Builder

  • NameSRI SAI INFRA PROJECTS
  • Entity typePartnership Firm
  • GSTIN29AFCFS8194J1Z8
  • Authorized SignatoryRAMESH G

Key dates

this monthRegisteredJul 2025PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on23 Jul 2025
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed71 files

Current status

72%23 of 32 units booked
95.0%Of the estimated cost spent so far

Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
THE PEARL PARADISE---32032

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 13 construction stages are filed complete. The stage furthest along is Electrification, at 90%.

Building: 98% average across the applicable activities

ActivityProgress
Earth work and other leveling preparation work100%
Foundation footing work100%
Upto Plinth Level100%
Sub-structure flooring (Parking Floor, more than one floor below general ground level)100%
Retaining wall (All types)Not applicable
RCC or MS Framed structure100%
Masonry Construction100%
Plastering inside , outside & Ceiling100%
Joinery: Doors, Windows, Ventilators etc100%
Basic work of Water supply, Sanitary and Electrification100%
Dadoing, Skirting, Flooring, Tiles work (All types)100%
Railing and Grill fixing100%
Electrification, Water supply and Sanitary Finishing90%
Painting90%
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)Not applicable
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation workNot applicable
Internal and External work including landscapes as per sanctioned drawingsNot applicable

Progress on shared amenities40

As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes90%
Sewage and Drainage SystemYes90%
Water conservation/rain water harvesting/recharge of ground waterYes90%
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Solid waste management and disposalNoNot applicable
Emergency Evacuation servicesNoNot applicable
Internal Roads & FootpathsNoNot applicable
Electricity supply transformer and substationYes90%
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)Yes90%
Parks & Tree plantingYes90%
Street LightingNoNot applicable
ElectricityYes90%
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes0%
Club HouseNoNot applicable
Community HallYes90%
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolYes90%
GymYes90%
ParksNoNot applicable
Power BackupYes90%
Piped GasNoNot applicable
Water and SanitationNoNot applicable
Air ConditioningNoNot applicable
StaircasesYes100%
LiftsYes100%
Corridor/LobbiesYes100%
Fire escapesNoNot applicable
Common entrance and exit for the building/common portico/foyer/verandahNoNot applicable
BasementNoNot applicable
TerraceYes100%
Outer WallNoNot applicable
Open parking areasNoNot applicable
Provision for lodging of management staff and security staffYes100%
Water conservation and renewable energyNoNot applicable
Common storage spacesNoNot applicable

Land and ownership1

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Named landowners1
LandownerVillageDistrict
SAM P PHILIP--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 12.90 cr
Cost incurredRs 12.26 cr
Spent of the estimate95.04%
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 12.90 crRs 12.26 cr

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectTATA VITTALA SRINIVAS
EngineerMANDHADI VENKATARAMANA REDDY
Chartered AccountantJohn peter Narisetty

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed71

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/230725/007949 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form-4 CA.pdf15 Oct 2026
Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Form-5 Architect new.pdf15 Oct 2026
Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: FORM-6 Engineer new.pdf15 Oct 2026
Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form-4 CA Q4.pdf15 Jul 2026
Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Form-5 Architect.pdf15 Jul 2026
Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form-6 Engineer pdf.pdf15 Jul 2026
Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form 4 CA.pdf15 Jul 2026
Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Form 5 Architect.pdf15 Jul 2026
Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form 6 Engineer.pdf15 Jul 2026
Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form4 CA.pdf13 Feb 2026
Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Form5 Architect.pdf13 Feb 2026
Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form6 Engineer.pdf13 Feb 2026
Form -6 Engineer CertificateFile: Form 6 Engineer certificate.pdf20 Jul 2025
Specifications Signed CopyFile: Specifications Signed Copy.pdf20 Jul 2025
Sale AgreementFile: As of The Pearl Paradise -RERA Revised.pdf20 Jul 2025
Allotment LetterFile: Allotment letter The pearl paradise.pdf20 Jul 2025
Cost EstimateFile: Cost estimation RERA.pdf20 Jul 2025
Land costFile: LAND COST calculation.pdf20 Jul 2025
STP DrawingsFile: STP Drawings.pdf20 Jul 2025
Single Plot ClarificationFile: Single Plot Clarification.pdf20 Jul 2025
Building LicenseFile: Panchayat building Licence_compressed.pdf20 Jul 2025
ADLR SketchFile: ADLR Sketch dodda gubbi sy no122-3 sketch.pdf20 Jul 2025
Building PlanFile: Approved BDA plan original.pdf20 Jul 2025
CC LetterFile: CC Letter.pdf20 Jul 2025
Google Map DemarcationFile: Doddagubbi -Google map Demarcation.pdf20 Jul 2025
Village Map DemarcationFile: Village map Demarcation.pdf20 Jul 2025
CDP PlanFile: CDP Plan Demarcation.pdf20 Jul 2025
KSPCB NOCFile: KSPCB NOC - Dodda Gubbi.pdf20 Jul 2025
RTC, survey New No.122/1 Old No.122/3-
Mutation, survey New No.122/1 Old No.122/3-
Encumbrance Certificate, survey New No.122/1 Old No.122/3-
Conversion/Alienation Order, survey New No.122/1 Old No.122/3-
Sale/Title/Gift Deed, survey New No.122/1 Old No.122/3-
JDA, survey New No.122/1 Old No.122/3-
Khatha, survey New No.122/1 Old No.122/3-
Registration CertificateFile: Partnership Registration Certificate.pdf-
GST CertificateFile: GST Certificate-1 SSIP.pdf-
Partnership DeedFile: Partnership deed Sri sai infra.pdf-
Partner Details-
Partner Details-
Partner Details-
Partner Details-
Partner Details-
Partner Details-
Certificate issued by CA Form 1File: Form 1 CA Certificate_compressed.pdf-
Certificate issued by Architect Form 2File: Form 2 Architect certificate.pdf-
Certificate issued by Engineer Form 3File: Form 6 Engineer certificate.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: Non-Litigation Affidavit.pdf-
Balance Sheet 2023 - 2024File: Balance sheet 2023-24.pdf-
Audited Profit and Loss Statement 2023 - 2024File: P&L Financials SSIP 2023-24-4.pdf-
Income Tax Return Acknowledgement 2023 - 2024File: IT Returns SSIP 2023-24.pdf-
CC Letter-
Approved BDA plan original-
Approved BDA plan original-
Strucural saftey Certificate-
Specifications of The Pearl Paradise-
Brocher letter-
As of The Pearl Paradise -RERA,-
Allotment letter The pearl paradise-
Affidavit Form B-
Affidavit-
Affidavit cum declaration-
Legal Search report-
Bescom NOC & receipt-
Water NOC-
KSPCB NOC-
Prospectus/BrochureFile: THE PEARAL PARADISE FINAL BROCHURE 05-08-25_compressed.pdf-
Advertisement Copy 1File: a00a1640-711e-494a-aaff-60bb9910e568.pdf-

How this compares with Bengaluru Urban

72%of this project is bookeddistrict median 51%
34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep THE PEARL PARADISE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

Builder: SRI SAI INFRA PROJECTS

SRI SAI INFRA PROJECTS has 1 registration on RERA Karnataka, including THE PEARL PARADISE. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if THE PEARL PARADISE is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of THE PEARL PARADISE?

The registered promoter entity is SRI SAI INFRA PROJECTS, a partnership firm as per the filing. Its GSTIN 29AFCFS8194J1Z8 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in THE PEARL PARADISE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at THE PEARL PARADISE?

The professionals named in the filing: Architect: TATA VITTALA SRINIVAS; Engineer: MANDHADI VENKATARAMANA REDDY; Chartered Accountant: John peter Narisetty. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in THE PEARL PARADISE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About THE PEARL PARADISE. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save THE PEARL PARADISE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.