- 10 complaints at RERA Karnataka
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
Saved.
THE NASHVILLE is a Residential/Group Housing project by M/S. EAST NORTH VVS REALTY in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/308/PR/100522/004863 on 10 May 2022. Possession is promised by 11 Mar 2024. 10 complaints are on record with the regulator.
At a glance
Project
- NameTHE NASHVILLE
- TypeResidential/Group Housing
- Location
- Anekal
- Bengaluru Urban
- PincodeNot stated
- RERA no.PRM/KA/RERA/1251/308/PR/100522/004863
- ReraGenie IDRG-KA-58460
Builder
- NameM/S. EAST NORTH VVS REALTY
- Entity typePartnership Firm
- GSTIN29ABGFE5994D1Z3
- Authorized SignatoryVINAY P A
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on10 May 2022
- Promised completion11 Mar 2024
- Revised completionNone
- Buildings2 building records
- Documents filed92 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| 2 BHK Apartment | - | - | - | 54 | 0 | 54 |
| 3 BHK Duplex | - | - | - | 34 | 0 | 34 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 6 May 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
Building:
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | - |
| Foundation footing work | - |
| Upto Plinth Level | - |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | - |
| Retaining wall (All types) | Not applicable |
| RCC or MS Framed structure | - |
| Masonry Construction | - |
| Plastering inside , outside & Ceiling | - |
| Joinery: Doors, Windows, Ventilators etc | - |
| Basic work of Water supply, Sanitary and Electrification | - |
| Dadoing, Skirting, Flooring, Tiles work (All types) | - |
| Railing and Grill fixing | - |
| Electrification, Water supply and Sanitary Finishing | - |
| Painting | - |
| Fire prevention and fire fighting fitting and fixture with network | - |
| Weather Proof work(tile,concrete) | - |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | - |
| Internal and External work including landscapes as per sanctioned drawings | Not applicable |
Progress on shared amenities40
As on 6 May 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | - |
| Sewage and Drainage System | Yes | - |
| Water conservation/rain water harvesting/recharge of ground water | Yes | - |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | Yes | - |
| Solid waste management and disposal | Yes | - |
| Emergency Evacuation services | Yes | - |
| Internal Roads & Footpaths | Yes | - |
| Electricity supply transformer and substation | Yes | - |
| Storm water drains | Yes | - |
| Use of renewable energy | No | Not applicable |
| Sewage Treatment Plant (STP) | Yes | - |
| Parks & Tree planting | Yes | - |
| Street Lighting | Yes | - |
| Electricity | Yes | - |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | No | Not applicable |
| Club House | Yes | - |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | No | Not applicable |
| Swimming Pool | Yes | - |
| Gym | Yes | - |
| Parks | No | Not applicable |
| Power Backup | Yes | - |
| Piped Gas | No | Not applicable |
| Water and Sanitation | Yes | - |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | - |
| Lifts | Yes | - |
| Corridor/Lobbies | Yes | - |
| Fire escapes | Yes | - |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | - |
| Basement | Yes | - |
| Terrace | Yes | - |
| Outer Wall | No | Not applicable |
| Open parking areas | No | Not applicable |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | Yes | - |
| Common storage spaces | No | Not applicable |
Land and ownership1
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| EAST NORTH VVS REALTY | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 17.00 cr | - |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Jagadhish M |
| Engineer | Chandrashekar S |
| Chartered Accountant | Mallaiah B |
Complaints filed with RERA Karnataka10
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CMP/220711/0009739 | - | M/S. EAST NORTH VVS REALTY | 11/07/2022 |
| CMP/220714/0009749 | - | M/S. EAST NORTH VVS REALTY | 14/07/2022 |
| CMP/220714/0009751 | - | M/S. EAST NORTH VVS REALTY | 14/07/2022 |
| CMP/220725/0009798 | - | M/S. EAST NORTH VVS REALTY | 25/07/2022 |
| 01775/2023 | - | M/S. EAST NORTH VVS REALTY | 01/12/2023 |
| 01776/2023 | - | M/S. EAST NORTH VVS REALTY | 01/12/2023 |
| 01779/2023 | - | M/S. EAST NORTH VVS REALTY | 01/12/2023 |
| 01780/2023 | - | M/S. EAST NORTH VVS REALTY | 01/12/2023 |
| 00759/2025 | - | M/S. EAST NORTH VVS REALTY | 20/05/2025 |
| 00110/2026 | - | M/S. EAST NORTH VVS REALTY | 11/02/2026 |
Documents filed92
As listed on the registration, under the names the promoter filed them with; the newest 80 of 92 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/308/PR/100522/004863 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| AOSFile: Proforma AOS.pdf | 6 May 2022 |
| KHATA of the Sy 36/3 Project LandFile: 1_1_Katha_Project Land.pdf | 29 Apr 2022 |
| Partnership Deed Cum LandownersFile: 1_Partnership Deed cum Land Owners.pdf | 29 Apr 2022 |
| Relinquishment DeedFile: 2_1_Reliquesment Deed.pdf | 29 Apr 2022 |
| Layout sanction Order & Site PlanFile: 2_2_Single Site Plan & Sanction Order.pdf | 29 Apr 2022 |
| Commencement certificateFile: 2_3_Commencement Certificate.pdf | 29 Apr 2022 |
| change of land use Cum Conversion OrderFile: 2_4_Change of land use & Conversion Order.pdf | 29 Apr 2022 |
| Location and Demarcation DrawingFile: 2_5_Location & Demarcation Drawing.pdf | 29 Apr 2022 |
| Building LicenseFile: 2_6_Building License.pdf | 29 Apr 2022 |
| Original KSPCB NOC.File: 2_7_KSPCB NOC.pdf | 29 Apr 2022 |
| Engineer certificateFile: 3_2_ENGINEER'S CERTIFICATE.pdf | 29 Apr 2022 |
| Proforma Agreement of Sale (AOS) notified by GOKFile: 3_3_Proforma Agreement of Sale as per GOK_THE NASH VILLE.pdf | 29 Apr 2022 |
| Valid original copy of NOC issued by BESCOM & Fee ReceiptsFile: 3_4_1_BESCOM_NOC & Reciept.pdf | 29 Apr 2022 |
| original copy of BWSSB NOCFile: 3_4_Water Supply_NOC Letter_Project.pdf | 29 Apr 2022 |
| Signed copy of project specificationFile: 2_7_Project Specification.pdf | 29 Apr 2022 |
| NOC issued by Fire force_Declearation_NAFile: 3_5_Fire Force NOC_Declearation_NA.pdf | 29 Apr 2022 |
| Highlighted STP demarcated SiteFile: 3_6_Nash Ville_Site Plan_STP.pdf | 29 Apr 2022 |
| SR Land value Notification from Sub RegistarFile: 9_SR Land Value_Sub Register.pdf | 29 Apr 2022 |
| RTC, survey 36/3 | - |
| Mutation, survey 36/3 | - |
| Encumbrance Certificate, survey 36/3 | - |
| Sale/Title/Gift Deed, survey 36/3 | - |
| Khatha, survey 36/3 | - |
| Registration CertificateFile: PARTNERSHIP CERTIFICATE.pdf | - |
| Partnership DeedFile: Partnership Deed cum Land Owners.pdf | - |
| Partner Details | - |
| Partner Details | - |
| Certificate issued by Engineer Form 3File: 3_2_ENGINEER'S CERTIFICATE.pdf | - |
| Project Chartered Accountant | - |
| Project Engineer | - |
| Project Architect | - |
| AffidavitFile: Affidivat_Non Litigation.pdf | - |
| Balance Sheet 2020 - 2021File: Balance sheet 21-22.pdf | - |
| Balance Sheet 2019 - 2020File: Balance sheet 20-21.pdf | - |
| Balance Sheet 2018 - 2019File: Balance Sheet_19-20.pdf | - |
| Audited Profit and Loss Statement 2020 - 2021File: PL Statement 21-22.pdf | - |
| Audited Profit and Loss Statement 2019 - 2020File: PL Statement 20-21.pdf | - |
| Audited Profit and Loss Statement 2018 - 2019File: PL Statement_19-20.pdf | - |
| Director's Report 2020 - 2021File: ITR 21-22.pdf | - |
| Director's Report 2019 - 2020File: ITR 20-21.pdf | - |
| Director's Report 2018 - 2019File: ITR 19-20.pdf | - |
| Cash Flow Statement 2020 - 2021File: Statement 21-22.pdf | - |
| Cash Flow Statement 2019 - 2020File: Cash Flow Statement 20-21.pdf | - |
| Auditor's Report 2020 - 2021File: ITR 21-22.pdf | - |
| Auditor's Report 2019 - 2020File: ITR 20-21.pdf | - |
| Auditor's Report 2018 - 2019File: ITR 19-20.pdf | - |
| Income Tax Return Acknowledgement 2020 - 2021File: ITR Acknowledgement 21-22.pdf | - |
| Income Tax Return Acknowledgement 2019 - 2020File: ITR Acknowledgement 20-21.pdf | - |
| Income Tax Return Acknowledgement 2018 - 2019File: ITR Acknowledgement_19-20.pdf | - |
| COMMENCEMENT CERTIFICATE | - |
| Bescom_Service | - |
| NOC_Bescom & BWSSB Declearation | - |
| Single Site Plan_Sy 36_3 | - |
| Approved Plan_Slit & Ground Floor | - |
| Approved Plan_1st & 2nd Floor | - |
| Approved Plan_Site & Section Plan | - |
| Approved Plan_Site & Section Plan | - |
| COMMENCEMENT CERTIFICATE | - |
| Approved Plan_3rd & Tarraces | - |
| COMMENCEMENT CERTIFICATE | - |
| Partnership Deed cum Land Owners | - |
| Conversation Certificate | - |
| Conversation Certificate | - |
| Conversation Certificate | - |
| Proforma Agreement of Sale_As Per GOK | - |
| Performa of Allotment Letter | - |
| Broucher | - |
| Affidivat_Form B | - |
| Affidivat_Sec3 | - |
| JD_Declearation | - |
| Bescom_Service | - |
| NOC_Bescom & BWSSB Declearation | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| KSPCB_NOC | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep THE NASHVILLE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Prestige Park Grove
PRESTIGE PROJECTS PRIVATE LIMITED
Prestige Lakeside Habitat
Prestige Habitat Ventures
LivingTree by Kalyani Developers
Kalyani Tech Park Private Limited
PRESTIGE FALCON CITY
PRESTIGE NOTTINGHILL INVESTMENTS
SATTVA CITY
SATTVA CITY PRIVATE LIMITED
GM AMBITIOUS ENCLAVE
M/s. Allam Infinite India Private Limited
See every Bengaluru Urban project, with the district possession charts
Builder: M/S. EAST NORTH VVS REALTY
M/S. EAST NORTH VVS REALTY has 1 registration on RERA Karnataka, including THE NASHVILLE. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if THE NASHVILLE is delayed beyond 11 Mar 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of THE NASHVILLE?
The registered promoter entity is M/S. EAST NORTH VVS REALTY, a partnership firm as per the filing. Its GSTIN 29ABGFE5994D1Z3 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in THE NASHVILLE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against THE NASHVILLE?
Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
Who certifies construction progress at THE NASHVILLE?
The professionals named in the filing: Architect: Jagadhish M; Engineer: Chandrashekar S; Chartered Accountant: Mallaiah B. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in THE NASHVILLE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback