Registration approved Mixed Development project

The Marquee

By SUSHANT

RG-KA-33011 · RERA PRM/KA/RERA/1251/309/PR/180605/001874

Source: official RERA Karnataka filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No complaints on record
  • Separate project account declared
Sep 2019Possession promisedmoved 12 months from the original
0Complaints at RERA Karnatakaon this registration
Jump to the 59 documents Report an error

The Marquee is a Mixed Development project by SUSHANT in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/309/PR/180605/001874 on 5 Jun 2018. Possession is promised by 29 Sep 2019. The completion date has moved by 12 months from the original filing.

At a glance

Project

  • NameThe Marquee
  • TypeMixed Development
  • Location
    • Bengaluru North
    • Bengaluru Urban
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1251/309/PR/180605/001874
  • ReraGenie IDRG-KA-33011

Builder

  • NameSUSHANT

Key dates

this monthRegisteredJun 2018First promiseSep 2018Revised toSep 2019

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on5 Jun 2018
  • Promised completion29 Sep 2019
  • Revised completionRevised to 29 Sep 2019 (originally 30 Sep 2018)
  • Buildings1 building record
  • Documents filed59 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
THE MARQUEE-----6

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)-
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsNoNot applicable
Sewage and Drainage SystemYes-
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
Provision for community buildings and for treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalYes-
Water conservationNoNot applicable
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesNoNot applicable
Electricity supply transformer and substationYes-
Emergency Evacuation servicesNoNot applicable
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterNoNot applicable
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupYes-
GasNoNot applicable
Water and SanitationNoNot applicable
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesNoNot applicable
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area648 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 5.00 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectIndraneel Dutta
EngineerRajesh Consultants

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EX/PRM/KA/RERA/1251/309/PR/200117/001874Sep 2018 → Sep 2019

Reason as filed by the promoterDelay in Approvals

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed59

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/309/PR/180605/001874 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect Certificate for Work Completion Schedule till DateFile: Architect certificate for status of work as on date project extension.pdf-
Engineer Certificate for Work Completion Schedule till DateFile: Engr Certificate Status of Work.PDF-
CA Certificate for Funds UtilizationFile: CA Fund Utilization Certificate.PDF-
Architect Certificate for Pending Work Completion Schedule.File: Architect certificate for pending work as on date project extension.pdf-
Engineer Certificate for Pending Work Completion Schedule.File: Engr Certificate Pending Work.PDF-
CA Certificate for Funds required for Project CompletionFile: CA certificate for Funds Required.PDF-
AffidavitFile: Affidavit R.pdf-
Latest Encumbrance CertificateFile: EC-VMR.PDF-
Details Of Sold/ Un-sold UnitsFile: SoldUnsoldDetails.xlsx-
Document 1File: TransactionSummary_110719045735_(1).pdf-
Document 2File: extension affidavit.PDF-
Document 3File: Affidavit R.pdf-
Document 4File: new doc 2020-01-02 20.42.12_20200102204230.pdf-
Commencement Certificate-
vmr-a-floor plans GROUND 21 Mar 2018-
Plan Sanction Scan -
Agreement_for_Sale_of_RERA-
Agreement_for_Sale_of_RERA-
Indenture of sale-
Plan Sanction Scan -
Plan Sanction Scan -
Agreement_for_Sale_of_RERA-
vmr_Option_003_016 (2)-
Specifications for Commercial RERA-
EC-VMR-
Khata-
Khata-
Memorandum of partition-
Plan Sanction Scan -
Plan Sanction Scan -
Building permit-
Balance Sheet 2016 - 2017File: TO WHOMSOEVER IT IS CONCERN.pdf-
Balance Sheet 2015 - 2016File: TO WHOMSOEVER IT IS CONCERN.pdf-
Balance Sheet 2014 - 2015File: TO WHOMSOEVER IT IS CONCERN.pdf-
Audited Profit and Loss Statement 2016 - 2017File: TO WHOMSOEVER IT IS CONCERN.pdf-
Audited Profit and Loss Statement 2015 - 2016File: TO WHOMSOEVER IT IS CONCERN.pdf-
Audited Profit and Loss Statement 2014 - 2015File: TO WHOMSOEVER IT IS CONCERN.pdf-
Director's Report 2016 - 2017File: TO WHOMSOEVER IT IS CONCERN.pdf-
Director's Report 2015 - 2016File: TO WHOMSOEVER IT IS CONCERN.pdf-
Director's Report 2014 - 2015File: TO WHOMSOEVER IT IS CONCERN.pdf-
Cash Flow Statement 2016 - 2017File: TO WHOMSOEVER IT IS CONCERN.pdf-
Cash Flow Statement 2015 - 2016File: TO WHOMSOEVER IT IS CONCERN.pdf-
Auditor's Report 2016 - 2017File: TO WHOMSOEVER IT IS CONCERN.pdf-
Auditor's Report 2015 - 2016File: TO WHOMSOEVER IT IS CONCERN.pdf-
Auditor's Report 2014 - 2015File: TO WHOMSOEVER IT IS CONCERN.pdf-
Income Tax Return Acknowledgement 2016 - 2017File: Sushanth Gupta ITR V FY 2015-16.pdf-
Income Tax Return Acknowledgement 2015 - 2016File: SUSHANT GUPTA_ ITR V 14-15.pdf-
Income Tax Return Acknowledgement 2014 - 2015File: SUSHANT GUPTA ITR V FY 2013-14.pdf-
Agreement-
Tower Excel SheetFile: PRM_KA_RERA_1251_309_PR_180605_001874.xlsx-
Occupancy CertificateFile: Occupancy Certificate.pdf-
Consent for operation issued by KSPCBFile: KSPCB NOC.PDF-
Details of external infrastructure work such as drive way, play area, park, STP and water treatment plant, WheFile: EC.PDF-
Architect certificate for having completed the work(in format no 5)File: AC.PDF-
Chartered Accountant certificate for having completed the work(in format no 4)File: CA.PDF-
BWSSB NOCFile: BWSSB NOC.PDF-
KSPCB NOCFile: KSPCB NOC.PDF-
OCCUPANCY CERTIFICATEFile: Occupancy Certificate.pdf-
PLAN SACTION COPYFile: Plan Sanction Sca.pdf-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one moved by 12 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep The Marquee on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

Builder: SUSHANT

SUSHANT has 1 registration on RERA Karnataka, including The Marquee. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if The Marquee is delayed beyond 29 Sep 2019?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of The Marquee?

The registered promoter entity is SUSHANT. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in The Marquee?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at The Marquee?

The professionals named in the filing: Architect: Indraneel Dutta; Engineer: Rajesh Consultants. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in The Marquee?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About The Marquee. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save The Marquee to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.