Registration approved No litigation declared Residential/Group Housing project

The lake Terraces

By KEYA HOMES INFRA LLP

RG-KA-10902 · RERA PRM/KA/RERA/1251/308/PR/170824/006975 · Last updated on RERA Karnataka portal: 26 May 2026

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Sep 2026Possession promisedno revision filed
17 of 17Construction stages doneevery applicable stage filed complete
214 of 409Units unsoldnot recorded sold or booked
0Complaints at RERA Karnatakaon this registration
Jump to the 189 documents Report an error

The lake Terraces is a Residential/Group Housing project by KEYA HOMES INFRA LLP in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/308/PR/170824/006975 on 17 Aug 2024. Possession is promised by 30 Sep 2026. 195 of the 409 units on this registration are recorded sold or booked, and 17 of 17 construction stages are filed complete.

At a glance

Project

  • NameThe lake Terraces
  • TypeResidential/Group Housing
  • Location
    • Anekal
    • Bengaluru Urban
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1251/308/PR/170824/006975
  • ReraGenie IDRG-KA-10902

Builder

  • NameKEYA HOMES INFRA LLP
  • Entity typePartnership Firm
  • LLPINAAQ-4307
  • GSTIN29AAVFK3908N1ZF
  • Authorized SignatoryDinesh Kejriwal

Key dates

this monthRegisteredAug 2024PromisedSep 2026

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on17 Aug 2024
  • Promised completion30 Sep 2026
  • Revised completionNone
  • Buildings2 building records
  • Documents filed189 files

Current status

48%195 of 409 units booked
101.7%Of the estimated cost spent so far

Figures as on 26 May 2026, this project's latest RERA Karnataka filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower A---1870187
Tower B---2220222

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 26 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

17 of 17 construction stages are filed complete.

Building: 100% average across the applicable activities

ActivityProgress
Earth work and other leveling preparation work100%
Foundation footing work100%
Upto Plinth Level100%
Sub-structure flooring (Parking Floor, more than one floor below general ground level)100%
Retaining wall (All types)100%
RCC or MS Framed structure100%
Masonry Construction100%
Plastering inside , outside & Ceiling100%
Joinery: Doors, Windows, Ventilators etc100%
Basic work of Water supply, Sanitary and Electrification100%
Dadoing, Skirting, Flooring, Tiles work (All types)100%
Railing and Grill fixing100%
Electrification, Water supply and Sanitary Finishing100%
Painting100%
Fire prevention and fire fighting fitting and fixture with network100%
Weather Proof work(tile,concrete)100%
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation workNot applicable
Internal and External work including landscapes as per sanctioned drawings100%

Progress on shared amenities40

As on 26 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes100%
Sewage and Drainage SystemYes100%
Water conservation/rain water harvesting/recharge of ground waterYes100%
Energy managementYes100%
Fire protection and fire safety requirementsYes100%
Solid waste management and disposalYes100%
Emergency Evacuation servicesYes100%
Internal Roads & FootpathsYes90%
Electricity supply transformer and substationYes90%
Storm water drainsYes100%
Use of renewable energyYes100%
Sewage Treatment Plant (STP)Yes100%
Parks & Tree plantingYes90%
Street LightingYes90%
ElectricityYes100%
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
Club HouseYes100%
Community HallYes100%
Outdoor Sports facilityYes100%
Indoor Sports facilityYes100%
Swimming PoolYes100%
GymYes100%
ParksNoNot applicable
Power BackupYes90%
Piped GasNoNot applicable
Water and SanitationYes100%
Air ConditioningNoNot applicable
StaircasesYes100%
LiftsYes100%
Corridor/LobbiesYes100%
Fire escapesYes100%
Common entrance and exit for the building/common portico/foyer/verandahYes100%
BasementYes100%
TerraceNoNot applicable
Outer WallNoNot applicable
Open parking areasNoNot applicable
Provision for lodging of management staff and security staffYes100%
Water conservation and renewable energyYes100%
Common storage spacesNoNot applicable

Land and ownership9

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Named landowners9
LandownerVillageDistrict
Sajjan Raj Sethia--
Sajjan Raj Sethia--
Sudhir Sethiya--
Sajjan Raj Sethiya--
Vijay Raj Jain--
Sajjan Raj Sethiya--
Sajjan raj Sethiya--
Sajjan RAj Sethiua--
Sajjan RAj Sethiya--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 144.93 cr
Cost incurredRs 147.35 cr
Spent of the estimate101.67%
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 120.75 crRs 123.05 cr
TDR costRs 8.42 crRs 8.42 cr
ApprovalsRs 3.66 crRs 3.55 cr
On-site expenditure-Site OverheadRs 3.60 crRs 3.67 cr
On-site expenditure-Salaries of workersRs 3.00 crRs 3.06 cr
On-site expenditure-Cost Of Services(Water, Electricity, Sewage)Rs 3.00 crRs 3.06 cr
On-site expenditure-Consultants FeesRs 2.50 crRs 2.55 cr

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectUrban Frame Private Limited
EngineerH P Yogesh
Chartered AccountantK V N & Associates

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed189

As listed on the registration, under the names the promoter filed them with; the newest 80 of 189 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/308/PR/170824/006975 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: TLT-25-26-Q4.pdf26 May 2026
Q4 2025-26 Form-5 Certificate issued by ArchitectFile: TLT Q4 (1).pdf26 May 2026
Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: MISC 260308 KEYA LAKE TERRACES.pdf26 May 2026
Q4 2025-26 Water supply and sewage board26 May 2026
Q4 2025-26 KPTCL- BESCOM26 May 2026
Q4 2025-26 Fire and Safety26 May 2026
Q4 2025-26 Airport Authority of India26 May 2026
Q4 2025-26 BSNL/Telecommunication Department26 May 2026
Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: TLT-25-26-Q3.pdf31 Mar 2026
Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Q3.pdf31 Mar 2026
Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: MISC 251209 Keya Homes Infra LLP .pdf31 Mar 2026
Q3 2025-26 Water supply and sewage board31 Mar 2026
Q3 2025-26 KPTCL- BESCOM31 Mar 2026
Q3 2025-26 Fire and Safety31 Mar 2026
Q3 2025-26 Airport Authority of India31 Mar 2026
Q3 2025-26 BSNL/Telecommunication Department31 Mar 2026
Project Progress and net worth certificateFile: A 116 2.pdf12 Aug 2024
Balance Sheet - 22-23File: A 60 2223.pdf12 Aug 2024
P & L A/C for 22-23File: A 61 2223.pdf12 Aug 2024
Rs. 108 cr FD certificate issued by bank as on 31 March 2024File: Scan_0001.pdf12 Aug 2024
Attached work progress and CA certificate for net worth and FD in bankFile: A 116 2.pdf2 Aug 2024
EC for SNO 16/2 from 23/9/2022 till dateFile: A 1 .pdf24 May 2024
latest katha extract issued by gram panchayat in favour of land owner for the plots formed in the prFile: A 2.pdf24 May 2024
notarized affidavit regarding all pending or cleared litigations /non-litigation by clearly mentioniFile: A 3.pdf24 May 2024
advocate search reportFile: A 4.pdf24 May 2024
authenticated copy of EC obtained from sub- registrar for sno 16/18 from 1/4/2009 to dateFile: A 5 .pdf24 May 2024
Upload Single plot layoutFile: A 6 .pdf24 May 2024
Upload demarcation CDP map showing the proposed siteFile: A 8.jpg24 May 2024
Upload commencement certificateFile: A 10.pdf24 May 2024
Area/no of units of SEIAA. not matching with sanction planFile: A 11.pdf24 May 2024
Upload ZR copyFile: A 13.pdf24 May 2024
The updated Amenities and Coomon area details are incorrect and not tally with the sanctioned drawinFile: A 15.pdf24 May 2024
Since the project is ongoing, Please upload the Form-6,Engineer certificate in the prescribed formatFile: A 18.pdf24 May 2024
Please update the Annexure-A and upload the proforma of the Allotment letter in the prescribed formaFile: A 19.pdf24 May 2024
Please upload the self-attested copy of the BESCOM NOC and BWSSB NOC along with the copy of the feeFile: A 20.pdf24 May 2024
The source of water supply mentioned as bore well, please upload the permission letter issued by theFile: A 21.pdf24 May 2024
1. Upload Chartered accountant details properly with his KYC and Membership certificate with self-atFile: A 51.pdf30 Apr 2024
1. Upload Chartered accountant details properly with his KYC and Membership certificate with self-atFile: A 52.pdf30 Apr 2024
2. Upload passbook/ pass sheets of 100%, 70% & 30% account details, the bank account name should beFile: A 113.pdf30 Apr 2024
2. Upload passbook/ pass sheets of 100%, 70% & 30% account details, the bank account name should beFile: Docs 4.pdf30 Apr 2024
3. Upload the bank affidavit in the prescribed format.File: A 113 A.pdf30 Apr 2024
4. Upload profit and loss account and balance sheet 2020-21, 2021-22 & 2022-23 with CA UDIN along wiFile: A 4.pdf30 Apr 2024
4. Upload profit and loss account and balance sheet 2020-21, 2021-22 & 2022-23 with CA UDIN along wiFile: A 4A.pdf30 Apr 2024
6. What are all the sources of funds to complete the project? With supporting documents.File: Docs 5.pdf30 Apr 2024
6. What are all the sources of funds to complete the project? With supporting documents.File: A 116.pdf30 Apr 2024
7. Bank account details and borrowing details are not mentioned in the CA certificate.File: A 57.pdf30 Apr 2024
13)Upload all sanctioned drawings floor plan, sectional drawings and elevations.File: Copy of A-101 Ground Floor plan.pdf30 Apr 2024
13)Upload all sanctioned drawings floor plan, sectional drawings and elevations.File: Copy of A-101 Site Plan.pdf30 Apr 2024
13)Upload all sanctioned drawings floor plan, sectional drawings and elevations.File: Copy of A-104 Basement 1.pdf30 Apr 2024
13)Upload all sanctioned drawings floor plan, sectional drawings and elevations.File: Copy of A-104 Basement 2.pdf30 Apr 2024
13)Upload all sanctioned drawings floor plan, sectional drawings and elevations.File: Copy of A-104 Basement 3.pdf30 Apr 2024
13)Upload all sanctioned drawings floor plan, sectional drawings and elevations.File: Copy of A-106 First Floor Plan.pdf30 Apr 2024
13)Upload all sanctioned drawings floor plan, sectional drawings and elevations.File: Copy of A-107 Second Floor Plan.pdf30 Apr 2024
13)Upload all sanctioned drawings floor plan, sectional drawings and elevations.File: Copy of A-108 Typical Odd Floor Plan.pdf30 Apr 2024
13)Upload all sanctioned drawings floor plan, sectional drawings and elevations.File: Copy of A-109 Typical Even Floor Plan.pdf30 Apr 2024
13)Upload all sanctioned drawings floor plan, sectional drawings and elevations.File: Copy of A-110 19th Floor North And South Tower.pdf30 Apr 2024
13)Upload all sanctioned drawings floor plan, sectional drawings and elevations.File: Copy of A-111 20th Floor North and South Tower.pdf30 Apr 2024
13)Upload all sanctioned drawings floor plan, sectional drawings and elevations.File: Copy of A-117 South Tower Section S1.pdf30 Apr 2024
13)Upload all sanctioned drawings floor plan, sectional drawings and elevations.File: Copy of A-118 South Tower Elevation E1.pdf30 Apr 2024
13)Upload all sanctioned drawings floor plan, sectional drawings and elevations.File: Copy of A-118a North Tower Elevation E1.pdf30 Apr 2024
2) Please update the Amenities and Common area details properly on the project detail page and uploaFile: A 26.pdf30 Apr 2024
3) Please upload the latest dated self attested copy of Engineer license certificate, and accordinglFile: A 27.pdf30 Apr 2024
5) Please upload the Engineer certificate in the prescribed format.File: A 29.pdf30 Apr 2024
9) Please mention the project name and project address and upload the project section 3(1) notarizedFile: A 33.pdf30 Apr 2024
12) Please upload the STP design drawing certified by the Engineer as per the guidelines of KSPCB NOFile: A 36.pdf30 Apr 2024
13) Please upload the Land cost calculation sheet as per the guidance value(Self-attested copy).File: Docs.pdf30 Apr 2024
14) Please clarify the source of water supply to the project along with the supporting documents andFile: Docs 2.pdf30 Apr 2024
10) Please upload the proforma of the Allotment letter in the prescribed format.File: Allotment letter (1).pdf30 Apr 2024
14) Please clarify the source of water supply to the project along with the supporting documents andFile: Borewell.jpeg30 Apr 2024
2)Upload Single plot layout.File: KM_225i_00258 (1).pdf30 Apr 2024
5)Upload demarcation CDP map showing the proposed site.File: CDP MAP.jpg30 Apr 2024
8) Please upload the project specification by incorporating the project Name and Project Address cerFile: Specs.pdf30 Apr 2024
4)Upload certified carpet area calculation.File: Carpet area.pdf30 Apr 2024
6)Upload demarcation village map showing the proposed site.File: Village Map Gollahalli (1).pdf30 Apr 2024
10)notarized affidavit regarding all pending or cleared litigations /non-litigation by clearly mentFile: Affidavit cum Declaration, TLT.pdf30 Apr 2024
11) advocate search reportFile: C D TLT 12.pdf30 Apr 2024
2) conversion order for sno 16/2 measuring 0-14 g, 16/1 measuring 0-12 GFile: A 11-2 .pdf30 Apr 2024
) katha extract issued by gram panchayat in favour of land owner for the plots formed in the projectFile: A 11-4.pdf30 Apr 2024
8)Area/no of units of KSPCB CFE. not matching with sanction planFile: Docs 3.pdf30 Apr 2024
11) Upload TDR certificateFile: A 22.pdf30 Apr 2024

How this compares with Bengaluru Urban

48%of this project is bookeddistrict median 51%
34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep The lake Terraces on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

Builder: KEYA HOMES INFRA LLP

KEYA HOMES INFRA LLP has 1 registration on RERA Karnataka, including The lake Terraces. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if The lake Terraces is delayed beyond 30 Sep 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of The lake Terraces?

The registered promoter entity is KEYA HOMES INFRA LLP, a partnership firm as per the filing. Its LLPIN AAQ-4307 and GSTIN 29AAVFK3908N1ZF can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in The lake Terraces?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at The lake Terraces?

The professionals named in the filing: Architect: Urban Frame Private Limited; Engineer: H P Yogesh; Chartered Accountant: K V N & Associates. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in The lake Terraces?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About The lake Terraces. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save The lake Terraces to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.