ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / THE GHATKOPAR SHITAL DHAM COOP HSG. SOCIETY LTD.

Completed No litigation declared Residential / Group Housing project

THE GHATKOPAR SHITAL DHAM COOP HSG. SOCIETY LTD.

By THE GHATKOPAR SHITAL DHAM COOP. HSG. SOCIETY LTD.

RG-MH-30555 · RERA P51800030897 · Last updated on MahaRERA portal: 17 Oct 2024

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2024Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 54 documents Report an error

THE GHATKOPAR SHITAL DHAM COOP HSG. SOCIETY LTD. is a Residential / Group Housing project by THE GHATKOPAR SHITAL DHAM COOP. HSG. SOCIETY LTD. in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800030897 on 29 Sep 2021. The registration is recorded completed; possession was promised by 31 Dec 2024.

At a glance

Project

  • NameTHE GHATKOPAR SHITAL DHAM COOP HSG. SOCIETY LTD.
  • TypeResidential / Group Housing
  • Location
    • BARISTAR NATH ROAD
    • GARODIA NAGAR
    • Kurla
    • Mumbai Suburban
    • 400077
  • Pincode400077
  • RERA no.P51800030897
  • ReraGenie IDRG-MH-30555

Builder

  • NameTHE GHATKOPAR SHITAL DHAM COOP. HSG. SOCIETY LTD.
  • Entity typeSociety
  • SecretoryGURDIP SINGH JOGINDER SINGH BHATTI

Key dates

this monthRegisteredSep 2021PromisedDec 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on29 Sep 2021
  • Promised completion31 Dec 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed54 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHITAL DHAMNA100000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 17 Oct 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

SHITAL DHAM: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities16

As on 17 Oct 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%
OTHERS SOCIETY OFFICE GYM COMMUNITY HALLYes100%

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area620 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI1704.74
Proposed, not sanctioned1,263 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGARODIA NAGAR MUMBAI 0397 BRANCH GHATKOPAR EAST PIN 400077

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKUNJ RAMBHIA ARCHITECTS
EngineerAgami Engineering
Chartered AccountantV DOSHI & ASSOCIATES
PartnerRole in project
THE GHATKOPAR SHITAL DHAM COOP. HSG. SOCIETY LTD.-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Aug 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 Sep 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Aug 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 22 Sep 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 27 Oct 2023

Documents filed54

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: RERA Form 5.pdf17 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 9 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 10 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf20 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA CERTIFICATE UPDATE UPTO 31-12-2023 (1).pdf20 Jan 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 2371014_OC_signed.pdf27 Oct 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: Registered Reconveyance.pdf27 Oct 2023
Status of ConveyanceFile: Registered Reconveyance.pdf27 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Form 1 Shital Dham 06-10-2023.pdf20 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Form 2 Shital Dham 07-10-2023.pdf20 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA FORM 3 30-09-2023.pdf20 Oct 2023
Architect’s Certificate on Completion of Project (Form 4)File: Architect Form 4 Shital Dham 10-10-2023.pdf20 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 22-23.pdf27 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Form 1 Shital Dham 06-07-2023.pdf19 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Form 2 Shital Dham 06-07-2023.pdf19 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Final Shital Dham.pdf19 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Form 1 Shital Dham 01-04-2023.pdf7 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Form 2 Shital Dham 03-04-2023.pdf7 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA CERTIFICATE UPDATED 31-03-2023 (1).pdf7 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: form 5.pdf10 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Form 2 Shital Dham 06-01-2023.pdf7 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Form 2 Shital Dham 06-01-2023.pdf7 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA CERTIFICATE UPDATED TILL 31-12-2022_compressed.pdf7 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Form 1 Shital Dham 06-10-2022.pdf7 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Form 2 Shital Dham 06-10-2022.pdf7 Oct 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA REPORT FOR THE QUARTER ENDING 30-09-2022.pdf7 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Form 1 Shital Dham 05-07-2022.pdf7 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Form 2 Shital Dham 07-07-2022.pdf7 Jul 2022
Disclosure of sold/ booked inventoryFile: Inventory List _ Shital Dham.pdf7 Jul 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SHITAL DHAM Form 3JUNE 2022_compressed.pdf7 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Form 1 Shital Dham 05-04-2022.pdf6 Apr 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer form 2 Shital Dham 05-04-2022.pdf6 Apr 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SLodhaCo_Form - 3_FIN.pdf6 Apr 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Form 1 Shital Dham 04-01-2022.pdf5 Jan 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Form 2 Shital Dham 05-01-2022.pdf5 Jan 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: copy form 3 31 dec 2021_compressed.pdf5 Jan 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: KUNJ- FORM 1 Architect Certificate 06102021.pdf6 Oct 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SHITAL DHAM form 2 Engineer Certificatre Rera 06-10-21.pdf6 Oct 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM3_compressed.pdf6 Oct 2021
Layout approvalFile: 5948 DRAWING issue_compressed (1)-compressed.pdf22 Sep 2021
Details of encumbrancesFile: self declaration regarding encumbrances.pdf22 Sep 2021
Copy of Layout Approval (in case of layout)File: 5948 DRAWING issue_compressed (1)-compressed.pdf22 Sep 2021
Commencement Certificates / NA Order for plotted developmentFile: SHITAL DHAM CC.pdf22 Sep 2021
Declaration about Commencement CertificateFile: declaration of CC - Format D.pdf22 Sep 2021
Declaration in FORM BFile: Form B - Affidavit cum declaration_compressed.pdf22 Sep 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form -3 CA certificate_compressed.pdf22 Sep 2021
Proforma of Allotment letterFile: AGREEMENT.pdf22 Sep 2021
Layout approvalFile: SHITAL DHAM ISSUED IOD DRAWING.pdf27 Aug 2021
Building plan approvalFile: 2285901Amendletter_signed.pdf27 Aug 2021
Copy of Layout Approval (in case of layout)File: SHITAL DHAM ISSUED IOD DRAWING.pdf27 Aug 2021
Building Plan Approval / NA Order for plotted developmentFile: 2285901Amendletter_signed.pdf27 Aug 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: KUNJ- FORM 1 Architect Certificate shital (1).pdf27 Aug 2021
PAN CardFile: society PAN.pdf25 Aug 2021
Copy of the legal title reportFile: title certificate RERA Format DS.pdf25 Aug 2021
Commencement Certificates / NA Order for plotted developmentFile: COLLECTOR NA ORDER (SANAD).pdf25 Aug 2021

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep THE GHATKOPAR SHITAL DHAM COOP HSG. SOCIETY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near GARODIA NAGAR6,700+ in Mumbai Suburban

Builder: THE GHATKOPAR SHITAL DHAM COOP. HSG. SOCIETY LTD.

THE GHATKOPAR SHITAL DHAM COOP. HSG. SOCIETY LTD. has 1 registration on MahaRERA, including THE GHATKOPAR SHITAL DHAM COOP HSG. SOCIETY LTD.. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if THE GHATKOPAR SHITAL DHAM COOP HSG. SOCIETY LTD. is delayed beyond 31 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of THE GHATKOPAR SHITAL DHAM COOP HSG. SOCIETY LTD.?

The registered promoter entity is THE GHATKOPAR SHITAL DHAM COOP. HSG. SOCIETY LTD., a society as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in THE GHATKOPAR SHITAL DHAM COOP HSG. SOCIETY LTD.?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for THE GHATKOPAR SHITAL DHAM COOP HSG. SOCIETY LTD.?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at THE GHATKOPAR SHITAL DHAM COOP HSG. SOCIETY LTD.?

The professionals named in the filing: Architect: KUNJ RAMBHIA ARCHITECTS; Engineer: Agami Engineering; Chartered Accountant: V DOSHI & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in THE GHATKOPAR SHITAL DHAM COOP HSG. SOCIETY LTD.?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About THE GHATKOPAR SHITAL DHAM COOP HSG. SOCIETY LTD.. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save THE GHATKOPAR SHITAL DHAM COOP HSG. SOCIETY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.