ReraGenieLog inGet a buyer report

Home / Browse projects / Bengaluru Urban, Karnataka / The Big Tree

Registration approved Residential/Group Housing project

The Big Tree

By Ceear Realty & Infrastructure Private Limited

RG-KA-90774 · RERA PRM/KA/RERA/1251/310/PR/171014/000860

Source: official RERA Karnataka filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No complaints on record
  • Separate project account declared
Dec 2019Possession promisedmoved 12 months from the original
0Complaints at RERA Karnatakaon this registration
Jump to the 54 documents Report an error

The Big Tree is a Residential/Group Housing project by Ceear Realty & Infrastructure Private Limited in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/171014/000860 on 14 Oct 2017. Possession is promised by 31 Dec 2019. The completion date has moved by 12 months from the original filing.

At a glance

Project

  • NameThe Big Tree
  • TypeResidential/Group Housing
  • Location
    • Bengaluru South
    • Bengaluru Urban
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1251/310/PR/171014/000860
  • ReraGenie IDRG-KA-90774

Builder

  • NameCeear Realty & Infrastructure Private Limited
  • Entity typeCompany
  • CINU70102MH2012PTC236546
  • Authorized SignatoryAnukool Purandare

Key dates

this monthRegisteredOct 2017First promiseDec 2018Revised toDec 2019

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on14 Oct 2017
  • Promised completion31 Dec 2019
  • Revised completionRevised to 31 Dec 2019 (originally 31 Dec 2018)
  • Buildings1 building record
  • Documents filed54 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
The Big Tree---14014

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level BeamNot applicable
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)Not applicable
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawings-
Modular Kitchen-

Progress on shared amenities44

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyNoNot applicable
Internal Roads & FootpathsNoNot applicable
Sewage and Drainage SystemYes-
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
Provision for community buildings and for treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalNoNot applicable
Water conservationNoNot applicable
Energy managementYes-
Fire protection and fire safety requirementsYes-
Education/Health/Other public amenitiesNoNot applicable
Electricity supply transformer and substationYes-
Emergency Evacuation servicesNoNot applicable
Storm water drainsNoNot applicable
Use of renewable energyYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolYes-
GymNoNot applicable
ParksNoNot applicable
Power BackupYes-
GasNoNot applicable
Water and SanitationNoNot applicable
Air Conditioning And incerntionNoNot applicable
Fitness CenterYes-
Video Door PhoneYes-
Stack ParkingYes-
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesNoNot applicable
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area892 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 10.67 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectTushar Bhor
EngineerN.N.Nagendra Kumar

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EX/PRM/KA/RERA/1251/310/PR/200526/000860Dec 2018 → Dec 2019

Reason as filed by the promoterAwaiting Approvals

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed54

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/171014/000860 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CertificateFile: Incorporation certficate.pdf-
Architect Certificate for Work Completion Schedule till DateFile: Architect Certificate - Work Completion.pdf-
Engineer Certificate for Work Completion Schedule till DateFile: Engineer Certificate - Work Completion.pdf-
CA Certificate for Funds UtilizationFile: CA certificate - fund utilized.pdf-
Architect Certificate for Pending Work Completion Schedule.File: Architect Certificate - Work Pending.pdf-
Engineer Certificate for Pending Work Completion Schedule.File: Engineer Certificate - Work Pending.pdf-
CA Certificate for Funds required for Project CompletionFile: CA certificate - funds required.pdf-
AffidavitFile: Declaration (Form B).pdf-
Latest Encumbrance Certificate-
Details Of Sold/ Un-sold UnitsFile: SoldUnsoldDetails.xlsx-
NOC DetailsFile: Fire NOC Big Tree latest.pdf-
Document 1-
Commencement Certificate-
Approved BuildingPlotting Plan-
Approved Layout Plan-
Proforma for Sale Deed-
Binder1-
Approved Layout Plan - Existing-
ExistingApproved Section of BuildingInfrastructure Plan of Plotting-
Land Document & location-
Approved Section of BuildingInfrastructure Plan of Plotting-
Area Development Plan of Project Area-
Proforma of Allotment Letter-
Ebrocure - The Big Tree-
All NoC's from Authority-
Project Specifiation-
Encumbrance Certificate-
Mutation Jayanagar- Khata-
Search Report-
Possession Letter from The City Improvement Trust Board-
Fire-
Airports Authority Of India-
BESCOM-
Balance Sheet 2015 - 2016File: Ceear Balance Sheet - 2016.pdf-
Balance Sheet 2014 - 2015File: Ceear Balance Sheet - 2015.pdf-
Balance Sheet 2013 - 2014File: Ceear Balance Sheet - 2014.pdf-
Audited Profit and Loss Statement 2015 - 2016File: Ceear Profit and Loss - 2016.pdf-
Audited Profit and Loss Statement 2014 - 2015File: Ceear Profit and Loss - 2015.pdf-
Audited Profit and Loss Statement 2013 - 2014File: Ceear Profit and Loss - 2014.pdf-
Director's Report 2015 - 2016File: Ceear Directors Report - 2016.pdf-
Director's Report 2014 - 2015File: Ceear Directors Report - 2015.pdf-
Director's Report 2013 - 2014File: Ceear Director Report - 2014.pdf-
Cash Flow Statement 2015 - 2016File: Ceear Cash Flow - 2016.pdf-
Cash Flow Statement 2014 - 2015File: Ceear Cash Flow - 2015.pdf-
Auditor's Report 2015 - 2016File: Ceear Audit Report - 2016.pdf-
Auditor's Report 2014 - 2015File: Ceear Auditors Report - 2015.pdf-
Auditor's Report 2013 - 2014File: Ceear Auditors Report - 2014.pdf-
Income Tax Return Acknowledgement 2015 - 2016File: Ceear ITR Ack - 2016.pdf-
Income Tax Return Acknowledgement 2014 - 2015File: Ceear ITR Ack - 2015.pdf-
Income Tax Return Acknowledgement 2013 - 2014File: Ceear ITR Ack - 2014.pdf-
Declaration (Form B)-
Prospectus/BrochureFile: Ebrocure - The Big Tree.pdf-
Advertisement Copy 1File: Advertisement.pdf-
Tower Excel SheetFile: PRM_KA_RERA_1251_310_PR_171014_000860.xlsx-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one moved by 12 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep The Big Tree on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

Builder: Ceear Realty & Infrastructure Private Limited

Ceear Realty & Infrastructure Private Limited has 1 registration on RERA Karnataka, including The Big Tree. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if The Big Tree is delayed beyond 31 Dec 2019?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of The Big Tree?

The registered promoter entity is Ceear Realty & Infrastructure Private Limited, a company as per the filing. Its CIN U70102MH2012PTC236546 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in The Big Tree?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at The Big Tree?

The professionals named in the filing: Architect: Tushar Bhor; Engineer: N.N.Nagendra Kumar. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in The Big Tree?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About The Big Tree. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save The Big Tree to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.