Registration approved No litigation declared Residential/Group Housing project

THE ABODE

By FIRST ENSEMBLE

RG-KA-80657 · RERA PRM/KA/RERA/1251/472/PR/150724/006940 · Last updated on RERA Karnataka portal: 15 Apr 2026

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Jun 2026Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 94 documents Report an error

THE ABODE is a Residential/Group Housing project by FIRST ENSEMBLE in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/472/PR/150724/006940 on 15 Jul 2024. Possession is promised by 30 Jun 2026.

At a glance

Project

  • NameTHE ABODE
  • TypeResidential/Group Housing
  • Location
    • Yelahanka
    • Bengaluru Urban
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1251/472/PR/150724/006940
  • ReraGenie IDRG-KA-80657

Builder

  • NameFIRST ENSEMBLE
  • Entity typePartnership Firm
  • GSTIN29AAJFF1996P1ZG
  • Authorized SignatorySatish S

Key dates

this monthRegisteredJul 2024PromisedJun 2026

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on15 Jul 2024
  • Promised completion30 Jun 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed94 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower---28028

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 15 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)-
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work-
Internal and External work including landscapes as per sanctioned drawings-

Progress on shared amenities40

As on 15 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Solid waste management and disposalYes-
Emergency Evacuation servicesNoNot applicable
Internal Roads & FootpathsNoNot applicable
Electricity supply transformer and substationYes-
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)Yes-
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseNoNot applicable
Community HallYes-
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolYes-
GymNoNot applicable
ParksNoNot applicable
Power BackupNoNot applicable
Piped GasYes-
Water and SanitationYes-
Air ConditioningNoNot applicable
StaircasesYes-
LiftsYes-
Corridor/LobbiesYes-
Fire escapesYes-
Common entrance and exit for the building/common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallNoNot applicable
Open parking areasNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable
Common storage spacesNoNot applicable

Land and ownership1

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Named landowners1
LandownerVillageDistrict
M/s First Ensemble--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 21.61 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 18.67 cr-
On-site expenditure-Cost Of Services(Water, Electricity, Sewage)Rs 2.93 cr-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectNaksha Satish
EngineerGuruprasad Kalkura
Chartered AccountantK Subash Chandra Babu

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed94

As listed on the registration, under the names the promoter filed them with; the newest 80 of 94 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/472/PR/150724/006940 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form4_Q42526_signed.pdf15 Apr 2026
Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Form5_Q42526_signed.pdf15 Apr 2026
Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form6_Q42526_signed.pdf15 Apr 2026
Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form4_Q32526_signed.pdf19 Feb 2026
Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Form5_Q32526_signed.pdf19 Feb 2026
Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: FORM 6 Q3_2526_signed.pdf19 Feb 2026
Provisional Financials FY 2023-24File: 1 Provisional Financials FY 2023-24.pdf6 Jun 2024
Partner Satish ITR FY 2022-23File: 2 Satish ITR FY 2022-23.pdf6 Jun 2024
Partner T K Venkapathy ITR 2022-23File: 3 T K Venkapathy ITR 2022-23.pdf6 Jun 2024
Partner V Nishanth ITR 2022-23File: 4 V Nishanth ITR 2022-23.pdf6 Jun 2024
Source of Funds with supporting docsFile: 5 Source of Funds with supporting docs.pdf6 Jun 2024
CA LicenseFile: 7 CA License.pdf6 Jun 2024
ECC-22052024-1247394File: 1 ECC-22052024-1247394.pdf6 Jun 2024
Clarification on Single Layout Plot and OrderFile: 1 Clarification on Single Layout Plot and Order.pdf6 Jun 2024
Clarification on Premium FARFile: 2 Clarification on Premium FAR.pdf6 Jun 2024
Certified Area StatementFile: 3 Certified Area Statement.pdf6 Jun 2024
Old Village Map DemarcationFile: 4 Old Village Map Demarcation.pdf6 Jun 2024
CDP DemarcationFile: 5 CDP Demarcation.jpg6 Jun 2024
Clarification on KSPCB NOCFile: 6 Clarification on KSPCB NOC.pdf6 Jun 2024
Clarification on Relinquishment DeedFile: 7 Clarification on Relinquishment Deed.pdf6 Jun 2024
Zonal Regulation 2007File: 8 Zonal Regulation 2007.pdf6 Jun 2024
BBMP Approved PlanFile: 9 BBMP Approved Plan.pdf6 Jun 2024
Form-2 Architect CertificateFile: 10 Form-2 Architect Certificate.pdf6 Jun 2024
Architect LicenseFile: 12 Architect License.pdf6 Jun 2024
Form-6 Engineer CertificateFile: 1 Form-6 Engineer Certificate.pdf6 Jun 2024
BESCOM NOC Fee and AffidavitFile: 3 BESCOM NOC Fee and Affidavit.pdf6 Jun 2024
Guidelines ValuesFile: 4 Guidelines Values.pdf6 Jun 2024
Clarification on STP DrawingFile: 5 Clarification on STP Drawing.pdf6 Jun 2024
Proforma Agreement of SaleFile: 6 Proforma Agreement of Sale.pdf6 Jun 2024
Registration CertificateFile: Certificate of Registration of Firm.pdf-
Partnership DeedFile: First ensemble partnership deed.pdf-
Partner Details-
Partner Details-
Partner Details-
Partner Details-
Partner Details-
Certificate issued by CA Form 1File: Form 1 CA Cert.pdf-
Certificate issued by Architect Form 2File: Form 2 Arc Cert.pdf-
Certificate issued by Engineer Form 3File: Form 3 Eng Cert.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: Non-Litigation Affidavit.pdf-
Certificate from Chartered AccountFile: Form 1 CA Cert.pdf-
BBMP CC-
BESCOM NOC Fee and Affidavit-
BWSSB NOC with fee paid receipt-
BBMP Approved Plan-
Building License-
BBMP Approved Plan-
Project Speccification-
Structural Stability Certificate-
Legal Opinion-
Not Avaialable-
Proforma Allotment Letter-
Form B Affidavit-
Section 3(1) Affidavit-
BESCOM NOC Fee and Affidavit-
BWSSB NOC with fee paid receipt-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
KSPCB NOC-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Title Deed and Old Khatha-
Area Statement - Arc-
BBMP CC-
Estimation of the Project-
Location Demarcation-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep THE ABODE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

Builder: FIRST ENSEMBLE

FIRST ENSEMBLE has 1 registration on RERA Karnataka, including THE ABODE. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if THE ABODE is delayed beyond 30 Jun 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of THE ABODE?

The registered promoter entity is FIRST ENSEMBLE, a partnership firm as per the filing. Its GSTIN 29AAJFF1996P1ZG can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in THE ABODE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at THE ABODE?

The professionals named in the filing: Architect: Naksha Satish; Engineer: Guruprasad Kalkura; Chartered Accountant: K Subash Chandra Babu. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in THE ABODE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About THE ABODE. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save THE ABODE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.