Home / Browse projects / Bengaluru Urban, Karnataka / thanushree sannidhi
thanushree sannidhi
RG-KA-96290 · RERA PRM/KA/RERA/1251/310/PR/190516/002552
Source: official RERA Karnataka filing
Red flags
- Completion date moved by 10 months
- 1 extension taken
Clear
- No complaints on record
- Separate project account declared
Saved.
thanushree sannidhi is a Mixed Development project by Thanushree Properties in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/190516/002552 on 16 May 2019. Possession is promised by 31 May 2020. The completion date has moved by 10 months from the original filing.
At a glance
Project
- Namethanushree sannidhi
- TypeMixed Development
- Location
- Bengaluru South
- Bengaluru Urban
- PincodeNot stated
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/310/PR/190516/002552
- ReraGenie IDRG-KA-96290
Builder
- NameThanushree Properties
- Entity typePartnership Firm
- Authorized SignatoryG.V. SRINIVAS
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on16 May 2019
- Promised completion31 May 2020
- Revised completionRevised to 31 May 2020 (originally 31 Jul 2019)
- Buildings1 building record
- Documents filed44 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| sannidhi | - | - | - | - | - | 44 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
Building:
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | - |
| Foundation footing work | - |
| Retaining wall (All types) | - |
| Plinth level Beam | - |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | - |
| RCC or MS Framed structure | - |
| Masonry construction: Bricks, Concrete blocks etc | - |
| Plastering inside , outside & Ceiling | - |
| Joinery: Doors, Windows, Ventilators etc | - |
| Basic work of Water supply, Sanitary and Electrification | - |
| Dadoing, Skirting, Flooring, Tiles work (All types) | - |
| Railing and Grill fixing | - |
| Electrification, Water supply and Sanitary Finishing | - |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Fire prevention and fire fighting fitting and fixture with network | Not applicable |
| Weather Proof work(tile,concrete) | - |
| Painting | - |
| Elevation work | - |
| Internal and External work including landscapes as per santioned drawings | - |
Progress on shared amenities41
Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | - |
| Internal Roads & Footpaths | No | Not applicable |
| Sewage and Drainage System | Yes | - |
| Parks & Tree planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Provision for community buildings and for treatment and disposal of sewage and sullage water | No | Not applicable |
| Solid waste management and disposal | No | Not applicable |
| Water conservation | Yes | - |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Education/Health/Other public amenities | No | Not applicable |
| Electricity supply transformer and substation | Yes | - |
| Emergency Evacuation services | No | Not applicable |
| Storm water drains | Yes | - |
| Use of renewable energy | No | Not applicable |
| Water conservation/rain water harvesting/recharge of ground water | Yes | - |
| Electricity | Yes | - |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | - |
| Club House | No | Not applicable |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | No | Not applicable |
| Swimming Pool | Yes | - |
| Gym | No | Not applicable |
| Parks | No | Not applicable |
| Power Backup | Yes | - |
| Gas | No | Not applicable |
| Water and Sanitation | Yes | - |
| Air Conditioning And incerntion | No | Not applicable |
| Staircases | Yes | - |
| Lifts | Yes | - |
| Staircases and Lift lobbies, corridor,lobbies, corridor | Yes | - |
| Fire escapes | No | Not applicable |
| Common entrance and exit for the building / common portico/foyer/verandah | Yes | - |
| Basement | Yes | - |
| Terrace | Yes | - |
| Outer Wall | Yes | - |
| Open parking areas and common storage spaces | No | Not applicable |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | No | Not applicable |
Land and ownership
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | V. SIVA KUMAR |
| Engineer | Srinivas rao bolimunta |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterShortage of Labour
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed44
As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/190516/002552 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| CertificateFile: firm reg form.jpg | - |
| Architect Certificate for Work Completion Schedule till DateFile: arch sw.jpg | - |
| Engineer Certificate for Work Completion Schedule till DateFile: eng sw.jpg | - |
| CA Certificate for Funds UtilizationFile: CA fund utilisation (1).pdf | - |
| Architect Certificate for Pending Work Completion Schedule.File: Arc certificate - work pending _1_.pdf | - |
| Engineer Certificate for Pending Work Completion Schedule.File: eng pw.jpg | - |
| CA Certificate for Funds required for Project CompletionFile: CA ceriticate of funds reqd.pdf | - |
| AffidavitFile: Affidavit.pdf | - |
| Latest Encumbrance CertificateFile: EC.pdf | - |
| Details Of Sold/ Un-sold UnitsFile: NO FLATS HAS BEEN SOLD TILL TODAY-converted.pdf | - |
| Document 1File: bank statement.pdf | - |
| commencement certificate | - |
| approved plan 1 | - |
| draft saledeed | - |
| draft sale agreement (1) | - |
| site saledeed | - |
| aproved plan 2 | - |
| brochure | - |
| specification | - |
| encumbarance 2004 to 2018 | - |
| AFFIDAVT 2 | - |
| katha 2018 | - |
| conversion copy_Compressed | - |
| brochure | - |
| legal report | - |
| Balance Sheet 2017 - 2018File: balance sheet 2017.jpg | - |
| Balance Sheet 2016 - 2017File: balance sheet of 2016.jpg | - |
| Balance Sheet 2015 - 2016File: balance sheet 2015.jpg | - |
| Audited Profit and Loss Statement 2017 - 2018File: profit and loss statmnt 2017.jpg | - |
| Audited Profit and Loss Statement 2016 - 2017File: profit and loss statmnt 2016.jpg | - |
| Audited Profit and Loss Statement 2015 - 2016File: profit and loss statement 2015.jpg | - |
| Cash Flow Statement 2017 - 2018File: cash flow 2017.jpg | - |
| Cash Flow Statement 2016 - 2017File: cash flow of 2016.jpg | - |
| Auditor's Report 2017 - 2018File: audit report of 2017.jpg | - |
| Auditor's Report 2016 - 2017File: audit report of 2016.jpg | - |
| Auditor's Report 2015 - 2016File: auditor report of 2015.jpg | - |
| Income Tax Return Acknowledgement 2017 - 2018File: itr acknowldgemnt of 2017.jpg | - |
| Income Tax Return Acknowledgement 2016 - 2017File: itr acknowldgemnt of 2016.jpg | - |
| Income Tax Return Acknowledgement 2015 - 2016File: itr of 2015.jpg | - |
| affidavit | - |
| Prospectus/Brochure | - |
| Tower Excel SheetFile: PRM_KA_RERA_1251_310_PR_190516_002552.xlsx | - |
| Occupancy CertificateFile: O C - SANNIDHI.pdf | - |
| Registered conveyance deed for an individual unitFile: irrrr Doc 2020-02-21 12.25.19.pdf | - |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep thanushree sannidhi on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 30 registered projects within 2 km.
Prestige Park Grove
PRESTIGE PROJECTS PRIVATE LIMITED
Prestige Lakeside Habitat
Prestige Habitat Ventures
LivingTree by Kalyani Developers
Kalyani Tech Park Private Limited
PRESTIGE FALCON CITY
PRESTIGE NOTTINGHILL INVESTMENTS
SATTVA CITY
SATTVA CITY PRIVATE LIMITED
GM AMBITIOUS ENCLAVE
M/s. Allam Infinite India Private Limited
See every Bengaluru Urban project, with the district possession charts
Builder: Thanushree Properties
Thanushree Properties has 1 registration on RERA Karnataka, including thanushree sannidhi. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if thanushree sannidhi is delayed beyond 31 May 2020?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of thanushree sannidhi?
The registered promoter entity is Thanushree Properties, a partnership firm as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in thanushree sannidhi?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at thanushree sannidhi?
The professionals named in the filing: Architect: V. SIVA KUMAR; Engineer: Srinivas rao bolimunta. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in thanushree sannidhi?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback