ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / TEN BKC

Registered No litigation declared Mixed project

TEN BKC

By MAHALAXMI LAND DEVELOPERS

RG-MH-07410 · RERA P52100076998 · Last updated on MahaRERA portal: 10 Jul 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedno revision filed
2 of 11Construction stages donefurthest along: Slabs of Super Structure, 90%
70 of 199Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 74 documents Report an error

TEN BKC is a Mixed project by MAHALAXMI LAND DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100076998 on 16 Jul 2024. Possession is promised by 31 Dec 2029. 129 of the 199 units on this registration are recorded sold or booked, and 2 of 11 construction stages are filed complete.

At a glance

Project

  • NameTEN BKC
  • TypeMixed
  • Location
    • INDUSTRIAL PLOT NO 28 SECTOR 10 BHOSARI
    • PUNE
    • Haveli
    • 411026
  • Pincode411026
  • RERA no.P52100076998
  • ReraGenie IDRG-MH-07410

Builder

  • NameMAHALAXMI LAND DEVELOPERS
  • Entity typePartnership
  • PartnersNAVIN ASHOK AGARWAL, RAKESH SURESH GUPTA

Key dates

this monthRegisteredJul 2024PromisedDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on16 Jul 2024
  • Promised completion31 Dec 2029
  • Revised completionNone
  • Buildings1 building record
  • Documents filed74 files

Current status

65%129 of 199 units booked
66.9%Work done, per cost certificate

Figures as on 10 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ANA710199199

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 10 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 90%.

A: 42% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks25%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.25%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.25%

Progress on shared amenities15

As on 10 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes80%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed84

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots84
Closed/Covered84

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,435 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
Declared on26 Jul 2025

Approvals and building plan

Sanctioning authorityPMRDA
Permissible FSI11623.97
Proposed, not sanctioned8,624 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSr No 62, Bldg A, Girme Heights PN 2, 12, Salunkhe Vihar, Pune, Maharashtra 411040
Estimated costRs 41.15 cr
Cost incurredRs 27.54 cr
Work done66.93%
BuildingWingEstimatedIncurred
ANARs 36.73 crRs 27.54 cr
-NARs 4.42 cr-

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSHEKAR KOKANE PLANNING AND DESIGN CONEULTANT
EngineerVIKAS BORNARE
Chartered AccountantAgarwal Oswal & Associates
Chartered AccountantAGRAWAL OSWAL AND ASSOCIATES
Chartered AccountantPranay Gupta & Associates
Chartered AccountantShweta Agrawal
PartnerRole in project
MAHALAXMI LAND DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 May 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 May 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 May 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 May 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2029

Documents filed74

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Architect certificate .pdf10 Jul 2026
Withdrawal Update Form 2File: Engineer certificate .pdf10 Jul 2026
Withdrawal Update Form 3File: CA Certificate.pdf10 Jul 2026
Withdrawal Update Form 1File: Architects Certificate.pdf11 Apr 2026
Withdrawal Update Form 2File: Engineers Certificate.pdf11 Apr 2026
Withdrawal Update Form 3File: CA Certificate.pdf11 Apr 2026
Withdrawal Update Form 1File: Scan Architects Certificate.pdf10 Jan 2026
Withdrawal Update Form 2File: Engineer Certificate.pdf10 Jan 2026
Withdrawal Update Form 3File: CA Certificate.pdf10 Jan 2026
Withdrawal Update Form 1File: Scan Architects Certificate.pdf15 Oct 2025
Withdrawal Update Form 2File: Scan Engineers Certificate.pdf15 Oct 2025
Withdrawal Update Form 3File: scan CA Certificate_.pdf15 Oct 2025
Form 5 (FY 2024-2025)File: MLD-24-25-FORM 5.pdf15 Oct 2025
Withdrawal Update Form 1File: Architect certificate TEN BKC as on 30-12-2024.pdf30 Jul 2025
Withdrawal Update Form 1File: Architectu0027s Certificate 30June2025.pdf30 Jul 2025
Withdrawal Update Form 2File: Engg Certificate as on 31-12-2024 TEN BKC.pdf30 Jul 2025
Withdrawal Update Form 2File: Engineeru0027s Certificate 30June2025.pdf30 Jul 2025
Withdrawal Update Form 3File: CA certificate MLD bhosari.pdf30 Jul 2025
Withdrawal Update Form 3File: CA Certificate 02July2025_compressed.pdf30 Jul 2025
Form 1File: Architect certificate Ten BKC.pdf4 Jul 2025
Form 2File: Engg certificate Ten BKC.pdf4 Jul 2025
Form 3File: Form3.pdf4 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold and unsold.pdf4 Jul 2025
Form 1File: Architect certificate TEN BKC as on 30-12-2024.pdf4 Jul 2025
Form 2File: Engg Certificate as on 31-12-2024 TEN BKC.pdf4 Jul 2025
Form 3File: Form 3 CA Certificate 1 (1)_compressed (1).pdf4 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold and unsold Ten BKC as on 31-12-2024.pdf4 Jul 2025
Form 1File: MLD ARCHITECT.pdf4 Jul 2025
Form 2File: MLD ENGINEER.pdf4 Jul 2025
Form 3File: Form 3_compressed.pdf4 Jul 2025
Disclosure of Sold and Booked InventoryFile: MLD sold unsold as on 31-0-2025.pdf4 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate TEN BKC as on 30-12-2024.pdf31 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate 1 (1)_compressed.pdf31 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Certificate as on 31-12-2024 TEN BKC.pdf31 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold and unsold Ten BKC as on 31-12-2024_compressed.pdf31 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate Ten BKC.pdf20 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3_compressed.pdf20 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg certificate Ten BKC.pdf20 Dec 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold and unsold.pdf20 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality Assurance Certificate Form 2A-bhosari.pdf20 Dec 2024
Other - TechnicalFile: Declaration for Canteen.pdf26 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate MLD bhosari.pdf13 Jun 2024
Declaration about Commencement CertificateFile: Declaration About Commencement Certificate.pdf27 May 2024
Layout approvalFile: 01-05.pdf16 May 2024
Building plan approvalFile: 02-05.pdf16 May 2024
Building plan approvalFile: 03-05.pdf16 May 2024
Building plan approvalFile: 03-05.pdf16 May 2024
Building plan approvalFile: 04-05.pdf16 May 2024
Building plan approvalFile: 05-05.pdf16 May 2024
PAN CardFile: MLD_PAN.pdf16 May 2024
Copy of the legal title reportFile: Bhosari legal report RERA.pdf16 May 2024
Details of encumbrances concerned to FinanceFile: ENCUMBERANCE LETTER - FINANCE.pdf16 May 2024
Details of encumbrances concerned to FinanceFile: ENCUMBERANCE LETTER-LEGAL.pdf16 May 2024
Details of encumbrances concerned to LegalFile: ENCUMBERANCE LETTER - FINANCE.pdf16 May 2024
Details of encumbrances concerned to LegalFile: ENCUMBERANCE LETTER-LEGAL.pdf16 May 2024
Copy of Layout Approval (in case of layout)File: 01-05.pdf16 May 2024
Building Plan Approval / NA Order for plotted developmentFile: 02-05.pdf16 May 2024
Building Plan Approval / NA Order for plotted developmentFile: 03-05.pdf16 May 2024
Building Plan Approval / NA Order for plotted developmentFile: 03-05.pdf16 May 2024
Building Plan Approval / NA Order for plotted developmentFile: 04-05.pdf16 May 2024
Building Plan Approval / NA Order for plotted developmentFile: 05-05.pdf16 May 2024
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf16 May 2024
Declaration in FORM BFile: Form B Bhosari.pdf16 May 2024
CERSAI detailsFile: CERSAI DECLARATION.pdf16 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest Navin sir.pdf16 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Rakesh Gupta.pdf16 May 2024
Proforma of Agreement for saleFile: RERA Agreement draft.pdf16 May 2024
Proforma of Allotment letterFile: Proforma of Allotment letter.pdf16 May 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about Separate Bank Account.pdf16 May 2024
Deviation Report with respect to Allotment letterFile: DEVIATION IN ALLOTTMENT REPORT.pdf16 May 2024
Deviation Report with respect to model copy of AgreementFile: DEVIATION letter agreement.pdf16 May 2024
Other - LegalFile: LEASE DEED BHOSARI_compressed.pdf16 May 2024
Other - LegalFile: Mahalaxmi Land Developers - PD.pdf16 May 2024
Other - TechnicalFile: Undertaking cum declaration.pdf16 May 2024

How this compares with Pune

65%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep TEN BKC on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PUNE13,700+ in Pune

Builder: MAHALAXMI LAND DEVELOPERS

MAHALAXMI LAND DEVELOPERS has 1 registration on MahaRERA, including TEN BKC. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if TEN BKC is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of TEN BKC?

The registered promoter entity is MAHALAXMI LAND DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in TEN BKC?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for TEN BKC?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at TEN BKC?

The professionals named in the filing: Architect: SHEKAR KOKANE PLANNING AND DESIGN CONEULTANT; Engineer: VIKAS BORNARE; Chartered Accountant: Agarwal Oswal & Associates; Chartered Accountant: AGRAWAL OSWAL AND ASSOCIATES; Chartered Accountant: Pranay Gupta & Associates; Chartered Accountant: Shweta Agrawal. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in TEN BKC?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About TEN BKC. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save TEN BKC to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.