Registration approved Residential/Group Housing project

TEMPLETREE

By S B URBANSCAPES

RG-KA-72718 · RERA PRM/KA/RERA/1251/310/PR/171223/002016 · Last updated on RERA Karnataka portal: 19 Apr 2022

Source: official RERA Karnataka filing

Red flags

  • Completion date moved by 27 months
  • 3 extensions taken

Clear

  • No complaints on record
  • Separate project account declared
Sep 2023Possession promisedmoved 27 months from the original
0Complaints at RERA Karnatakaon this registration
Jump to the 88 documents Report an error

TEMPLETREE is a Residential/Group Housing project by S B URBANSCAPES in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/171223/002016 on 23 Dec 2017. Possession is promised by 30 Sep 2023. The completion date has moved by 27 months from the original filing.

At a glance

Project

  • NameTEMPLETREE
  • TypeResidential/Group Housing
  • Location
    • Bengaluru South
    • Bengaluru Urban
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/310/PR/171223/002016
  • ReraGenie IDRG-KA-72718

Builder

  • NameS B URBANSCAPES
  • Entity typePartnership Firm
  • Authorized SignatoryRAJAGOPAL.D
  • OthersRAMASUBAMMA K
  • Other registrations1 more →

Key dates

this monthRegisteredDec 2017First promiseJun 2021Revised toSep 2023

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on23 Dec 2017
  • Promised completion30 Sep 2023
  • Revised completionRevised to 30 Sep 2023 (originally 30 Jun 2021)
  • Buildings3 building records
  • Documents filed88 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TOWER -1---53053
TOWER 2---52052
TOWER 3---53053

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 19 Apr 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

As on 19 Apr 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsYes-
Sewage and Drainage SystemYes-
Parks & Tree plantingYes-
Street LightingYes-
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes-
Solid waste management and disposalYes-
Water conservationYes-
Energy managementYes-
Fire protection and fire safety requirementsYes-
Education/Health/Other public amenitiesNoNot applicable
Electricity supply transformer and substationYes-
Emergency Evacuation servicesYes-
Storm water drainsYes-
Use of renewable energyYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseYes-
Community HallYes-
Outdoor Sports facilityYes-
Indoor Sports facilityYes-
Swimming PoolYes-
GymYes-
ParksNoNot applicable
Power BackupYes-
GasYes-
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesYes-
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesYes-
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes-

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area9,053 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 59.00 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVERNEKAR ASSOCIATES PVT LTD
EngineerBABU REDDY

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

ExtensionJun 2021 → Mar 2022

No reason recorded in the filing

EX/PRM/KA/RERA/1251/310/PR/220505/002016Mar 2022 → Mar 2023

Reason as filed by the promoterothers

ExtensionMar 2023 → Sep 2023

No reason recorded in the filing

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed88

As listed on the registration, under the names the promoter filed them with; the newest 80 of 88 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/171223/002016 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Letter for Bank Account omissionFile: 01 - Letter for Bank Account omission.pdf19 Apr 2022
Temple Tree - Airport NOCFile: 02_01a - Temple Tree - Airport NOC.pdf19 Apr 2022
Temple Tree - Bwssb NocFile: 02_01b - Temple Tree - Bwssb Noc.pdf19 Apr 2022
Temple Tree - Bescom NocFile: 02_01c - Temple Tree - Bescom Noc.pdf19 Apr 2022
Temple Tree Project Contractors DetailsFile: 02_02 - Temple Tree Project Contractors Details.pdf19 Apr 2022
Abstract of BHK wise Brake up Development DetailsFile: 02_03a - Abstract of BHK wise Brake up Development Details.pdf19 Apr 2022
Temple Tree Land Area DetailsFile: 02_03b - Temple Tree Land Area Details.pdf19 Apr 2022
Total Open Area + Total Covered Area is equals to Total area of LandFile: Land Area Details TempleTree.pdf7 Mar 2022
Abstract of BHK wise break up development detailsFile: BHK wise development Abstract.pdf7 Mar 2022
Project contractors detailsFile: Project contractors details.pdf7 Mar 2022
Certificate from Registered EngineerFile: Structural Stability Certificate.pdf7 Mar 2022
Proforma of Agreement of Sale (AOS)File: Proforma AOS of TempleTree.pdf7 Mar 2022
NOC from BESCOMFile: BESCOM NOC Temple Tree.pdf7 Mar 2022
NOC from BWSSBFile: BWSSB NOC Temple Tree.pdf7 Mar 2022
NOC from Airport AuthorityFile: AIRPORT NOC Temple Tree.pdf7 Mar 2022
BESCOM NOCFile: BESCOM NOC Temple Tree.pdf17 Feb 2022
BWSSB NOCFile: BWSSB NOC Temple Tree.pdf17 Feb 2022
Airport authority NOCFile: AIRPORT NOC Temple Tree.pdf17 Feb 2022
Form EX7 AffidavitFile: Form - Ex7 Affidavit.pdf17 Feb 2022
BHK wise development breakup detailsFile: BHK wise developmental details.pdf17 Feb 2022
Commencement certificateFile: Commencement Certificate.pdf17 Feb 2022
Building drawing-01File: Drawing - 01.PDF17 Feb 2022
Building drawing-02File: Drawing - 02.PDF17 Feb 2022
Building drawing-03File: Drawing - 03.PDF17 Feb 2022
Building drawing-04File: Drawing - 04.PDF17 Feb 2022
Building drawing-05File: Drawing - 05.PDF17 Feb 2022
Building drawing-06File: Drawing - 06.PDF17 Feb 2022
Building drawing-07File: Drawing - 07.PDF17 Feb 2022
Building drawing-08File: Drawing - 08.PDF17 Feb 2022
Building drawing-09File: Drawing - 09.PDF17 Feb 2022
Building drawing-10File: Drawing - 10.PDF17 Feb 2022
Building drawing-11File: Drawing - 11.PDF17 Feb 2022
STP - Demarcation location planFile: Bhalli Plan Copy.PDF17 Feb 2022
Land area details as per the drawingsFile: Bhalli Plan Copy.PDF17 Feb 2022
CertificateFile: SB Urbanscapes Reg Form New.pdf-
Project Details-
Architect Certificate for Work Completion Schedule till DateFile: 1-Architects Certificate Status of Work.pdf-
Engineer Certificate for Work Completion Schedule till DateFile: 6- Ex5 Engg Certificate - Completed Work.pdf-
CA Certificate for Funds UtilizationFile: 3-CA Certificate For Funds Utilization Form 3.pdf-
Architect Certificate for Pending Work Completion Schedule.File: 2-Architects Certificate Pending Work.pdf-
Engineer Certificate for Pending Work Completion Schedule.File: 5-Ex6 Engg Certificate - Pending Work.pdf-
CA Certificate for Funds required for Project CompletionFile: 4-CA Certificate For Funds Required Form 4.pdf-
AffidavitFile: Form B.pdf-
Latest Encumbrance CertificateFile: Temple Tree Ec 01-04-2004 to 01-02-22.pdf-
Consent letter from 2/3rd of AllotteesFile: Customer Consent letter.pdf-
Details Of Sold/ Un-sold UnitsFile: SoldUnsoldDetails.xlsx-
Document 1File: 2 - KSPCP Temple Tree.pdf-
planapproval-
layoutplan-
Draft Sale Deed of Yelechanahalli-
401-SALe CUM CONSTRUCTION-
sectiondrawing-
layoutplan-
allotmentletter-
allnoc-
SPECIFICATIONS NEW-
EC-
saledeed-
jd-
RTC FROM 1969-2014-
conversion-
28 FIRE NOC-
42 Airport Authority of India -Approval letter-
29 BWSSB NOC-
31 Kspcb Approval Bhalli Site-
30 Environmental Approval (SEIAA)-
sectiondrawing-
Balance Sheet 2015 - 2016File: AY 16-17 - balance sheet.pdf-
Balance Sheet 2014 - 2015File: 14-15 - Balnce sheet.pdf-
Balance Sheet 2013 - 2014File: 13-14 - Balance Sheet.pdf-
Audited Profit and Loss Statement 2015 - 2016File: AY 16-17 - P & L.pdf-
Audited Profit and Loss Statement 2014 - 2015File: 14-15 - PL.pdf-
Audited Profit and Loss Statement 2013 - 2014File: 13-14 - P&L.pdf-
Director's Report 2015 - 2016File: Directors Report .pdf-
Director's Report 2014 - 2015File: Directors Report .pdf-
Director's Report 2013 - 2014File: Directors Report .pdf-
Cash Flow Statement 2015 - 2016File: cash flow 15-16.pdf-
Cash Flow Statement 2014 - 2015File: cash flow 14-15.pdf-
Auditor's Report 2015 - 2016File: Auditors Report.pdf-
Auditor's Report 2014 - 2015File: Auditors Report.pdf-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one moved by 27 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep TEMPLETREE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmTEMPLETREEOther 16Dot size: filed unitsN

Filed coordinates, straight-line distance. 16 registered projects within 2 km.

Builder: S B URBANSCAPES

S B URBANSCAPES has 2 registrations on RERA Karnataka, including SKANDA LAKE FRONT and TEMPLETREE. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if TEMPLETREE is delayed beyond 30 Sep 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of TEMPLETREE?

The registered promoter entity is S B URBANSCAPES, a partnership firm as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in TEMPLETREE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at TEMPLETREE?

The professionals named in the filing: Architect: VERNEKAR ASSOCIATES PVT LTD; Engineer: BABU REDDY. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in TEMPLETREE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About TEMPLETREE. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save TEMPLETREE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.