Home / Browse projects / Bengaluru Urban, Karnataka / TELOSA
TELOSA
By KINGLIFE INFRA PRIVATE LIMITED
RG-KA-90455 · RERA PRM/KA/RERA/1251/310/PR/060324/006688 · Last updated on RERA Karnataka portal: 29 Feb 2024
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
TELOSA is a Residential/Group Housing project by KINGLIFE INFRA PRIVATE LIMITED in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/060324/006688 on 6 Mar 2024. Possession is promised by 31 Mar 2030.
At a glance
Project
- NameTELOSA
- TypeResidential/Group Housing
- Location
- Bengaluru South
- Bengaluru Urban
- 560034
- Pincode560034
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/310/PR/060324/006688
- ReraGenie IDRG-KA-90455
Builder
- NameKINGLIFE INFRA PRIVATE LIMITED
- Entity typeCompany
- CINU70100KA2018PTC117218
- GSTIN29AAHCK3067B1ZM
- Authorized SignatoryAMBALAL GOKUL PATEL
- DirectorAMBALAL GOKUL PATEL
- DirectorsAMBALAL GOKUL PATEL, BHARAT GOKUL HANNAT, KRISHNAPPA MUNIRAJU
- Project HeadAMBALAL GOKUL PATEL
- Other registrations1 more →
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on6 Mar 2024
- Promised completion31 Mar 2030
- Revised completionNone
- Buildings1 building record
- Documents filed100 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| TELOSA | - | - | - | 8 | 0 | 8 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 29 Feb 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
Building:
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | - |
| Foundation footing work | - |
| Upto Plinth Level | - |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | - |
| Retaining wall (All types) | - |
| RCC or MS Framed structure | - |
| Masonry Construction | - |
| Plastering inside , outside & Ceiling | - |
| Joinery: Doors, Windows, Ventilators etc | - |
| Basic work of Water supply, Sanitary and Electrification | - |
| Dadoing, Skirting, Flooring, Tiles work (All types) | - |
| Railing and Grill fixing | - |
| Electrification, Water supply and Sanitary Finishing | - |
| Painting | - |
| Fire prevention and fire fighting fitting and fixture with network | - |
| Weather Proof work(tile,concrete) | Not applicable |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | - |
| Internal and External work including landscapes as per sanctioned drawings | - |
Progress on shared amenities40
As on 29 Feb 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | - |
| Sewage and Drainage System | Yes | - |
| Water conservation/rain water harvesting/recharge of ground water | Yes | - |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Solid waste management and disposal | No | Not applicable |
| Emergency Evacuation services | No | Not applicable |
| Electricity supply transformer and substation | Yes | - |
| Internal Roads & Footpaths | No | Not applicable |
| Storm water drains | No | Not applicable |
| Use of renewable energy | No | Not applicable |
| Sewage Treatment Plant (STP) | No | Not applicable |
| Parks & Tree planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Electricity | Yes | - |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | - |
| Club House | No | Not applicable |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | No | Not applicable |
| Swimming Pool | No | Not applicable |
| Gym | No | Not applicable |
| Parks | No | Not applicable |
| Power Backup | Yes | - |
| Piped Gas | No | Not applicable |
| Water and Sanitation | Yes | - |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | - |
| Lifts | Yes | - |
| Corridor/Lobbies | Yes | - |
| Fire escapes | Yes | - |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | - |
| Basement | No | Not applicable |
| Terrace | Yes | - |
| Outer Wall | Yes | - |
| Open parking areas | No | Not applicable |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | No | Not applicable |
| Common storage spaces | No | Not applicable |
Land and ownership1
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| KINGLIFE INFRA PRIVATE LIMITED | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 5.81 cr | - |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | BRINDA KANNAN |
| Engineer | HARISH REDDY B |
| Chartered Accountant | GYANCHAND AGARWAL |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed100
As listed on the registration, under the names the promoter filed them with; the newest 80 of 100 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/060324/006688 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| AFFIDAVIT FOR POWER & WATER SUPPLYFile: AFFIDAVIT FOR POWER & WATER SUPPLY.pdf | 29 Feb 2024 |
| BESCOMFile: BESCOM.pdf | 29 Feb 2024 |
| BWSSBFile: BWSSB.pdf | 29 Feb 2024 |
| FORM 1 CA CERTIFICATE RERAFile: FORM 1 CA CERTIFICATE RERA.pdf | 29 Feb 2024 |
| GUIDELINE BY SRFile: GUIDELINE BY SR.pdf | 29 Feb 2024 |
| (Refer both pages) PROJECT SPECIFICATION SHEETFile: KINGLIFE PROJECT SPECIFICATION SHEET.pdf | 29 Feb 2024 |
| KSPCB for STPFile: KSPCB for STP.pdf | 29 Feb 2024 |
| STP DRAWINGS KINGLIFE INFRA PRIVATE LIMITEDFile: STP DRAWINGS KINGLIFE INFRA PRIVATE LIMITED.pdf | 29 Feb 2024 |
| RERA BANK 3 ACCOUNTSFile: RERA BANK 3 ACCOUNTS.jpg | 29 Feb 2024 |
| Land Calculations sheet signed copyFile: Land Calculations sheet.jpg | 29 Feb 2024 |
| AFFIDAVIT FOR POWER & WATER SUPPLYFile: AFFIDAVIT FOR POWER & WATER SUPPLY.pdf | 13 Feb 2024 |
| AGREEMENT FOR SALEFile: AGREEMENT FOR SALE.pdf | 13 Feb 2024 |
| ALLOTMENT LETTERFile: ALLOTMENT LETTER.pdf | 13 Feb 2024 |
| AREA STATEMENT TELOSA SIGNED COPYFile: AREA STATEMENT TELOSA SIGNED COPY.pdf | 13 Feb 2024 |
| CDP AREA MASTER PLANFile: CDP AREA MASTER PLAN.pdf | 13 Feb 2024 |
| ENGINEER LICENCE self attestedFile: ENGINEER LICENCE self attested.pdf | 13 Feb 2024 |
| Financials 2020-21 with UDIN signedFile: Financials 2020-21 with UDIN signed.pdf | 13 Feb 2024 |
| Financials 2021-22 with UDIN signedFile: Financials 2021-22 with UDIN signed.pdf | 13 Feb 2024 |
| Financials 2022-23 with UDIN signedFile: Financials 2022-23 with UDIN signed.pdf | 13 Feb 2024 |
| FORM 1 CA RERAFile: FORM 1 CA RERA.pdf | 13 Feb 2024 |
| FORM 2 ARCH CERTFile: FORM 2 ARCH CERT.pdf | 13 Feb 2024 |
| FORM 3 ENGINEERFile: FORM 3 ENGINEER.pdf | 13 Feb 2024 |
| GUIDELINE BY SRFile: GUIDELINE BY SR.pdf | 13 Feb 2024 |
| ITR till 2022-23File: ITR till 2022-23.pdf | 13 Feb 2024 |
| KINGLIFE PROJECT SPECIFICATION SHEETFile: KINGLIFE PROJECT SPECIFICATION SHEET.pdf | 13 Feb 2024 |
| KSPCB for STPFile: KSPCB for STP.pdf | 13 Feb 2024 |
| LAND DOCUMENTSFile: LAND DOCUMENTS.pdf | 13 Feb 2024 |
| OLD SITE NO 152 RELEASE ORDER & ALLOTMENTFile: OLD SITE NO 152 RELEASE ORDER & ALLOTMENT.pdf | 13 Feb 2024 |
| VILLAGE MAP SHINIVAGALUFile: VILLAGE MAP SHINIVAGALU.pdf | 13 Feb 2024 |
| RTC, survey SITE NO. 152 | - |
| Mutation, survey SITE NO. 152 | - |
| Encumbrance Certificate, survey SITE NO. 152 | - |
| Sale/Title/Gift Deed, survey SITE NO. 152 | - |
| Khatha, survey SITE NO. 152 | - |
| Registration CertificateFile: CERTIFICATE OF INCORPORATION.pdf | - |
| Organization StructureFile: ORGANIZATION STRUCTURE.jpg | - |
| Certificate issued by CA Form 1File: FORM 1 CA CERTIFICATE RERA.pdf | - |
| Certificate issued by Architect Form 2File: FORM 2 ARCH CERT.pdf | - |
| Certificate issued by Engineer Form 3File: FORM 3 ENGINEER.pdf | - |
| Project Chartered Accountant | - |
| Project Engineer | - |
| Project Architect | - |
| AffidavitFile: AFFIDAVIT NON LITIGATION.pdf | - |
| Certificate from Chartered AccountFile: FORM 1 CA CERTIFICATE RERA.pdf | - |
| Balance Sheet 2022 - 2023File: ITR 2022-23.pdf | - |
| Balance Sheet 2021 - 2022File: ITR 2021-22.pdf | - |
| Balance Sheet 2020 - 2021File: ITR 2020-21.pdf | - |
| Audited Profit and Loss Statement 2022 - 2023File: ITR 2022-23.pdf | - |
| Audited Profit and Loss Statement 2021 - 2022File: ITR 2021-22.pdf | - |
| Audited Profit and Loss Statement 2020 - 2021File: ITR 2020-21.pdf | - |
| Director's Report 2022 - 2023File: ITR 2022-23.pdf | - |
| Director's Report 2021 - 2022File: ITR 2021-22.pdf | - |
| Director's Report 2020 - 2021File: ITR 2020-21.pdf | - |
| Cash Flow Statement 2022 - 2023File: ITR 2022-23.pdf | - |
| Cash Flow Statement 2021 - 2022File: ITR 2021-22.pdf | - |
| Auditor's Report 2022 - 2023File: ITR 2022-23.pdf | - |
| Auditor's Report 2021 - 2022File: ITR 2021-22.pdf | - |
| Auditor's Report 2020 - 2021File: ITR 2020-21.pdf | - |
| Income Tax Return Acknowledgement 2022 - 2023File: ITR 2022-23.pdf | - |
| Income Tax Return Acknowledgement 2021 - 2022File: ITR 2021-22.pdf | - |
| Income Tax Return Acknowledgement 2020 - 2021File: ITR 2020-21.pdf | - |
| BUILDING LICENSE LETTER | - |
| BESCOM WORK | - |
| BWSSB WORK ORDER | - |
| BUILDING PLAN | - |
| BUILDING PLAN | - |
| BUILDING PLAN | - |
| BUILDING PLAN | - |
| BUILDING PLAN | - |
| BUILDING LICENSE LETTER | - |
| BUILDING PLAN | - |
| OLD LAYOUT PLAN (SITE NO 152) | - |
| STABILITY CERTIFICATE | - |
| LEGAL OPINION | - |
| OLD TITLE DEED | - |
| OLD LAYOUT PLAN (SITE NO 152) | - |
| LAND DOCUMENTS | - |
| AFFIDAVIT FORM B | - |
| AFFIDAVIT SECTION 3 | - |
| BESCOM WORK | - |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep TELOSA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 13 registered projects within 2 km.
Sobha Infinia Phase 2B Block 4 W1 and Block 3
SOBHA LIMITED
SHRIRAM ESQUIRE
SHRIRAM PROPERTIES LIMITED
RADIANCE PLATINUM
Radiance Realty Developers India Limited
Sobha Infinia Phase 2A Block 5 Wing 5
SOBHA LIMITED
BELVOIR
KINGLIFE INFRA PRIVATE LIMITED
Prestige Park Grove
PRESTIGE PROJECTS PRIVATE LIMITED
See every Bengaluru Urban project, with the district possession charts
Builder: KINGLIFE INFRA PRIVATE LIMITED
KINGLIFE INFRA PRIVATE LIMITED has 2 registrations on RERA Karnataka, including TELOSA and BELVOIR. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if TELOSA is delayed beyond 31 Mar 2030?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of TELOSA?
The registered promoter entity is KINGLIFE INFRA PRIVATE LIMITED, a company as per the filing. Its CIN U70100KA2018PTC117218 and GSTIN 29AAHCK3067B1ZM can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in TELOSA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at TELOSA?
The professionals named in the filing: Architect: BRINDA KANNAN; Engineer: HARISH REDDY B; Chartered Accountant: GYANCHAND AGARWAL. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in TELOSA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback