Sobha Infinia Phase 2B Block 4 W1 and Block 3 W2
RG-KA-80122 · RERA PRM/KA/RERA/1251/446/PR/030824/006957 · Last updated on RERA Karnataka portal: 14 Oct 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
Sobha Infinia Phase 2B Block 4 W1 and Block 3 W2 is a Residential/Group Housing project by SOBHA LIMITED in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/030824/006957 on 3 Aug 2024. Possession is promised by 30 Dec 2030. 38 of the 150 units on this registration are recorded sold or booked, and 2 of 13 construction stages are filed complete.
At a glance
Project
- NameSobha Infinia Phase 2B Block 4 W1 and Block 3 W2
- TypeResidential/Group Housing
- Location
- Bengaluru East
- Bengaluru Urban
- 560034
- Pincode560034
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/446/PR/030824/006957
- ReraGenie IDRG-KA-80122
Builder
- NameSOBHA LIMITED
- Entity typeCompany
- CINL45201KA1995PLC018475
- GSTIN29AABCS7723E1ZB
- Authorized SignatoryPavithra G Kalmath
- Managing DirectorMr Jagadish Nangineni
- DirectorMr Jagadish Nangineni
- Project HeadMr Kishor Raj
- Other registrations119 more →
- No longer live8 withdrawn or revoked
- Declared earlier projects196 →
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on3 Aug 2024
- Promised completion30 Dec 2030
- Revised completionNone
- Buildings2 building records
- Documents filed218 files
Current status
Figures as on 14 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Wing 01 | - | - | - | 48 | 0 | 48 |
| Wing 02 | - | - | - | 102 | 0 | 102 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 14 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
2 of 13 construction stages are filed complete. The stage furthest along is Sub-structure flooring (Parking Floor, at 78%.
Building: 32% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 100% |
| Foundation footing work | 100% |
| Upto Plinth Level | 50% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 78% |
| Retaining wall (All types) | Not applicable |
| RCC or MS Framed structure | 50% |
| Masonry Construction | 13% |
| Plastering inside , outside & Ceiling | 14% |
| Joinery: Doors, Windows, Ventilators etc | 1% |
| Basic work of Water supply, Sanitary and Electrification | 1% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 3% |
| Railing and Grill fixing | 1% |
| Electrification, Water supply and Sanitary Finishing | 1% |
| Painting | 0% |
| Fire prevention and fire fighting fitting and fixture with network | Not applicable |
| Weather Proof work(tile,concrete) | Not applicable |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | Not applicable |
| Internal and External work including landscapes as per sanctioned drawings | Not applicable |
Progress on shared amenities40
As on 14 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 0% |
| Sewage and Drainage System | Yes | 0% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 0% |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Solid waste management and disposal | Yes | 0% |
| Emergency Evacuation services | Yes | 0% |
| Internal Roads & Footpaths | Yes | 0% |
| Electricity supply transformer and substation | Yes | 0% |
| Storm water drains | Yes | 3% |
| Use of renewable energy | No | Not applicable |
| Sewage Treatment Plant (STP) | Yes | 0% |
| Parks & Tree planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Electricity | Yes | 0% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | 0% |
| Club House | Yes | 0% |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | Yes | 0% |
| Indoor Sports facility | Yes | 0% |
| Swimming Pool | Yes | 0% |
| Gym | Yes | 0% |
| Parks | Yes | 0% |
| Power Backup | Yes | 0% |
| Piped Gas | Yes | 0% |
| Water and Sanitation | Yes | 0% |
| Air Conditioning | Yes | 0% |
| Staircases | Yes | 18% |
| Lifts | Yes | 0% |
| Corridor/Lobbies | Yes | 0% |
| Fire escapes | Yes | 5% |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | 5% |
| Basement | Yes | 13% |
| Terrace | Yes | 0% |
| Outer Wall | Yes | 0% |
| Open parking areas | No | Not applicable |
| Provision for lodging of management staff and security staff | Yes | 0% |
| Water conservation and renewable energy | No | Not applicable |
| Common storage spaces | No | Not applicable |
Land and ownership11
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Rajendra Patil | - | - |
| Pushpavathi R | - | - |
| Rajendra Patil | - | - |
| Rajendra Patil | - | - |
| Sangana Gouda Patil | - | - |
| Pushpavathi R | - | - |
| Pushpavathi R | - | - |
| Pushpavathi R | - | - |
| Pushpavathi R | - | - |
| Rajendra Patil | - | - |
| Sangana Gouda Patil | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 190.19 cr | Rs 42.05 cr |
| Payment of taxes | Rs 34.87 cr | Rs 1.65 cr |
| On-site expenditure-Site Overhead | Rs 19.02 cr | Rs 24.90 lakh |
| Principal sum and interest payable to financial institutions-Scheduled Banks | Rs 17.88 cr | Rs 18.34 lakh |
Certifying professionals and partners4
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Vinita Agast |
| Engineer | Mr. Srinivas Sathyanarayan |
| Engineer | Balakrishnan G |
| Chartered Accountant | Balaji D |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed218
As listed on the registration, under the names the promoter filed them with; the newest 80 of 218 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/030824/006957 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Infinia 2B C.pdf | 14 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Infinia 2B.pdf | 14 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Infinia 2B.pdf | 14 Oct 2026 |
| Q2 2026-27 Water supply and sewage board | 14 Oct 2026 |
| Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 14 Oct 2026 |
| Q2 2026-27 KPTCL- BESCOM | 14 Oct 2026 |
| Q2 2026-27 Fire and Safety | 14 Oct 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Infinia 2B.pdf | 13 Jul 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Infinia 2B.pdf | 13 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Infinia 2B.pdf | 13 Jul 2026 |
| Q1 2026-27 Water supply and sewage board | 13 Jul 2026 |
| Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 13 Jul 2026 |
| Q1 2026-27 KPTCL- BESCOM | 13 Jul 2026 |
| Q1 2026-27 Fire and Safety | 13 Jul 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Infinia 2B.pdf | 13 Apr 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Infinia 2B.pdf | 13 Apr 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Infinia 2B.pdf | 13 Apr 2026 |
| Q4 2025-26 Water supply and sewage board | 13 Apr 2026 |
| Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 13 Apr 2026 |
| Q4 2025-26 KPTCL- BESCOM | 13 Apr 2026 |
| Q4 2025-26 Fire and Safety | 13 Apr 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Infinia 2B C.pdf | 12 Jan 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Infinia 2B.pdf | 12 Jan 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Infinia 2B.pdf | 12 Jan 2026 |
| Q3 2025-26 Water supply and sewage board | 12 Jan 2026 |
| Q3 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 12 Jan 2026 |
| Q3 2025-26 KPTCL- BESCOM | 12 Jan 2026 |
| Q3 2025-26 Fire and Safety | 12 Jan 2026 |
| Infinia 2B Query Reply Ack 8241File: Infinia 2B Query Reply Ack 8241.pdf | 25 Jun 2024 |
| Directors list certified by Company SecretaryFile: 1 Directors list certified by Company Secretary.pdf | 25 Jun 2024 |
| Form-1 CA Sobha Infinia Phase 2B with directors detailsFile: 1 Form-1 CA Sobha Infinia Phase 2B with directors details.pdf | 25 Jun 2024 |
| Source of fund with cash flow statementFile: 3 Source of fund with cash flow statement.pdf | 25 Jun 2024 |
| Sale Deed Sy No 10File: 7 Sale Deed Sy No 10.pdf | 25 Jun 2024 |
| EC Sy No 7 2File: 8 EC Sy No 7 2.pdf | 25 Jun 2024 |
| EC Sy No 8 2File: 8 EC Sy No 8 2.pdf | 25 Jun 2024 |
| EC Sy No 9 10File: 8 EC Sy No 9 10.pdf | 25 Jun 2024 |
| EC Sy No 9 11File: 8 EC Sy No 9 11.pdf | 25 Jun 2024 |
| EC Sy No 9 12File: 8 EC Sy No 9 12.pdf | 25 Jun 2024 |
| Ec Sy No 9 13File: 8 Ec Sy No 9 13.pdf | 25 Jun 2024 |
| EC Sy No 9 14File: 8 EC Sy No 9 14.pdf | 25 Jun 2024 |
| EC Sy No 9 15File: 8 EC Sy No 9 15.pdf | 25 Jun 2024 |
| EC Sy No 9 16File: 8 EC Sy No 9 16.pdf | 25 Jun 2024 |
| EC Sy No 10File: 8 EC Sy No 10.pdf | 25 Jun 2024 |
| EC Sy No 55 2File: 8 EC Sy No 55 2.pdf | 25 Jun 2024 |
| Village MapFile: 11 Village Map.pdf | 25 Jun 2024 |
| CDP MapFile: 12 CDP Map.pdf | 25 Jun 2024 |
| ZR showing tank BufferFile: 16 ZR showing tank Buffer.pdf | 25 Jun 2024 |
| Elevation and sectionsFile: 17 Elevation and sections.pdf | 25 Jun 2024 |
| Site plan and Floor plansFile: 17 Site plan and Floor plans.pdf | 25 Jun 2024 |
| Site planFile: 17 Site plan.pdf | 25 Jun 2024 |
| BWSSB NOC with fee paid receiptFile: 18 BWSSB NOC with fee paid receipt.pdf | 25 Jun 2024 |
| BESCOM NOC with fee paid receiptFile: 19 BESCOM NOC with fee paid receipt.pdf | 25 Jun 2024 |
| AAI NOCFile: 20 AAI NOC.pdf | 25 Jun 2024 |
| Proforma for Agreement of SaleFile: 21 Proforma for Agreement of Sale.pdf | 25 Jun 2024 |
| Area statement 2 BFile: Area statement 2 B.pdf | 25 Jun 2024 |
| Carpet Area Phase 2B W1File: Carpet Area Phase 2B W1.pdf | 25 Jun 2024 |
| Carpet Area Phase 2B W2File: Carpet Area Phase 2B W2.pdf | 25 Jun 2024 |
| Co-Joint Development AgreementFile: Co-Joint Development Agreement.pdf | 25 Jun 2024 |
| Commencement Certificate - BBMPFile: Commencement Certificate - BBMP .pdf | 25 Jun 2024 |
| KSPCB 2B NOC number of units and plan unitsFile: KSPCB 2B NOC number of units and plan units.pdf | 25 Jun 2024 |
| Plan Sanction validity and NOCFile: Plan Sanction validity and NOC.pdf | 25 Jun 2024 |
| SEIAA 2B NOC number of unitsFile: SEIAA 2B NOC number of units.pdf | 25 Jun 2024 |
| single plot 2B ClarificationFile: single plot 2B Clarification.pdf | 25 Jun 2024 |
| RTC, survey 10 | - |
| Mutation, survey 10 | - |
| Encumbrance Certificate, survey 10 | - |
| Conversion/Alienation Order, survey 10 | - |
| JDA, survey 10 | - |
| Khatha, survey 10 | - |
| RTC, survey 55 | - |
| Mutation, survey 55 | - |
| Encumbrance Certificate, survey 55 | - |
| Conversion/Alienation Order, survey 55 | - |
| JDA, survey 55 | - |
| Khatha, survey 55 | - |
| RTC, survey 7/2 | - |
| Mutation, survey 7/2 | - |
| Encumbrance Certificate, survey 7/2 | - |
| Conversion/Alienation Order, survey 7/2 | - |
| JDA, survey 7/2 | - |
Promoter's earlier projects40
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Status | Promised | Delivered |
|---|---|---|---|---|
| SOBHA Crystal Meadows Phase 5 Wing 16 to 22 Litigation | Survey nos 64/1, 64/2, 64/3, 64/4, 65/2(P), 74, 75/1, 75/2, 75/3, 76/1(P), 76/2, 76/3, 78, 79, 80/1, 80/2, 80/3, 80/4, 80/5, 80/6, 81/1-81/11, 82/1, 82/2, 83/1, 83/2, 83/3, 83/4, 84, 85/1(P), 85/2(P), 85/3(P), 86/1A(P) Situated at Mullur village,Varthur Hobli, Bangalore East, 571442 | Ongoing | Dec 2035 | Not due yet |
| SOBHA Crystal Meadows Phase 4 Wing 23 to 28 Litigation | Survey nos 64/1, 64/2, 64/3, 64/4, 65/2(P), 74, 75/1, 75/2, 75/3, 76/1(P), 76/2, 76/3, 78, 79, 80/1, 80/2, 80/3, 80/4, 80/5, 80/6, 81/1-81/11, 82/1, 82/2, 83/1, 83/2, 83/3, 83/4, 84, 85/1(P), 85/2(P), 85/3(P), 86/1A(P) Situated at Mullur village,Varthur Hobli, Bangalore East, 571442 | Ongoing | Dec 2033 | Not due yet |
| SOBHA Crystal Meadows Phase 3 Wing 9 to 15 Litigation | Survey nos 64/1, 64/2, 64/3, 64/4, 65/2(P), 74, 75/1, 75/2, 75/3, 76/1(P), 76/2, 76/3, 78, 79, 80/1, 80/2, 80/3, 80/4, 80/5, 80/6, 81/1-81/11, 82/1, 82/2, 83/1, 83/2, 83/3, 83/4, 84, 85/1(P), 85/2(P), 85/3(P), 86/1A(P) Situated at Mullur village,Varthur Hobli, Bangalore East, 571442 | Ongoing | Dec 2032 | Not due yet |
| Sobha Neopolis Phase 5 - W 5, 6 & 7 | "Sobha Neopolis, Survey no 46/4, 46/7 (old no. 46/6), 46/8 (old no. 46/5), 47/3, (old no. 47/1), 47/5 ( old no. 47/1,) 47/6, 47/7, 49/1, 49/3, 49/6 & 50 , Panathur Village Varthur Hobli, Bengaluru, 560103" | Ongoing | Dec 2031 | Not due yet |
| Sobha Neopolis Phase 4 - 3, 4, 8 & 9 | "Sobha Neopolis, Survey no 46/4, 46/7 (old no. 46/6), 46/8 (old no. 46/5), 47/3, (old no. 47/1), 47/5 ( old no. 47/1,) 47/6, 47/7, 49/1, 49/3, 49/6 & 50 , Panathur Village Varthur Hobli, Bengaluru, 560103" | Ongoing | Dec 2031 | Not due yet |
| SOBHA Crystal Meadows Phase 2 Wing 7 and 8 Litigation | Survey nos 64/1, 64/2, 64/3, 64/4, 65/2(P), 74, 75/1, 75/2, 75/3, 76/1(P), 76/2, 76/3, 78, 79, 80/1, 80/2, 80/3, 80/4, 80/5, 80/6, 81/1-81/11, 82/1, 82/2, 83/1, 83/2, 83/3, 83/4, 84, 85/1(P), 85/2(P), 85/3(P), 86/1A(P) Situated at Mullur village,Varthur Hobli, Bangalore East, 571442 | Ongoing | Jun 2031 | Not due yet |
| Sobha Neopolis Phase 2 - W 12 & 13 | "Sobha Neopolis, Survey no 46/4, 46/7 (old no. 46/6), 46/8 (old no. 46/5), 47/3, (old no. 47/1), 47/5 ( old no. 47/1,) 47/6, 47/7, 49/1, 49/3, 49/6 & 50 , Panathur Village Varthur Hobli, Bengaluru, 560103" | Ongoing | Dec 2030 | Not due yet |
| Sobha Neopolis Phase 3 - W 1, 2, 10 & 11 | "Sobha Neopolis, Survey no 46/4, 46/7 (old no. 46/6), 46/8 (old no. 46/5), 47/3, (old no. 47/1), 47/5 ( old no. 47/1,) 47/6, 47/7, 49/1, 49/3, 49/6 & 50 , Panathur Village Varthur Hobli, Bengaluru, 560103" | Ongoing | Dec 2029 | Not due yet |
| SOBHA Crystal Meadows Phase 1 Wing 1 to 6 Litigation | Survey nos 64/1, 64/2, 64/3, 64/4, 65/2(P), 74, 75/1, 75/2, 75/3, 76/1(P), 76/2, 76/3, 78, 79, 80/1, 80/2, 80/3, 80/4, 80/5, 80/6, 81/1-81/11, 82/1, 82/2, 83/1, 83/2, 83/3, 83/4, 84, 85/1(P), 85/2(P), 85/3(P), 86/1A(P) Situated at Mullur village,Varthur Hobli, Bangalore East, 571442 | Ongoing | Dec 2029 | Not due yet |
| Sobha Brooklyn Towers - Town Park Phase 4, W4 | Sy nos - 51/1(P), 51/2(P), 52/1(P), 52/2(P)&53 at Yadavanahalli village, Attibele hobli, Anekal taluk, Bangalore, Karnataka | Ongoing | Jun 2029 | Not due yet |
| Sobha Brooklyn Towers - Town Park Phase 3, W5 | Sy nos - 51/1(P), 51/2(P), 52/1(P), 52/2(P)&53 at Yadavanahalli village, Attibele hobli, Anekal taluk, Bangalore, Karnataka | Ongoing | Jun 2029 | Not due yet |
| Sobha Royal crest Litigation | "PROPOSED RESIENTIAL APARMENT @ BBMP Katha no. 989/38/2, 38/4, 80/3, 37/1, 38/3, 80/2, 38/1, 35/3, 35/4, 37/2 , 38/5, 79, 80/1 @ HOSAKARAHALLI VILLAGE, UTTARAHALLI HOBLI, NEAR P.E.S COLLEGE,BANGALORE SOUTH TALUK., WARD NO 160, RAJARAJESHWARINAGAR ZONE" | Ongoing | Dec 2028 | Not due yet |
| Sobha Neopolis Phase 1 - W 14, 15, 16, 17, 18&19 | "Sobha Neopolis, Survey no 46/4, 46/7 (old no. 46/6), 46/8 (old no. 46/5), 47/3, (old no. 47/1), 47/5 ( old no. 47/1,) 47/6, 47/7, 49/1, 49/3, 49/6 & 50 , Panathur Village Varthur Hobli, Bengaluru, 560103" | Ongoing | Dec 2028 | Not due yet |
| Sobha Dream Gardens Phase 5 - Wing 10 Litigation | Survey No. 50, 51 & 54, Belahalli Village, Yelahanka Hobli | Ongoing | Dec 2028 | Not due yet |
| Sobha Dream Gardens Phase 4 - Wing 1 and 2 Litigation | Survey No. 50, 51 & 54, Belahalli Village, Yelahanka Hobli | Ongoing | Dec 2028 | Not due yet |
| Sobha Manhattan Towers-Town Park Phase 2 W 1 & 2 Litigation | Phase 1 at Sy.No.48/1A and 48/2, in the composite project Sobha Manhattan Towers - Town Park situated at Sy.Nos.48/1A, 48/2, 50/2 and 50/3, presently bearing Khata No.1877/48/1A-1881/50/2-1886/48/2-1913/50/3, situated at Yadavanahalli Village, Attibele Hobli, Anekal Taluk | Ongoing | Sep 2028 | Not due yet |
| Sobha Brooklyn Towers - Town Park Phase 5, W3 | Sy nos - 51/1(P), 51/2(P), 52/1(P), 52/2(P)&53 at Yadavanahalli village, Attibele hobli, Anekal taluk, Bangalore, Karnataka | Ongoing | Jun 2028 | Not due yet |
| Sobha Windsor Phase 4 Wing 9, 10 and 11 Litigation | Sy No. 107(P), 115/2, 115/3, 115/4, 115/5, 116/3 situated at Nagondanahalli village and Sy No. 30/1, 30/6, Situated at Hagadur Village, K.R.Puram Hobli | Ongoing | Mar 2028 | Not due yet |
| Sobha Victoria park phase 2 | "PROPOSED RESIDENTIAL DEVELOPMENT PROJECT AT SY.NO.47/1B,47/2B, KYALASANAHALLI VILLAGE , WARD NO.25, MAHADEVAPURA ZONE, K.R. PURAM HOBLI, BANGALORE " | Ongoing | Dec 2027 | Not due yet |
| Sobha Victoria park phase 1 | "PROPOSED RESIDENTIAL DEVELOPMENT PROJECT AT SY.NO.47/1B,47/2B, KYALASANAHALLI VILLAGE , WARD NO.25, MAHADEVAPURA ZONE, K.R. PURAM HOBLI, BANGALORE " | Ongoing | Dec 2027 | Not due yet |
| Sobha Sentosa Phase 4 Wing 1 and 2 | "PROPOSED RESIDENTIAL DEVELOPMENT PLAN AT SY NOS. 49/4 , 49/7, 50/2 (P) , 50/3 (P) , 50/4 (P) , 51/1 (P) , 51/2 B1(P) & 51/2B2 (P) AT BALAGERE, VARTHUR HOBLI, BANGALORE EAST, KARNATAKA " | Ongoing | Dec 2027 | Not due yet |
| Sobha Oakshire Phase 3 Wing 5,6,11 and 12 | Proposed residential building plan, Katha no. 80/73/3/74/2/75 (PID NO 150300200400520002), Sy nos 73/3, 74/2, 75 of Thimmegowdana Hosahalli village, Kasaba hobli,Devanahalli Taluk,Bangalore rural,562110 | Ongoing | Dec 2027 | Not due yet |
| Sobha Dream Gardens Phase 3 - Wing 3 and 4 Litigation | Survey No. 50, 51 & 54, Belahalli Village, Yelahanka Hobli | Ongoing | Dec 2027 | Not due yet |
| Sobha Brooklyn Towers - Town Park Phase 2, W2 | Sy nos - 51/1(P), 51/2(P), 52/1(P), 52/2(P)&53 at Yadavanahalli village, Attibele hobli, Anekal taluk, Bangalore, Karnataka | Ongoing | Dec 2027 | Not due yet |
| Sobha Brooklyn Towers - Town Park Phase 1, W1 | Sy nos - 51/1(P), 51/2(P), 52/1(P), 52/2(P)&53 at Yadavanahalli village, Attibele hobli, Anekal taluk, Bangalore, Karnataka | Ongoing | Dec 2027 | Not due yet |
| Sobha Windsor Phase 3 Wing 6, 7 and 8 Litigation | Sy No. 107(P), 115/2, 115/3, 115/4, 115/5, 116/3 situated at Nagondanahalli village and Sy No. 30/1, 30/6, Situated at Hagadur Village, K.R.Puram Hobli | Ongoing | Sep 2027 | Not due yet |
| Sobha City Athena Litigation | Property No 2091/40/7/1, 9/1, 9/2, 62/2, 62/3/1, Chokkanahalli Village, Ward No. 5, Jakkuru, Yelahanka Zone, Bengaluru | Ongoing | Sep 2027 | Not due yet |
| Sobha Sentosa Phase 3 Wing 3 and 4 | "PROPOSED RESIDENTIAL DEVELOPMENT PLAN AT SY NOS. 49/4 , 49/7, 50/2 (P) , 50/3 (P) , 50/4 (P) , 51/1 (P) , 51/2 B1(P) & 51/2B2 (P) AT BALAGERE, VARTHUR HOBLI, BANGALORE EAST, KARNATAKA " | Ongoing | Jun 2027 | Not due yet |
| Sobha Oakshire Phase 2 Wing 3,4,9 and 10 | Proposed residential building plan, Katha no. 80/73/3/74/2/75 (PID NO 150300200400520002), Sy nos 73/3, 74/2, 75 of Thimmegowdana Hosahalli village, Kasaba hobli,Devanahalli Taluk,Bangalore rural,562110 | Ongoing | Jun 2027 | Not due yet |
| Sobha Sentosa Phase 2 Wing 5 and 6 | "PROPOSED RESIDENTIAL DEVELOPMENT PLAN AT SY NOS. 49/4 , 49/7, 50/2 (P) , 50/3 (P) , 50/4 (P) , 51/1 (P) , 51/2 B1(P) & 51/2B2 (P) AT BALAGERE, VARTHUR HOBLI, BANGALORE EAST, KARNATAKA " | Ongoing | Dec 2026 | Not due yet |
| Sobha Oakshire Phase 1 Wing 1,2,7 and 8 | Proposed residential building plan, Katha no. 80/73/3/74/2/75 (PID NO 150300200400520002), Sy nos 73/3, 74/2, 75 of Thimmegowdana Hosahalli village, Kasaba hobli,Devanahalli Taluk,Bangalore rural,562110 | Ongoing | Dec 2026 | Not due yet |
| Sobha Manhattan Towers-Town Park Phase 1 W 4 & 5 Litigation | Phase 1 at Sy.No.48/1A and 48/2, in the composite project Sobha Manhattan Towers - Town Park situated at Sy.Nos.48/1A, 48/2, 50/2 and 50/3, presently bearing Khata No.1877/48/1A-1881/50/2-1886/48/2-1913/50/3, situated at Yadavanahalli Village, Attibele Hobli, Anekal Taluk | Ongoing | Dec 2026 | Not due yet |
| Sobha Galera | "SOBHA GALERA, SURVEY NO 45/4 OF HUSKUR VILLAGE, BIDARAHALLI HOBLI, BANGLAORE EAST TALUK SURVEY NO.116 OF AMANIDODDAKERE VILLAGE, KASABA HOBLI, HOSAKOTE TALUK, BANGALORE , BENGALURU EAST, BENGALURU URBAN, KARNATAKA - 560049" | Ongoing | Dec 2026 | Not due yet |
| Sobha Dream Acres - Oasis Phase 27 Wing 55, 56, 57 and 58 Litigation | Balagere, Bangalore | Ongoing | Sep 2026 | Not delivered |
| Sobha Sentosa Phase 1 Wing 7 | "PROPOSED RESIDENTIAL DEVELOPMENT PLAN AT SY NOS. 49/4 , 49/7, 50/2 (P) , 50/3 (P) , 50/4 (P) , 51/1 (P) , 51/2 B1(P) & 51/2B2 (P) AT BALAGERE, VARTHUR HOBLI, BANGALORE EAST, KARNATAKA " | Ongoing | Jun 2026 | Not delivered |
| Sobha Royal Pavilion Phase 8 - Wing 15 Litigation | Sy No. 54/3, 55/1, 55/2, 58/1, 58/2, 58/3, 59/2, 59/3, 59/4, 59/5, 60/2, 61, 63/1 Hadosiddapura Village, and Sy. No 31/1 Chikkannelli Village | Ongoing | Jun 2026 | Not delivered |
| Sobha Royal Pavilion Phase 7 - Wing 12, 13 and 14 Litigation | Sy No. 54/3, 55/1, 55/2, 58/1, 58/2, 58/3, 59/2, 59/3, 59/4, 59/5, 60/2, 61, 63/1 Hadosiddapura Village, and Sy. No 31/1 Chikkannelli Village | Ongoing | Jun 2026 | Not delivered |
| Sobha Royal Pavilion Phase 6 - Wing 10 and 11 Litigation | Sy No. 54/3, 55/1, 55/2, 58/1, 58/2, 58/3, 59/2, 59/3, 59/4, 59/5, 60/2, 61, 63/1 Hadosiddapura Village, and Sy. No 31/1 Chikkannelli Village | Ongoing | Jun 2026 | Not delivered |
| Sobha Royal Pavilion Phase 5 - Wing 8 and 9 Litigation | Sy No. 54/3, 55/1, 55/2, 58/1, 58/2, 58/3, 59/2, 59/3, 59/4, 59/5, 60/2, 61, 63/1 Hadosiddapura Village, and Sy. No 31/1 Chikkannelli Village | Ongoing | Jun 2026 | Not delivered |
| Sobha Windsor Phase 2 Wing 3, 4 and 5 Litigation | Sy No. 107(P), 115/2, 115/3, 115/4, 115/5, 116/3 situated at Nagondanahalli village and Sy No. 30/1, 30/6, Situated at Hagadur Village, K.R.Puram Hobli | Ongoing | Apr 2026 | Not delivered |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep Sobha Infinia Phase 2B Block 4 W1 and Block on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 12 registered projects within 2 km.
SHRIRAM ESQUIRE
SHRIRAM PROPERTIES LIMITED
RADIANCE PLATINUM
Radiance Realty Developers India Limited
Sobha Infinia Phase 2A Block 5 Wing 5
SOBHA LIMITED
BELVOIR
KINGLIFE INFRA PRIVATE LIMITED
TELOSA
KINGLIFE INFRA PRIVATE LIMITED
Prestige Park Grove
PRESTIGE PROJECTS PRIVATE LIMITED
See every Bengaluru Urban project, with the district possession charts
Builder: SOBHA LIMITED
SOBHA LIMITED has 120 registrations on RERA Karnataka, including Sobha Oakshire Phase 1 Wing 1,2,7 and 8 and Sobha Oakshire Phase 2 Wing 3,4,9 and 10. Its filings declare 196 earlier projects, 85 of them declared completed. Litigation is declared on 33 of its registrations. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if Sobha Infinia Phase 2B Block 4 W1 and Block 3 W2 is delayed beyond 30 Dec 2030?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of Sobha Infinia Phase 2B Block 4 W1 and Block 3 W2?
The registered promoter entity is SOBHA LIMITED, a company as per the filing. Its CIN L45201KA1995PLC018475 and GSTIN 29AABCS7723E1ZB can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in Sobha Infinia Phase 2B Block 4 W1 and Block 3 W2?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at Sobha Infinia Phase 2B Block 4 W1 and Block 3 W2?
The professionals named in the filing: Architect: Vinita Agast; Engineer: Mr. Srinivas Sathyanarayan; Engineer: Balakrishnan G; Chartered Accountant: Balaji D. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Sobha Infinia Phase 2B Block 4 W1 and Block 3 W2?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.