Home / Browse projects / Bengaluru Urban, Karnataka / RADIANCE PLATINUM
RADIANCE PLATINUM
By Radiance Realty Developers India Limited
RG-KA-42991 · RERA PRM/KA/RERA/1251/310/PR/060824/006962 · Last updated on RERA Karnataka portal: 13 Oct 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
RADIANCE PLATINUM is a Residential/Group Housing project by Radiance Realty Developers India Limited in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/060824/006962 on 6 Aug 2024. Possession is promised by 31 Aug 2029. 61 of the 62 units on this registration are recorded sold or booked, and 5 of 17 construction stages are filed complete.
At a glance
Project
- NameRADIANCE PLATINUM
- TypeResidential/Group Housing
- Location
- Bengaluru South
- Bengaluru Urban
- 560034
- Pincode560034
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/310/PR/060824/006962
- ReraGenie IDRG-KA-42991
Builder
- NameRadiance Realty Developers India Limited
- Entity typeCompany
- CINU45201TN2007PLC062662
- GSTIN29AACCN5152H1ZE
- Authorized SignatoryR Vinayagamurthy
- Managing DirectorVarun Manian
- DirectorsVarun Manian, G Panchapagesan, Joe Benjamin F, Sneha G Bhat, Tenvi Anand
- Project HeadR Vinayagamurthy
- Other registrations5 more →
- Declared earlier projects12 →
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on6 Aug 2024
- Promised completion31 Aug 2029
- Revised completionNone
- Buildings2 building records
- Documents filed187 files
Current status
Figures as on 13 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Block A | - | - | - | 26 | 0 | 26 |
| Block B | - | - | - | 36 | 0 | 36 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 13 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 17 construction stages are filed complete. The stage furthest along is RCC or MS Framed structure, at 98%.
Building: 95% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 100% |
| Foundation footing work | 100% |
| Upto Plinth Level | 100% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 100% |
| Retaining wall (All types) | 100% |
| RCC or MS Framed structure | 98% |
| Masonry Construction | 98% |
| Plastering inside , outside & Ceiling | 98% |
| Joinery: Doors, Windows, Ventilators etc | 95% |
| Basic work of Water supply, Sanitary and Electrification | 95% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 95% |
| Railing and Grill fixing | 85% |
| Electrification, Water supply and Sanitary Finishing | 95% |
| Painting | 90% |
| Fire prevention and fire fighting fitting and fixture with network | Not applicable |
| Weather Proof work(tile,concrete) | 90% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | 80% |
| Internal and External work including landscapes as per sanctioned drawings | 90% |
Progress on shared amenities40
As on 13 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 90% |
| Sewage and Drainage System | No | Not applicable |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 89% |
| Energy management | Yes | 88% |
| Fire protection and fire safety requirements | Yes | 87% |
| Solid waste management and disposal | No | Not applicable |
| Emergency Evacuation services | Yes | 88% |
| Internal Roads & Footpaths | Yes | 90% |
| Electricity supply transformer and substation | No | Not applicable |
| Storm water drains | Yes | 90% |
| Use of renewable energy | No | Not applicable |
| Sewage Treatment Plant (STP) | Yes | 90% |
| Parks & Tree planting | Yes | 88% |
| Street Lighting | Yes | 88% |
| Electricity | Yes | 90% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | No | Not applicable |
| Club House | No | Not applicable |
| Community Hall | Yes | 90% |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | Yes | 90% |
| Swimming Pool | Yes | 90% |
| Gym | Yes | 90% |
| Parks | No | Not applicable |
| Power Backup | Yes | 90% |
| Piped Gas | No | Not applicable |
| Water and Sanitation | Yes | 90% |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | 95% |
| Lifts | Yes | 95% |
| Corridor/Lobbies | Yes | 95% |
| Fire escapes | Yes | 88% |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | 88% |
| Basement | Yes | 98% |
| Terrace | Yes | 95% |
| Outer Wall | Yes | 95% |
| Open parking areas | Yes | 85% |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | No | Not applicable |
| Common storage spaces | No | Not applicable |
Land and ownership1
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Radiance Realty Developers India Limited | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 59.24 cr | Rs 6.92 cr |
| Interest on borrowings towards land | Rs 21.10 cr | - |
| Interest on borrowings towards construction | Rs 5.03 cr | - |
| On-site expenditure-Site Overhead | - | Rs 5.30 cr |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | S Muralidharan |
| Engineer | Sahana G |
| Chartered Accountant | Vinay Tyagaraj |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed187
As listed on the registration, under the names the promoter filed them with; the newest 80 of 187 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/060824/006962 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form 4 CA Certificate QU Sep 26.pdf | 13 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Form 5 Architect Certificate QU Sep 26.pdf | 13 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form 6 Engineer Certificate QU Sep 26.pdf | 13 Oct 2026 |
| Q2 2026-27 Water supply and sewage board | 13 Oct 2026 |
| Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 13 Oct 2026 |
| Q2 2026-27 KPTCL- BESCOM | 13 Oct 2026 |
| Q2 2026-27 Fire and Safety | 13 Oct 2026 |
| Q2 2026-27 Airport Authority of India | 13 Oct 2026 |
| Q2 2026-27 BSNL/Telecommunication Department | 13 Oct 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form 4 CA Certificate QU June 26.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Form 5 Architect Certificate QU June 26.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form 6 Engineer Certificate QU June 26.pdf | 15 Jul 2026 |
| Q1 2026-27 Water supply and sewage board | 15 Jul 2026 |
| Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 15 Jul 2026 |
| Q1 2026-27 KPTCL- BESCOM | 15 Jul 2026 |
| Q1 2026-27 Fire and Safety | 15 Jul 2026 |
| Q1 2026-27 Airport Authority of India | 15 Jul 2026 |
| Q1 2026-27 BSNL/Telecommunication Department | 15 Jul 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4 CA Certificate QU March 26.pdf | 15 Apr 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Form 5 Architect Certificate QU March 26.pdf | 15 Apr 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form 6 Engineer Certificate QU March 26.pdf | 15 Apr 2026 |
| Q4 2025-26 Water supply and sewage board | 15 Apr 2026 |
| Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 15 Apr 2026 |
| Q4 2025-26 KPTCL- BESCOM | 15 Apr 2026 |
| Q4 2025-26 Fire and Safety | 15 Apr 2026 |
| Q4 2025-26 Airport Authority of India | 15 Apr 2026 |
| Q4 2025-26 BSNL/Telecommunication Department | 15 Apr 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4 CA Certificate QU Dec 25.pdf | 14 Jan 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Form 5 Architect Certificate QU Dec 25.pdf | 14 Jan 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form 6 Engineer Certificate - QU Dec 25.pdf | 14 Jan 2026 |
| Q3 2025-26 Water supply and sewage board | 14 Jan 2026 |
| Q3 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 14 Jan 2026 |
| Q3 2025-26 KPTCL- BESCOM | 14 Jan 2026 |
| Q3 2025-26 Fire and Safety | 14 Jan 2026 |
| Q3 2025-26 Airport Authority of India | 14 Jan 2026 |
| Q3 2025-26 BSNL/Telecommunication Department | 14 Jan 2026 |
| Notification dated 12-01-1983File: 1 Notification dated 12-01-1983.pdf | 22 Jul 2024 |
| Final NotificationFile: 1 Final Notification.pdf | 22 Jul 2024 |
| Notification dated 21-10-1988File: 1 Notification dated 21-10-1988.pdf | 22 Jul 2024 |
| Reply to QueryFile: Reply to Query.pdf | 16 Jul 2024 |
| Balance SheetFile: Balance Sheet.pdf | 16 Jul 2024 |
| Schedules for Balance SheetFile: Schedules for Balance Sheet.pdf | 16 Jul 2024 |
| PL 2022-23File: PL 2022-23.pdf | 16 Jul 2024 |
| Directors Report 2022-23File: Directors Report 2022-23.pdf | 16 Jul 2024 |
| Cash flow 2022-23File: Cash flow 2022-23.pdf | 16 Jul 2024 |
| Auditors Report FY 2022-23File: Auditors Report 2022-23.pdf | 16 Jul 2024 |
| ITR AY 2023-24File: ITR AY 2023-24.pdf | 16 Jul 2024 |
| Certificate of IncorporationFile: 2 Certificate of Incorporation.pdf | 16 Jul 2024 |
| Sale Deed to RadianceFile: 3 Sale Deed to Radiance.pdf | 16 Jul 2024 |
| Title Deed Site No 165File: 6 Title Deed Site No 165.pdf | 16 Jul 2024 |
| ZR Showing Nala BufferFile: 9 ZR Showing Nala Buffer.pdf | 16 Jul 2024 |
| Basement Floor PlanFile: 10 Basement Floor Plan.pdf | 16 Jul 2024 |
| ElevationFile: 10 Elevation.pdf | 16 Jul 2024 |
| First Floor PlanFile: 10 First Floor Plan.pdf | 16 Jul 2024 |
| Ground Floor PlanFile: 10 Ground Floor Plan.pdf | 16 Jul 2024 |
| Second Floor PlanFile: 10 Second Floor Plan.pdf | 16 Jul 2024 |
| Site PlanFile: 10 Site Plan.pdf | 16 Jul 2024 |
| Terrace Floor PlanFile: 10 Terrace Floor Plan.pdf | 16 Jul 2024 |
| Third Floor PlanFile: 10 Third Floor Plan.pdf | 16 Jul 2024 |
| Typical Floor Plan 4th, 6th, 8th,10th and 12th levelsFile: 10 Typical Floor Plan 4th, 6th, 8th,10th and 12th levels.pdf | 16 Jul 2024 |
| Typical Floor Plan 5th, 7th, 9th, 11th and 13th levelsFile: 10 Typical Floor Plan 5th, 7th, 9th, 11th and 13th levels.pdf | 16 Jul 2024 |
| Section AAFile: 10 Section AA.pdf | 16 Jul 2024 |
| Section BBFile: 10 Section BB.pdf | 16 Jul 2024 |
| North Side ElevationFile: 10 North Side Elevation.pdf | 16 Jul 2024 |
| Sensitive Zone DeclarationFile: 11 Sensitive Zone Declaration.pdf | 16 Jul 2024 |
| Non Litigation AffidavitFile: 7 Non Litigation Affidavit.pdf | 16 Jul 2024 |
| Registration CertificateFile: Certificate of Incorporation.pdf | - |
| Memorandum of AssociationFile: Company MOA.pdf | - |
| Article of AssociationFile: Company AOA.pdf | - |
| Organization StructureFile: Organisation Structure.pdf | - |
| Certificate issued by CA Form 1File: Form 1 CA Certificate & loan utilisation certificate.pdf | - |
| Certificate issued by Architect Form 2File: Form 2 Architect Certificate.pdf | - |
| Certificate issued by Engineer Form 3File: Form 3 Engineer Certificate.pdf | - |
| Project Chartered Accountant | - |
| Project Engineer | - |
| Project Architect | - |
| AffidavitFile: Non Litigation Affidavit.pdf | - |
| Certificate from Chartered AccountFile: Form 1 CA Certificate & loan utilisation certificate.pdf | - |
| Balance Sheet 2022 - 2023File: BS with Schedule 2022-23.pdf | - |
| Balance Sheet 2021 - 2022File: BS with Schedules 2021-22.pdf | - |
Promoter's earlier projects5
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Status | Promised | Delivered |
|---|---|---|---|---|
| RADIANCE FLORESTA | Sy No 57/2 (P), Chikagubbi Village , Bidarahalli Hobli, Bangalore East Taluk , Sy No 57/2 (P), Chikagubbi Village , Bengaluru East | Ongoing | May 2028 | Not due yet |
| RADIANCE BLOSSOM PHASE- II | Radiance Realty Developers India Limited, 167/1A,167/1B,167/1C & 128/P10, , Village Mandur,Taluka Bangalore East | Ongoing | Dec 2024 | Not delivered |
| RADIANCE IRIS | Sy. 29/3B, 4B, 5 & 6, Sampigehalli Village, Near Jakkur | Completed | - | No date filed |
| RADIANCE EMERALD | Sy No 167/2, 168/1A, 168/1B, 168/1C, 168/2, MANDUR VILLAGE, BUDHIGERE ROAD, BIDARAHALLI HOBLI | Completed | - | No date filed |
| RADIANCE BLOSSOM | SY NO’S. 167/2,168/1A, 168/1B, 168/1C, 168/2. MANDUR VILLAGE, BIDARAHALLI HOBLI, BANGALORE EAST TALUK | Completed | - | No date filed |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep RADIANCE PLATINUM on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 12 registered projects within 2 km.
Sobha Infinia Phase 2B Block 4 W1 and Block 3
SOBHA LIMITED
SHRIRAM ESQUIRE
SHRIRAM PROPERTIES LIMITED
Sobha Infinia Phase 2A Block 5 Wing 5
SOBHA LIMITED
BELVOIR
KINGLIFE INFRA PRIVATE LIMITED
TELOSA
KINGLIFE INFRA PRIVATE LIMITED
Prestige Park Grove
PRESTIGE PROJECTS PRIVATE LIMITED
See every Bengaluru Urban project, with the district possession charts
Builder: Radiance Realty Developers India Limited
RADIANCE REALTY DEVELOPERS INDIA LIMITED has 6 registrations on RERA Karnataka, including RADIANCE BLOSSOM PHASE- II and Radiance Emerald. Its filings declare 12 earlier projects, 8 of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if RADIANCE PLATINUM is delayed beyond 31 Aug 2029?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of RADIANCE PLATINUM?
The registered promoter entity is Radiance Realty Developers India Limited, a company as per the filing. Its CIN U45201TN2007PLC062662 and GSTIN 29AACCN5152H1ZE can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in RADIANCE PLATINUM?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at RADIANCE PLATINUM?
The professionals named in the filing: Architect: S Muralidharan; Engineer: Sahana G; Chartered Accountant: Vinay Tyagaraj. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in RADIANCE PLATINUM?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.