Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Jun 2030Possession promisedno revision filed
3 of 18Construction stages donefurthest along: RCC or MS Framed structure, 45%
26 of 46Units unsoldnot recorded sold or booked
0Complaints at RERA Karnatakaon this registration
Jump to the 222 documents Report an error

Sobha Infinia Phase 2A Block 5 Wing 5 is a Residential/Group Housing project by SOBHA LIMITED in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/030824/006956 on 3 Aug 2024. Possession is promised by 30 Jun 2030. 20 of the 46 units on this registration are recorded sold or booked, and 3 of 18 construction stages are filed complete.

At a glance

Project

  • NameSobha Infinia Phase 2A Block 5 Wing 5
  • TypeResidential/Group Housing
  • Location
    • Bengaluru East
    • Bengaluru Urban
    • 560034
  • Pincode560034
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/446/PR/030824/006956
  • ReraGenie IDRG-KA-59940

Builder

  • NameSOBHA LIMITED
  • Entity typeCompany
  • CINL45201KA1995PLC018475
  • GSTIN29AABCS7723E1ZB
  • Authorized SignatoryPavithra G Kalmath
  • Managing DirectorMr Jagadish Nangineni
  • DirectorMr Jagadish Nangineni
  • Project HeadMr Kishor Raj
  • Other registrations119 more →
  • No longer live8 withdrawn or revoked
  • Declared earlier projects196 →

Key dates

this monthRegisteredAug 2024PromisedJun 2030

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on3 Aug 2024
  • Promised completion30 Jun 2030
  • Revised completionNone
  • Buildings1 building record
  • Documents filed222 files

Current status

43%20 of 46 units booked
26.7%Of the estimated cost spent so far

Figures as on 14 Oct 2026, this project's latest RERA Karnataka filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
PHASE 2A (WING 5)---46046

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 14 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 18 construction stages are filed complete. The stage furthest along is RCC or MS Framed structure, at 45%.

Building: 19% average across the applicable activities

ActivityProgress
Earth work and other leveling preparation work100%
Foundation footing work100%
Upto Plinth Level100%
Sub-structure flooring (Parking Floor, more than one floor below general ground level)0%
Retaining wall (All types)Not applicable
RCC or MS Framed structure45%
Masonry Construction5%
Plastering inside , outside & Ceiling0%
Joinery: Doors, Windows, Ventilators etc0%
Basic work of Water supply, Sanitary and Electrification0%
Dadoing, Skirting, Flooring, Tiles work (All types)0%
Railing and Grill fixing0%
Electrification, Water supply and Sanitary Finishing0%
Painting0%
Fire prevention and fire fighting fitting and fixture with network0%
Weather Proof work(tile,concrete)0%
Wardrobe, Showcase, Kitchen cabinet, Puja work0%
Elevation work0%
Internal and External work including landscapes as per sanctioned drawings0%

Progress on shared amenities40

As on 14 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes0%
Sewage and Drainage SystemYes0%
Water conservation/rain water harvesting/recharge of ground waterYes0%
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes0%
Solid waste management and disposalYes0%
Emergency Evacuation servicesYes0%
Internal Roads & FootpathsYes0%
Electricity supply transformer and substationYes0%
Storm water drainsYes0%
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)Yes0%
Parks & Tree plantingYes0%
Street LightingYes0%
ElectricityYes0%
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes0%
Club HouseYes0%
Community HallNoNot applicable
Outdoor Sports facilityYes0%
Indoor Sports facilityYes0%
Swimming PoolYes0%
GymYes0%
ParksYes0%
Power BackupYes0%
Piped GasYes0%
Water and SanitationYes0%
Air ConditioningYes0%
StaircasesYes0%
LiftsYes0%
Corridor/LobbiesYes0%
Fire escapesYes0%
Common entrance and exit for the building/common portico/foyer/verandahYes0%
BasementYes0%
TerraceYes0%
Outer WallYes0%
Open parking areasNoNot applicable
Provision for lodging of management staff and security staffYes0%
Water conservation and renewable energyNoNot applicable
Common storage spacesNoNot applicable

Land and ownership11

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,190 sq m
Named landowners11
LandownerVillageDistrict
Rajendra Patil--
Rajendra Patil--
Sangana Gouda Patil--
R Pushpavathi--
R Pushpavathi--
R Pushpavathi--
R Pushpavathi--
Rajendra Patil--
Sangana Gouda Patil--
Rajendra Patil--
R Pushpavathi--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 60.34 cr
Cost incurredRs 16.12 cr
Spent of the estimate26.71%
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 43.81 crRs 12.85 cr
Payment of taxesRs 8.03 crRs 1.14 cr
On-site expenditure-Salaries of workersRs 4.38 cr-
Principal sum and interest payable to financial institutions-Scheduled BanksRs 4.12 crRs 2.12 cr
On-site expenditure-Site Overhead-Rs 55,000

Certifying professionals and partners4

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVinita Agast
EngineerMr. Srinivas Sathyanarayan
EngineerBalakrishnan G
Chartered AccountantBalaji D

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed222

As listed on the registration, under the names the promoter filed them with; the newest 80 of 222 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/030824/006956 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Infinia 2A C.pdf14 Oct 2026
Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Infinia 2A.pdf14 Oct 2026
Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Infinia 2A.pdf14 Oct 2026
Q2 2026-27 Water supply and sewage board14 Oct 2026
Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres)14 Oct 2026
Q2 2026-27 KPTCL- BESCOM14 Oct 2026
Q2 2026-27 Fire and Safety14 Oct 2026
Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Infinia 2A.pdf13 Jul 2026
Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Infinia 2A.pdf13 Jul 2026
Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Infinia 2A.pdf13 Jul 2026
Q1 2026-27 Water supply and sewage board13 Jul 2026
Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres)13 Jul 2026
Q1 2026-27 KPTCL- BESCOM13 Jul 2026
Q1 2026-27 Fire and Safety13 Jul 2026
Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Infinia 2A.pdf13 Apr 2026
Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Infinia 2A.pdf13 Apr 2026
Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Infinia 2A.pdf13 Apr 2026
Q4 2025-26 Water supply and sewage board13 Apr 2026
Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres)13 Apr 2026
Q4 2025-26 KPTCL- BESCOM13 Apr 2026
Q4 2025-26 Fire and Safety13 Apr 2026
Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Infinia 2A C.pdf12 Jan 2026
Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Infinia 2A.pdf12 Jan 2026
Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Infinia 2A.pdf12 Jan 2026
Q3 2025-26 Water supply and sewage board12 Jan 2026
Q3 2025-26 KSPCB- PCB (10 Acres to 125 Acres)12 Jan 2026
Q3 2025-26 KPTCL- BESCOM12 Jan 2026
Q3 2025-26 Fire and Safety12 Jan 2026
Infinia 2A Query Reply Ack 8242File: Infinia 2A Query Ack 8242.pdf25 Jun 2024
Directors list - Company Secretary CertificateFile: 1 Directors list - Company Secretary Certificate.pdf25 Jun 2024
Source of fund with Cash flow statementFile: 3 Source of fund with Cash flow statement.pdf25 Jun 2024
CA Certificate - Sobha Infinia 2 A with directors detailsFile: 5 CA Certificate - Sobha Infinia 2 A with directors details.pdf25 Jun 2024
Sale Deed Sy No 10File: 7 Sale Deed Sy No 10.pdf25 Jun 2024
EC Sy No 7 2File: 8 EC Sy No 7 2.pdf25 Jun 2024
EC Sy No 8 2File: 8 EC Sy No 8 2.pdf25 Jun 2024
EC Sy No 9 10File: 8 EC Sy No 9 10.pdf25 Jun 2024
EC Sy No 9 11File: 8 EC Sy No 9 11.pdf25 Jun 2024
EC Sy No 9 12File: 8 EC Sy No 9 12.pdf25 Jun 2024
Ec Sy No 9 13File: 8 Ec Sy No 9 13.pdf25 Jun 2024
EC Sy No 9 14File: 8 EC Sy No 9 14.pdf25 Jun 2024
EC Sy No 9 15File: 8 EC Sy No 9 15.pdf25 Jun 2024
EC Sy No 9 16File: 8 EC Sy No 9 16.pdf25 Jun 2024
EC Sy No 10File: 8 EC Sy No 10.pdf25 Jun 2024
EC Sy No 55 2File: 8 EC Sy No 55 2.pdf25 Jun 2024
Certified Carpet Area calculationFile: 13 Certified Carpet Area calculation.pdf25 Jun 2024
CDP MapFile: 14 CDP Map.pdf25 Jun 2024
Village MapFile: 15 Village Map.pdf25 Jun 2024
ZR showing Nala BufferFile: 18 ZR showing Nala Buffer.pdf25 Jun 2024
Elevation and sectionsFile: 19 Elevation and sections.pdf25 Jun 2024
Site plan and Floor plansFile: 19 Site plan and Floor plans.pdf25 Jun 2024
BWSSB NOC with fee paid receiptFile: 20 BWSSB NOC with fee paid receipt.pdf25 Jun 2024
BESCOM NOC with fee paid receiptFile: 21 BESCOM NOC with fee paid receipt.pdf25 Jun 2024
AAI NOCFile: 22 AAI NOC.pdf25 Jun 2024
Proforma of Agreement for SaleFile: 23 Proforma of Agreement for Sale.pdf25 Jun 2024
HAL NOCFile: 24 HAL NOC.PDF25 Jun 2024
Area statement 2A units and built up area matching with planFile: Area statement 2A units and built up area matching with plan.pdf25 Jun 2024
Co-Joint Development AgreementFile: Co-Joint Development Agreement.pdf25 Jun 2024
Commencement Certificate - BBMPFile: Commencement Certificate - BBMP .pdf25 Jun 2024
KSPCB NOC units and Built up AreaFile: KSPCB NOC units and Built up Area.pdf25 Jun 2024
NA Single plot layoutFile: NA Single plot layout.pdf25 Jun 2024
NOCs Renewal explainationFile: NOCs Renewal explaination.pdf25 Jun 2024
SEIAA 2A NOC units and Built up AreaFile: SEIAA 2A NOC units and Built up Area.pdf25 Jun 2024
single plot 2A explainationFile: single plot 2A explaination.pdf25 Jun 2024
Zonal Regulation 2007- refer page 40File: Zonal Regulation 2007- refer page 40.pdf25 Jun 2024
RTC, survey 7/2-
Mutation, survey 7/2-
Encumbrance Certificate, survey 7/2-
Conversion/Alienation Order, survey 7/2-
JDA, survey 7/2-
Khatha, survey 7/2-
RTC, survey 8/2-
Mutation, survey 8/2-
Encumbrance Certificate, survey 8/2-
Conversion/Alienation Order, survey 8/2-
JDA, survey 8/2-
Khatha, survey 8/2-
RTC, survey 9/10-
Mutation, survey 9/10-
Encumbrance Certificate, survey 9/10-
Conversion/Alienation Order, survey 9/10-

Promoter's earlier projects40

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

17 not delivered by the promised date33 under way, not due yet50 declared completed, no finish date filed
ProjectLocationStatusPromisedDelivered
SOBHA Crystal Meadows Phase 5 Wing 16 to 22 LitigationSurvey nos 64/1, 64/2, 64/3, 64/4, 65/2(P), 74, 75/1, 75/2, 75/3, 76/1(P), 76/2, 76/3, 78, 79, 80/1, 80/2, 80/3, 80/4, 80/5, 80/6, 81/1-81/11, 82/1, 82/2, 83/1, 83/2, 83/3, 83/4, 84, 85/1(P), 85/2(P), 85/3(P), 86/1A(P) Situated at Mullur village,Varthur Hobli, Bangalore East, 571442OngoingDec 2035Not due yet
SOBHA Crystal Meadows Phase 4 Wing 23 to 28 LitigationSurvey nos 64/1, 64/2, 64/3, 64/4, 65/2(P), 74, 75/1, 75/2, 75/3, 76/1(P), 76/2, 76/3, 78, 79, 80/1, 80/2, 80/3, 80/4, 80/5, 80/6, 81/1-81/11, 82/1, 82/2, 83/1, 83/2, 83/3, 83/4, 84, 85/1(P), 85/2(P), 85/3(P), 86/1A(P) Situated at Mullur village,Varthur Hobli, Bangalore East, 571442OngoingDec 2033Not due yet
SOBHA Crystal Meadows Phase 3 Wing 9 to 15 LitigationSurvey nos 64/1, 64/2, 64/3, 64/4, 65/2(P), 74, 75/1, 75/2, 75/3, 76/1(P), 76/2, 76/3, 78, 79, 80/1, 80/2, 80/3, 80/4, 80/5, 80/6, 81/1-81/11, 82/1, 82/2, 83/1, 83/2, 83/3, 83/4, 84, 85/1(P), 85/2(P), 85/3(P), 86/1A(P) Situated at Mullur village,Varthur Hobli, Bangalore East, 571442OngoingDec 2032Not due yet
Sobha Neopolis Phase 5 - W 5, 6 & 7"Sobha Neopolis, Survey no 46/4, 46/7 (old no. 46/6), 46/8 (old no. 46/5), 47/3, (old no. 47/1), 47/5 ( old no. 47/1,) 47/6, 47/7, 49/1, 49/3, 49/6 & 50 , Panathur Village Varthur Hobli, Bengaluru, 560103"OngoingDec 2031Not due yet
Sobha Neopolis Phase 4 - 3, 4, 8 & 9"Sobha Neopolis, Survey no 46/4, 46/7 (old no. 46/6), 46/8 (old no. 46/5), 47/3, (old no. 47/1), 47/5 ( old no. 47/1,) 47/6, 47/7, 49/1, 49/3, 49/6 & 50 , Panathur Village Varthur Hobli, Bengaluru, 560103"OngoingDec 2031Not due yet
SOBHA Crystal Meadows Phase 2 Wing 7 and 8 LitigationSurvey nos 64/1, 64/2, 64/3, 64/4, 65/2(P), 74, 75/1, 75/2, 75/3, 76/1(P), 76/2, 76/3, 78, 79, 80/1, 80/2, 80/3, 80/4, 80/5, 80/6, 81/1-81/11, 82/1, 82/2, 83/1, 83/2, 83/3, 83/4, 84, 85/1(P), 85/2(P), 85/3(P), 86/1A(P) Situated at Mullur village,Varthur Hobli, Bangalore East, 571442OngoingJun 2031Not due yet
Sobha Neopolis Phase 2 - W 12 & 13"Sobha Neopolis, Survey no 46/4, 46/7 (old no. 46/6), 46/8 (old no. 46/5), 47/3, (old no. 47/1), 47/5 ( old no. 47/1,) 47/6, 47/7, 49/1, 49/3, 49/6 & 50 , Panathur Village Varthur Hobli, Bengaluru, 560103"OngoingDec 2030Not due yet
Sobha Neopolis Phase 3 - W 1, 2, 10 & 11"Sobha Neopolis, Survey no 46/4, 46/7 (old no. 46/6), 46/8 (old no. 46/5), 47/3, (old no. 47/1), 47/5 ( old no. 47/1,) 47/6, 47/7, 49/1, 49/3, 49/6 & 50 , Panathur Village Varthur Hobli, Bengaluru, 560103"OngoingDec 2029Not due yet
SOBHA Crystal Meadows Phase 1 Wing 1 to 6 LitigationSurvey nos 64/1, 64/2, 64/3, 64/4, 65/2(P), 74, 75/1, 75/2, 75/3, 76/1(P), 76/2, 76/3, 78, 79, 80/1, 80/2, 80/3, 80/4, 80/5, 80/6, 81/1-81/11, 82/1, 82/2, 83/1, 83/2, 83/3, 83/4, 84, 85/1(P), 85/2(P), 85/3(P), 86/1A(P) Situated at Mullur village,Varthur Hobli, Bangalore East, 571442OngoingDec 2029Not due yet
Sobha Brooklyn Towers - Town Park Phase 4, W4Sy nos - 51/1(P), 51/2(P), 52/1(P), 52/2(P)&53 at Yadavanahalli village, Attibele hobli, Anekal taluk, Bangalore, KarnatakaOngoingJun 2029Not due yet
Sobha Brooklyn Towers - Town Park Phase 3, W5Sy nos - 51/1(P), 51/2(P), 52/1(P), 52/2(P)&53 at Yadavanahalli village, Attibele hobli, Anekal taluk, Bangalore, KarnatakaOngoingJun 2029Not due yet
Sobha Royal crest Litigation"PROPOSED RESIENTIAL APARMENT @ BBMP Katha no. 989/38/2, 38/4, 80/3, 37/1, 38/3, 80/2, 38/1, 35/3, 35/4, 37/2 , 38/5, 79, 80/1 @ HOSAKARAHALLI VILLAGE, UTTARAHALLI HOBLI, NEAR P.E.S COLLEGE,BANGALORE SOUTH TALUK., WARD NO 160, RAJARAJESHWARINAGAR ZONE"OngoingDec 2028Not due yet
Sobha Neopolis Phase 1 - W 14, 15, 16, 17, 18&19"Sobha Neopolis, Survey no 46/4, 46/7 (old no. 46/6), 46/8 (old no. 46/5), 47/3, (old no. 47/1), 47/5 ( old no. 47/1,) 47/6, 47/7, 49/1, 49/3, 49/6 & 50 , Panathur Village Varthur Hobli, Bengaluru, 560103"OngoingDec 2028Not due yet
Sobha Dream Gardens Phase 5 - Wing 10 LitigationSurvey No. 50, 51 & 54, Belahalli Village, Yelahanka HobliOngoingDec 2028Not due yet
Sobha Dream Gardens Phase 4 - Wing 1 and 2 LitigationSurvey No. 50, 51 & 54, Belahalli Village, Yelahanka HobliOngoingDec 2028Not due yet
Sobha Manhattan Towers-Town Park Phase 2 W 1 & 2 LitigationPhase 1 at Sy.No.48/1A and 48/2, in the composite project Sobha Manhattan Towers - Town Park situated at Sy.Nos.48/1A, 48/2, 50/2 and 50/3, presently bearing Khata No.1877/48/1A-1881/50/2-1886/48/2-1913/50/3, situated at Yadavanahalli Village, Attibele Hobli, Anekal TalukOngoingSep 2028Not due yet
Sobha Brooklyn Towers - Town Park Phase 5, W3Sy nos - 51/1(P), 51/2(P), 52/1(P), 52/2(P)&53 at Yadavanahalli village, Attibele hobli, Anekal taluk, Bangalore, KarnatakaOngoingJun 2028Not due yet
Sobha Windsor Phase 4 Wing 9, 10 and 11 LitigationSy No. 107(P), 115/2, 115/3, 115/4, 115/5, 116/3 situated at Nagondanahalli village and Sy No. 30/1, 30/6, Situated at Hagadur Village, K.R.Puram HobliOngoingMar 2028Not due yet
Sobha Victoria park phase 2"PROPOSED RESIDENTIAL DEVELOPMENT PROJECT AT SY.NO.47/1B,47/2B, KYALASANAHALLI VILLAGE , WARD NO.25, MAHADEVAPURA ZONE, K.R. PURAM HOBLI, BANGALORE "OngoingDec 2027Not due yet
Sobha Victoria park phase 1"PROPOSED RESIDENTIAL DEVELOPMENT PROJECT AT SY.NO.47/1B,47/2B, KYALASANAHALLI VILLAGE , WARD NO.25, MAHADEVAPURA ZONE, K.R. PURAM HOBLI, BANGALORE "OngoingDec 2027Not due yet
Sobha Sentosa Phase 4 Wing 1 and 2"PROPOSED RESIDENTIAL DEVELOPMENT PLAN AT SY NOS. 49/4 , 49/7, 50/2 (P) , 50/3 (P) , 50/4 (P) , 51/1 (P) , 51/2 B1(P) & 51/2B2 (P) AT BALAGERE, VARTHUR HOBLI, BANGALORE EAST, KARNATAKA "OngoingDec 2027Not due yet
Sobha Oakshire Phase 3 Wing 5,6,11 and 12Proposed residential building plan, Katha no. 80/73/3/74/2/75 (PID NO 150300200400520002), Sy nos 73/3, 74/2, 75 of Thimmegowdana Hosahalli village, Kasaba hobli,Devanahalli Taluk,Bangalore rural,562110OngoingDec 2027Not due yet
Sobha Dream Gardens Phase 3 - Wing 3 and 4 LitigationSurvey No. 50, 51 & 54, Belahalli Village, Yelahanka HobliOngoingDec 2027Not due yet
Sobha Brooklyn Towers - Town Park Phase 2, W2Sy nos - 51/1(P), 51/2(P), 52/1(P), 52/2(P)&53 at Yadavanahalli village, Attibele hobli, Anekal taluk, Bangalore, KarnatakaOngoingDec 2027Not due yet
Sobha Brooklyn Towers - Town Park Phase 1, W1Sy nos - 51/1(P), 51/2(P), 52/1(P), 52/2(P)&53 at Yadavanahalli village, Attibele hobli, Anekal taluk, Bangalore, KarnatakaOngoingDec 2027Not due yet
Sobha Windsor Phase 3 Wing 6, 7 and 8Field is not sufficient to enter the detailsOngoingSep 2027Not due yet
Sobha City AthenaProperty No 2091/40/7/1, 9/1, 9/2, 62/2, 62/3/1, Chokkanahalli Village, Ward No. 5, Jakkuru, Yelahanka Zone, BengaluruOngoingSep 2027Not due yet
Sobha Sentosa Phase 3 Wing 3 and 4"PROPOSED RESIDENTIAL DEVELOPMENT PLAN AT SY NOS. 49/4 , 49/7, 50/2 (P) , 50/3 (P) , 50/4 (P) , 51/1 (P) , 51/2 B1(P) & 51/2B2 (P) AT BALAGERE, VARTHUR HOBLI, BANGALORE EAST, KARNATAKA "OngoingJun 2027Not due yet
Sobha Oakshire Phase 2 Wing 3,4,9 and 10Proposed residential building plan, Katha no. 80/73/3/74/2/75 (PID NO 150300200400520002), Sy nos 73/3, 74/2, 75 of Thimmegowdana Hosahalli village, Kasaba hobli,Devanahalli Taluk,Bangalore rural,562110OngoingJun 2027Not due yet
Sobha Sentosa Phase 2 Wing 5 and 6"PROPOSED RESIDENTIAL DEVELOPMENT PLAN AT SY NOS. 49/4 , 49/7, 50/2 (P) , 50/3 (P) , 50/4 (P) , 51/1 (P) , 51/2 B1(P) & 51/2B2 (P) AT BALAGERE, VARTHUR HOBLI, BANGALORE EAST, KARNATAKA "OngoingDec 2026Not due yet
Sobha Oakshire Phase 1 Wing 1,2,7 and 8Proposed residential building plan, Katha no. 80/73/3/74/2/75 (PID NO 150300200400520002), Sy nos 73/3, 74/2, 75 of Thimmegowdana Hosahalli village, Kasaba hobli,Devanahalli Taluk,Bangalore rural,562110OngoingDec 2026Not due yet
Sobha Manhattan Towers-Town Park Phase 1 W 4 & 5 LitigationPhase 1 at Sy.No.48/1A and 48/2, in the composite project Sobha Manhattan Towers - Town Park situated at Sy.Nos.48/1A, 48/2, 50/2 and 50/3, presently bearing Khata No.1877/48/1A-1881/50/2-1886/48/2-1913/50/3, situated at Yadavanahalli Village, Attibele Hobli, Anekal TalukOngoingDec 2026Not due yet
Sobha Galera"SOBHA GALERA, SURVEY NO 45/4 OF HUSKUR VILLAGE, BIDARAHALLI HOBLI, BANGLAORE EAST TALUK SURVEY NO.116 OF AMANIDODDAKERE VILLAGE, KASABA HOBLI, HOSAKOTE TALUK, BANGALORE , BENGALURU EAST, BENGALURU URBAN, KARNATAKA - 560049"OngoingDec 2026Not due yet
Sobha Dream Acres - Oasis Phase 27 Wing 55, 56, 57 and 58 LitigationBalagere, BangaloreOngoingSep 2026Not delivered
Sobha Sentosa Phase 1 Wing 7"PROPOSED RESIDENTIAL DEVELOPMENT PLAN AT SY NOS. 49/4 , 49/7, 50/2 (P) , 50/3 (P) , 50/4 (P) , 51/1 (P) , 51/2 B1(P) & 51/2B2 (P) AT BALAGERE, VARTHUR HOBLI, BANGALORE EAST, KARNATAKA "OngoingJun 2026Not delivered
Sobha Royal Pavilion Phase 8 - Wing 15 LitigationSy No. 54/3, 55/1, 55/2, 58/1, 58/2, 58/3, 59/2, 59/3, 59/4, 59/5, 60/2, 61, 63/1 Hadosiddapura Village, and Sy. No 31/1 Chikkannelli VillageOngoingJun 2026Not delivered
Sobha Royal Pavilion Phase 7 - Wing 12, 13 and 14 LitigationSy No. 54/3, 55/1, 55/2, 58/1, 58/2, 58/3, 59/2, 59/3, 59/4, 59/5, 60/2, 61, 63/1 Hadosiddapura Village, and Sy. No 31/1 Chikkannelli VillageOngoingJun 2026Not delivered
Sobha Royal Pavilion Phase 6 - Wing 10 and 11 LitigationSy No. 54/3, 55/1, 55/2, 58/1, 58/2, 58/3, 59/2, 59/3, 59/4, 59/5, 60/2, 61, 63/1 Hadosiddapura Village, and Sy. No 31/1 Chikkannelli VillageOngoingJun 2026Not delivered
Sobha Royal Pavilion Phase 5 - Wing 8 and 9 LitigationSy No. 54/3, 55/1, 55/2, 58/1, 58/2, 58/3, 59/2, 59/3, 59/4, 59/5, 60/2, 61, 63/1 Hadosiddapura Village, and Sy. No 31/1 Chikkannelli VillageOngoingJun 2026Not delivered
Sobha Windsor Phase 2 Wing 3, 4 and 5 LitigationSy No. 107(P), 115/2, 115/3, 115/4, 115/5, 116/3 situated at Nagondanahalli village and Sy No. 30/1, 30/6, Situated at Hagadur Village, K.R.Puram HobliOngoingApr 2026Not delivered

How this compares with Bengaluru Urban

43%of this project is bookeddistrict median 51%
34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep Sobha Infinia Phase 2A Block 5 Wing 5 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmSobha Infinia Phase 2A BOther 12Dot size: filed unitsN

Filed coordinates, straight-line distance. 12 registered projects within 2 km.

Builder: SOBHA LIMITED

SOBHA LIMITED has 120 registrations on RERA Karnataka, including Sobha Oakshire Phase 1 Wing 1,2,7 and 8 and Sobha Oakshire Phase 2 Wing 3,4,9 and 10. Its filings declare 196 earlier projects, 85 of them declared completed. Litigation is declared on 33 of its registrations. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if Sobha Infinia Phase 2A Block 5 Wing 5 is delayed beyond 30 Jun 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Sobha Infinia Phase 2A Block 5 Wing 5?

The registered promoter entity is SOBHA LIMITED, a company as per the filing. Its CIN L45201KA1995PLC018475 and GSTIN 29AABCS7723E1ZB can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Sobha Infinia Phase 2A Block 5 Wing 5?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at Sobha Infinia Phase 2A Block 5 Wing 5?

The professionals named in the filing: Architect: Vinita Agast; Engineer: Mr. Srinivas Sathyanarayan; Engineer: Balakrishnan G; Chartered Accountant: Balaji D. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Sobha Infinia Phase 2A Block 5 Wing 5?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Sobha Infinia Phase 2A Block 5 Wing 5. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Sobha Infinia Phase 2A Block 5 Wing 5 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.