Home / Browse projects / Mumbai Suburban, Maharashtra / Tanishkaa Vikrant
Tanishkaa Vikrant
RG-MH-06223 · RERA P51800052284 · Last updated on MahaRERA portal: 11 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 1 complaint at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Tanishkaa Vikrant is a Others project by Tanishka Reality LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800052284 on 9 Aug 2023. Possession is promised by 30 Jun 2029. 83 of the 226 units on this registration are recorded sold or booked, and 54 of 55 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameTanishkaa Vikrant
- TypeOthers
- Location
- Tilak Road
- Gharkopar East
- Ghatkopar
- Kurla
- Mumbai Suburban
- 400077
- Pincode400077
- RERA no.P51800052284
- ReraGenie IDRG-MH-06223
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on9 Aug 2023
- Promised completion30 Jun 2029
- Revised completionNone
- Buildings5 building records
- Documents filed88 files
Current status
Figures as on 11 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A Wing | NA | 22 | 15 | 28 | 6 | 34 |
| B Wing | NA | 22 | 15 | 27 | 0 | 27 |
| C Wing | NA | 22 | 15 | 27 | 18 | 45 |
| D Wing | NA | 22 | 15 | 28 | 2 | 30 |
| E Wing | NA | 22 | 15 | 73 | 17 | 90 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building5
As on 11 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
54 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Internal walls, at 95%.
A Wing100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
B Wing100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
C Wing100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
D Wing100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
E Wing100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 95% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 11 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed445
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| A Wing | 87 | 87 |
| B Wing | 90 | 90 |
| C Wing | 91 | 91 |
| D Wing | 90 | 90 |
| E Wing | 87 | 87 |
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Lokhit Co-operative Housing Society Limited | Ghatkopar | Mumbai Suburban |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| A Wing | NA | Rs 31.05 cr | Rs 33.96 cr |
| B Wing | NA | Rs 31.05 cr | Rs 33.96 cr |
| C Wing | NA | Rs 31.05 cr | Rs 33.96 cr |
| D Wing | NA | Rs 31.05 cr | Rs 33.96 cr |
| E Wing | NA | Rs 31.05 cr | Rs 33.96 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ARCHITECT YASH AGARWAL |
| Engineer | clint santos |
| Engineer | JACOB DSOUZA |
| Chartered Accountant | NEHALI & CO |
| Chartered Accountant | NEHALI DOSHI |
| Partner | Role in project |
|---|---|
| Tanishka Reality LLP | - |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| SM12600465 | Bhakti Achrekar | Tanishka Reality LLP | 09/07/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 21 Jul 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 19 Jul 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 27 Jun 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 10 Jul 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Jun 2029
Documents filed88
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 88 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: form 1 signed.pdf | 11 May 2026 |
| Withdrawal Update Form 2File: FORM-2 TANISHKA REALITY LLP.pdf | 11 May 2026 |
| Withdrawal Update Form 3File: FORM 3 CA CERTIFICATE.pdf | 11 May 2026 |
| Withdrawal Update Form 1File: form 1.pdf | 27 Feb 2026 |
| Withdrawal Update Form 2File: form 2- Tanishka Reality LLP-( JULY TO SEP).pdf | 27 Feb 2026 |
| Withdrawal Update Form 3File: FORM 3 (OCT TO DEC) 25.pdf | 27 Feb 2026 |
| Withdrawal Update Form 1File: FORM 1 (JULY TO SEPT 25 ).pdf | 24 Feb 2026 |
| Withdrawal Update Form 2File: form 2- Tanishka Reality LLP-( JULY TO SEP).pdf | 24 Feb 2026 |
| Withdrawal Update Form 3File: FORM 3 (JULY TO SEPT )25.pdf | 24 Feb 2026 |
| Withdrawal Update Form 1File: FORM 1 - TANISHKA REALITY 25.pdf | 21 Feb 2026 |
| Withdrawal Update Form 2File: form 2 TANISHKA REALITY LLP 25.pdf | 21 Feb 2026 |
| Withdrawal Update Form 3File: TANISKA REALITY LLP FORM-03.pdf | 21 Feb 2026 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf | 11 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf | 29 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf | 24 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf | 15 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 23-24.pdf | 20 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf | 4 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf | 29 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf | 22 Oct 2024 |
| Details of encumbrances concerned to FinanceFile: TANISHKA RERA NON ENCUMBRANCE.pdf | 21 Oct 2024 |
| Details of encumbrances concerned to LegalFile: TANISHKA RERA NON ENCUMBRANCE.pdf | 21 Oct 2024 |
| Disclosure for secured/unsecured finance availed for the projectFile: TANISHKA RERA DISCLOSURE SECURE.pdf | 21 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf | 18 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf | 16 Jul 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: CC AMENDED - TANISHKA.pdf | 10 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT - FORM 1 TANISHKA.pdf | 10 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf | 9 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf | 9 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: form 2A.pdf | 6 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf | 30 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf | 30 Apr 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: TANISHKA REALITY LLP CC (1).pdf | 16 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER-TANISHKAA VIKRANT (1) (1) (1).pdf | 6 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate Dec 23.pdf | 2 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect form 1.pdf | 23 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf | 16 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf | 16 Oct 2023 |
| Copy of the legal title reportFile: final title nainesh satra.pdf | 21 Jul 2023 |
| Layout approvalFile: IOA PLANS (2)_1-1.pdf | 19 Jul 2023 |
| Layout approvalFile: IOA PLANS (2)_2-2.pdf | 19 Jul 2023 |
| Layout approvalFile: IOA PLANS (2)_3-3.pdf | 19 Jul 2023 |
| Layout approvalFile: IOA PLANS (2)_4-4.pdf | 19 Jul 2023 |
| Layout approvalFile: IOA PLANS (2)_5-5.pdf | 19 Jul 2023 |
| Layout approvalFile: IOA PLANS (2)_6-6.pdf | 19 Jul 2023 |
| Layout approvalFile: IOA PLANS (2)_7-7.pdf | 19 Jul 2023 |
| Layout approvalFile: IOA PLANS (2)_8-8.pdf | 19 Jul 2023 |
| Layout approvalFile: IOA PLANS (2)_9-9.pdf | 19 Jul 2023 |
| Layout approvalFile: IOA PLANS (2)_10-10.pdf | 19 Jul 2023 |
| Layout approvalFile: IOA PLANS (2)_11-11.pdf | 19 Jul 2023 |
| Layout approvalFile: IOA PLANS (2)_12-12.pdf | 19 Jul 2023 |
| Layout approvalFile: IOA PLANS (2)_13-13.pdf | 19 Jul 2023 |
| Layout approvalFile: IOA PLANS (2)_14-14.pdf | 19 Jul 2023 |
| Layout approvalFile: IOA PLANS (2)_15-15.pdf | 19 Jul 2023 |
| Layout approvalFile: IOA PLANS (2)_16-end.pdf | 19 Jul 2023 |
| Details of encumbrances concerned to FinanceFile: NO encumrance letter.pdf | 19 Jul 2023 |
| Details of encumbrances concerned to LegalFile: NO encumrance letter.pdf | 19 Jul 2023 |
| Copy of Layout Approval (in case of layout)File: IOA PLANS (2)_1-1.pdf | 19 Jul 2023 |
| Copy of Layout Approval (in case of layout)File: IOA PLANS (2)_2-2.pdf | 19 Jul 2023 |
| Copy of Layout Approval (in case of layout)File: IOA PLANS (2)_3-3.pdf | 19 Jul 2023 |
| Copy of Layout Approval (in case of layout)File: IOA PLANS (2)_4-4.pdf | 19 Jul 2023 |
| Copy of Layout Approval (in case of layout)File: IOA PLANS (2)_5-5.pdf | 19 Jul 2023 |
| Copy of Layout Approval (in case of layout)File: IOA PLANS (2)_6-6.pdf | 19 Jul 2023 |
| Copy of Layout Approval (in case of layout)File: IOA PLANS (2)_7-7.pdf | 19 Jul 2023 |
| Copy of Layout Approval (in case of layout)File: IOA PLANS (2)_8-8.pdf | 19 Jul 2023 |
| Copy of Layout Approval (in case of layout)File: IOA PLANS (2)_9-9.pdf | 19 Jul 2023 |
| Copy of Layout Approval (in case of layout)File: IOA PLANS (2)_10-10.pdf | 19 Jul 2023 |
| Copy of Layout Approval (in case of layout)File: IOA PLANS (2)_11-11.pdf | 19 Jul 2023 |
| Copy of Layout Approval (in case of layout)File: IOA PLANS (2)_12-12.pdf | 19 Jul 2023 |
| Copy of Layout Approval (in case of layout)File: IOA PLANS (2)_13-13.pdf | 19 Jul 2023 |
| Copy of Layout Approval (in case of layout)File: IOA PLANS (2)_14-14.pdf | 19 Jul 2023 |
| Copy of Layout Approval (in case of layout)File: IOA PLANS (2)_15-15.pdf | 19 Jul 2023 |
| Copy of Layout Approval (in case of layout)File: IOA PLANS (2)_16-end.pdf | 19 Jul 2023 |
| CERSAI detailsFile: CERSAI DECLARATION.pdf | 19 Jul 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: cc.pdf | 14 Jul 2023 |
| Declaration about Commencement CertificateFile: cc declation - bharat.pdf | 14 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed CA Certificate-Tanishka Realty LLP (2).pdf | 6 Jul 2023 |
| Declaration in FORM BFile: Form b (2) (1).pdf | 28 Jun 2023 |
| Building plan approvalFile: IOA NEW.pdf | 27 Jun 2023 |
| PAN CardFile: Company pan card.pdf | 27 Jun 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration, which the RERA portal never shows together
- All 88 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Tanishkaa Vikrant on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Gharkopar East6,700+ in Mumbai Suburban
Mahindra Rainforest Phase 1
Anthurium Developers Limited
Mahindra Rainforest Phase 2
Anthurium Developers Limited
CRYSTAL PRIME MERIDIAN
ARYAMAAN DEVELOPERS PRIVATE LIMITED
AARADHYA ONEPARK
MICL CREATORS LLP
CENTRONA ZEN-A
ELEVATED AVENUE REALTY LLP
CENTRONA ZEN-B
ELEVATED AVENUE REALTY LLP
See every Mumbai Suburban project, with the district possession charts
Builder: Tanishka Reality LLP
Tanishka Reality LLP has 2 registrations on MahaRERA, including Tanishkaa Vikrant and YOG MATRU BHOOMI. Its filings disclose 1 earlier MahaRERA project, none completed yet. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if Tanishkaa Vikrant is delayed beyond 30 Jun 2029?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Tanishkaa Vikrant?
The registered promoter entity is Tanishka Reality LLP, a partnership as per the filing. Its LLPIN AAZ-6956 and GSTIN 27AASFT5561D1ZT can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Tanishkaa Vikrant?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Tanishkaa Vikrant?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Tanishkaa Vikrant?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Tanishkaa Vikrant?
The professionals named in the filing: Architect: ARCHITECT YASH AGARWAL; Engineer: clint santos; Engineer: JACOB DSOUZA; Chartered Accountant: NEHALI & CO; Chartered Accountant: NEHALI DOSHI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Tanishkaa Vikrant?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.