Valid until 31 Jul 2023 Mixed Development project

Swagat Queen's Land Phase - 1

By SWAGAT INFRASTRUCTURE P L TD

RG-GJ-31549 · RERA PR/GJ/GANDHINAGAR/GANDHINAGAR/Others/MAA03405/A1M/EX1/040522 · Last updated on GujRERA portal: 7 Jul 2023

Source: official GujRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • Nothing verified clear yet
Jul 2023Possession promisedmoved 12 months from the original
54 of 54Construction stages doneacross 6 buildings; every applicable stage filed complete
33 of 320Units unsoldnot recorded sold or booked
Jump to the 43 documents Report an error

Swagat Queen's Land Phase - 1 is a Mixed Development project by SWAGAT INFRASTRUCTURE P L TD in Gandhinagar, Gujarat, registered with GujRERA as PR/GJ/GANDHINAGAR/GANDHINAGAR/Others/MAA03405/A1M/EX1/040522 on 12 Sep 2018. Possession is promised by 31 Jul 2023. The completion date has moved by 12 months from the original filing. 287 of the 320 units on this registration are recorded sold or booked, and 54 of 54 construction stages are filed complete.

At a glance

Project

  • NameSwagat Queen's Land Phase - 1
  • TypeMixed Development
  • Location
    • Swagat Queen's land
    • Nr. Swagat Afford
    • Nr. Sargasan Cross road
    • Gandhinagar
    • Gandhinagar
    • 382016
  • Pincode382016
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/GANDHINAGAR/GANDHINAGAR/Others/MAA03405/A1M/EX1/040522
  • ReraGenie IDRG-GJ-31549

Builder

  • NameSWAGAT INFRASTRUCTURE P L TD
  • Entity typeCOMPANY
  • Other registrations3 more →
  • Past their filed date4

Key dates

this monthRegisteredSep 2018First promiseJul 2022Revised toJul 2023

Key facts

Registration and timeline

  • StatusValid until 31 Jul 2023
  • Registered on12 Sep 2018
  • Promised completion31 Jul 2023
  • Revised completionRevised to 31 Jul 2023 (originally 31 Jul 2022)
  • Buildings6 building records
  • Documents filed43 files

Current status

90%287 of 320 units booked
100.0%Of the estimated cost spent so far

Figures as on 7 Jul 2023, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BLOCK A---541468
BLOCK B---56056
BLOCK C---56056
BLOCK D---28028
BLOCK E---56056
BLOCK F---56056

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building6

As on 7 Jul 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

54 of 54 construction stages are filed complete across 6 buildings.

BLOCK A100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
BLOCK B100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
BLOCK C100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
BLOCK D100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
BLOCK E100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%
BLOCK F100%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing100%

Progress on shared amenities19

As on 7 Jul 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes100%
Water supplyYes100%
Sewerage (chamber, lines, septic tank, STP)Yes100%
Storm water drainsYes100%
Landscaping and tree plantingYes100%
Street lightingYes100%
Community buildingsYes100%
Treatment and disposal of sewage and sullage waterYes100%
Solid waste management and disposalNoNot applicable
Water conservation, rain water harvestingYes100%
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Fire fightingNoNot applicable
Drinking water facilitiesNoNot applicable
Emergency evacuationNoNot applicable
Use of renewable energyNoNot applicable
SecurityNoNot applicable
Letter boxNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area11,749 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountNot declared
Estimated costRs 48.62 cr
Cost incurredRs 48.62 cr
Spent of the estimate100.0%
BuildingWingEstimatedIncurred
BLOCK ANARs 8.10 crRs 8.10 cr
BLOCK BNARs 8.10 crRs 8.10 cr
BLOCK CNARs 8.10 crRs 8.10 cr
BLOCK DNARs 8.10 crRs 8.10 cr
BLOCK ENARs 8.10 crRs 8.10 cr
BLOCK FNARs 8.10 crRs 8.10 cr

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

PR/GJ/GANDHINAGAR/GANDHINAGAR/Others/MAA03405/A1M/EX1/040522Applied Mar 2022; approved May 2022

Documents filed43

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/GANDHINAGAR/GANDHINAGAR/Others/MAA03405/A1M/EX1/040522 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect's certificate (Form 1)7 Jul 2023
Engineer's certificate (Form 2)7 Jul 2023
Engineer's certificate annexure7 Jul 2023
Accountant's certificate (Form 3)7 Jul 2023
Site photograph, BLOCK A7 Jul 2023
Site photograph, BLOCK B7 Jul 2023
Site photograph, BLOCK C7 Jul 2023
Site photograph, BLOCK D7 Jul 2023
Site photograph, BLOCK E7 Jul 2023
Site photograph, BLOCK F7 Jul 2023
RERA registration certificate12 Sep 2018
Proforma agreement for sale-
Auditor's report (1 of 3)-
Auditor's report (2 of 3)-
Auditor's report (3 of 3)-
Income tax return (1 of 3)-
Income tax return (2 of 3)-
Income tax return (3 of 3)-
Project specific document-
Directors' report (1 of 3)-
Directors' report (2 of 3)-
Directors' report (3 of 3)-
Commencement certificate-
Approved sanctioned plan-
Approved layout plan-
Agreement-
Land location-
Encumbrance certificate-
Area development document-
Proforma allotment letter-
Brochure-
Project related document-
Declaration in Form B-
Project photograph-
Audited balance sheet (1 of 3)-
Audited balance sheet (2 of 3)-
Audited balance sheet (3 of 3)-
Audited profit and loss statement (1 of 3)-
Audited profit and loss statement (2 of 3)-
Audited profit and loss statement (3 of 3)-
Cash flow statement (1 of 3)-
Cash flow statement (2 of 3)-
Cash flow statement (3 of 3)-

How this compares with Gandhinagar

90%of this project is bookeddistrict median 53%
16%of Gandhinagar projects moved their completion datethis one moved by 12 months

Computed across the 1,600+ Gandhinagar projects on ReraGenie, from their own filings.

Keep Swagat Queen's Land Phase - 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Gandhinagar1,600+ in Gandhinagar

2 kmSwagat Queen's Land PhasOther 245Dot size: filed unitsN

Filed coordinates, straight-line distance. 245 registered projects within 2 km.

Builder: SWAGAT INFRASTRUCTURE P L TD

SWAGAT INFRASTRUCTURE P L TD has 4 registrations on GujRERA, including Swagat Pelican and Swagat Agacia. Read the full track record. See more projects on the Gandhinagar district page.

Frequently asked questions

What are my rights if Swagat Queen's Land Phase - 1 is delayed beyond 31 Jul 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of Swagat Queen's Land Phase - 1?

The registered promoter entity is SWAGAT INFRASTRUCTURE P L TD, a company as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in Swagat Queen's Land Phase - 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

What should I check before booking in Swagat Queen's Land Phase - 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Swagat Queen's Land Phase - 1. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Swagat Queen's Land Phase - 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.