Home / Browse projects / Bengaluru Urban, Karnataka / SV GRANDUR

Registration approved Residential/Group Housing project

SV GRANDUR

By SV HOUSING

RG-KA-72245 · RERA PRM/KA/RERA/1251/308/PR/200117/003159 · Last updated on RERA Karnataka portal: 6 Jan 2020

Source: official RERA Karnataka filing

Red flags

  • Completion date moved by 9 months
  • 1 extension taken

Clear

  • No complaints on record
  • Separate project account declared
Apr 2022Possession promisedmoved 9 months from the original
0Complaints at RERA Karnatakaon this registration
Jump to the 47 documents Report an error

SV GRANDUR is a Residential/Group Housing project by SV HOUSING in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/308/PR/200117/003159 on 17 Jan 2020. Possession is promised by 9 Apr 2022. The completion date has moved by 9 months from the original filing.

At a glance

Project

  • NameSV GRANDUR
  • TypeResidential/Group Housing
  • Location
    • Anekal
    • Bengaluru Urban
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/308/PR/200117/003159
  • ReraGenie IDRG-KA-72245

Builder

  • NameSV HOUSING
  • Entity typePartnership Firm
  • Authorized SignatoryS VENKATESH
  • Other registrations1 more →
  • Declared earlier projects1 →

Key dates

this monthRegisteredJan 2020First promiseJul 2021Revised toApr 2022

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on17 Jan 2020
  • Promised completion9 Apr 2022
  • Revised completionRevised to 9 Apr 2022 (originally 9 Jul 2021)
  • Buildings4 building records
  • Documents filed47 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHREE---71071
VEERAM---71071
GEETHAM---71071
RAAGAM---71071

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 6 Jan 2020, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

As on 6 Jan 2020, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsYes-
Sewage and Drainage SystemYes-
Parks & Tree plantingYes-
Street LightingYes-
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes-
Solid waste management and disposalYes-
Water conservationYes-
Energy managementYes-
Fire protection and fire safety requirementsYes-
Education/Health/Other public amenitiesYes-
Electricity supply transformer and substationYes-
Emergency Evacuation servicesYes-
Storm water drainsYes-
Use of renewable energyYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseYes-
Community HallYes-
Outdoor Sports facilityYes-
Indoor Sports facilityYes-
Swimming PoolYes-
GymYes-
ParksYes-
Power BackupYes-
GasYes-
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesYes-
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesYes-
Provision for lodging of management staff and security staffYes-
Water conservation and renewable energyYes-

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area13,557 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 63.00 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPraveen B V
EngineerManohar N

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

ExtensionJul 2021 → Apr 2022

No reason recorded in the filing

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed47

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/308/PR/200117/003159 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
PCB CFEFile: CFE Consent.pdf6 Jan 2020
Form -B ,IN E Stamp paper with notarizedFile: Form B Estamp Notarized.pdf27 Dec 2019
Conversion order 101/2File: 1 Conversion 101-2.PDF13 Dec 2019
Conversion order 101/3File: 2 Conversion 101-3.PDF13 Dec 2019
Partnership deedFile: 3 SV Housing Partnership deed.pdf13 Dec 2019
Notarized Form BFile: 4 Notarized Form B.pdf13 Dec 2019
KhathaFile: 5 Khatha.PDF13 Dec 2019
Affidavit under sec 3(1) of RERA ActFile: 6 Notarized Affaidavit.pdf13 Dec 2019
Approval PlanFile: 8 Approval Plan.pdf13 Dec 2019
CertificateFile: FIRM REG CERTIFICATE.jpg-
16 Commencement Certificate-
17 Approved Building Plan-
18 Approved Layout Plan-
25 Proforma For Sale Deed-
19 Proforma of Agreement for Sale-
20 Sale Deed & RTC-
21 Approved Section of Building-
22 Area Development of Project-
23 Proforma of Allotment Letter-
24 Brochure of Current-
26 Project Specification-
15 Encumbrance Certificate-
29 Khatha-
30 Fire Force Department-
31 Airport Authority of India-
32 BESCOM-
33 SEIAA-
34 BSNL-
35 Existing Layout Plan-
36 Existing Section Plan and Specification-
Balance Sheet 2018 - 2019File: 01 Balance Sheet 2018.pdf-
Balance Sheet 2017 - 2018File: 02 Balance Sheet 2017.pdf-
Balance Sheet 2016 - 2017File: 03 Balance Sheet 2016.pdf-
Audited Profit and Loss Statement 2018 - 2019File: 04 Profit & Loss 2018.pdf-
Audited Profit and Loss Statement 2017 - 2018File: 05 Profit & Loss 2017.pdf-
Audited Profit and Loss Statement 2016 - 2017File: 06 Profit & Loss 2016.pdf-
Auditor's Report 2018 - 2019File: 08 Auditor's Report 2018.pdf-
Auditor's Report 2017 - 2018File: 09 Auditor's Report 2017.pdf-
Auditor's Report 2016 - 2017File: 10 Auditor's Report 2016.pdf-
Income Tax Return Acknowledgement 2018 - 2019File: 11 ITR 2018.pdf-
Income Tax Return Acknowledgement 2017 - 2018File: 12 ITR 2017.pdf-
Income Tax Return Acknowledgement 2016 - 2017File: 13 ITR 2016.pdf-
27 Declaration (Form B)-
Prospectus/BrochureFile: 01 Brochure.pdf-
Advertisement Copy 1File: 02 Advertisment Copy.pdf-
Tower Excel SheetFile: PRM_KA_RERA_1251_308_PR_200117_003159.xlsx-
Stability CertificateFile: 27 Structural Stability Certificate.pdf-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one moved by 9 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep SV GRANDUR on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmSV GRANDUROther 23Dot size: filed unitsN

Filed coordinates, straight-line distance. 23 registered projects within 2 km.

Builder: SV HOUSING

SV HOUSING has 2 registrations on RERA Karnataka, including SV GRANDUR and SV POLARIS. Its filings declare 1 earlier project, 1 of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if SV GRANDUR is delayed beyond 9 Apr 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of SV GRANDUR?

The registered promoter entity is SV HOUSING, a partnership firm as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in SV GRANDUR?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at SV GRANDUR?

The professionals named in the filing: Architect: Praveen B V; Engineer: Manohar N. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SV GRANDUR?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SV GRANDUR. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SV GRANDUR to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.