SURAKSHA TRANQUIL GARDENS

By RK SURAKSHA PROPERTIES

RG-KA-60250 · RERA PRM/KA/RERA/1251/310/PR/210331/004077 · Last updated on RERA Karnataka portal: 24 Mar 2021

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Dec 2024Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 88 documents Report an error

SURAKSHA TRANQUIL GARDENS is a Residential/Group Housing project by RK SURAKSHA PROPERTIES in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/210331/004077 on 31 Mar 2021. Possession is promised by 31 Dec 2024.

At a glance

Project

  • NameSURAKSHA TRANQUIL GARDENS
  • TypeResidential/Group Housing
  • Location
    • Bengaluru South
    • Bengaluru Urban
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1251/310/PR/210331/004077
  • ReraGenie IDRG-KA-60250

Builder

  • NameRK SURAKSHA PROPERTIES
  • Entity typePartnership Firm
  • Authorized SignatoryV RAMESH KUMAR

Key dates

this monthRegisteredMar 2021PromisedDec 2024

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on31 Mar 2021
  • Promised completion31 Dec 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed88 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A---1120112

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 24 Mar 2021, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

As on 24 Mar 2021, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsYes-
Sewage and Drainage SystemYes-
Parks & Tree plantingYes-
Street LightingNoNot applicable
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes-
Solid waste management and disposalYes-
Water conservationYes-
Energy managementYes-
Fire protection and fire safety requirementsYes-
Education/Health/Other public amenitiesYes-
Electricity supply transformer and substationYes-
Emergency Evacuation servicesYes-
Storm water drainsYes-
Use of renewable energyYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseYes-
Community HallYes-
Outdoor Sports facilityYes-
Indoor Sports facilityYes-
Swimming PoolYes-
GymYes-
ParksYes-
Power BackupYes-
GasNoNot applicable
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesYes-
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesYes-
Provision for lodging of management staff and security staffYes-
Water conservation and renewable energyNoNot applicable

Land and ownership5

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area6,271 sq m
Named landowners5
LandownerVillageDistrict
V.HEMALATHA--
V.KAMESWARA CHOWDARY--
KOUSHIK SOMASHEKAR--
V.RAMESH KUMAR--
B.V.MEENA--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 56.00 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAR. PRAMOD.C
EngineerB .C . SHIVANANDA

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed88

As listed on the registration, under the names the promoter filed them with; the newest 80 of 88 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/210331/004077 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
BWSSB NOCFile: BWSSB NOC.pdf24 Mar 2021
BWSSB NOC AcknowledgementFile: BWSSB .pdf22 Mar 2021
Bank statement as per the RERA bank account direction circularFile: Bank statement.pdf9 Mar 2021
Development detailsFile: STG_AREA STATEMENT.pdf9 Mar 2021
Application for NOC has been made for BWSSB. PFA the payment details and acknowledgements.File: bwssb ack receipt.pdf9 Mar 2021
Application for NOC has been made for BESCOM. PFA the payment details and acknowledgements.File: Bescom Receipt .jpeg9 Mar 2021
bank statementFile: BANK STATEMENT RK .pdf1 Mar 2021
UDIN number for the year 2019-20 balance sheetFile: balance sheet.pdf1 Mar 2021
UDIN number for the year 2019-20 profit and loss accountFile: profit and loss account.pdf1 Mar 2021
Conversion orders are uploaded.File: Conversion Copy.pdf1 Mar 2021
ECFile: Ec 13 2 and 13 3 .pdf1 Mar 2021
anardhan executed sale deed to the promoters, sale deed registered confirmation deed by tFile: GPA and confirmation deed.pdf1 Mar 2021
13/2 sale deed or title deed in the name land owner Sri .C Tulasiram .File: Tulasiram Sale deed .pdf1 Mar 2021
registration certificateFile: registration certificate.pdf1 Mar 2021
plan license letterFile: Plan license.pdf1 Mar 2021
CertificateFile: GST .pdf-
reraDocument NA-
PLAN 1 and 2 (1)-
PLAN 1 and 2-
reraDocument NA-
reraDocument NA-
Sale Deed-
LP No RK SURAKSHA -
PLAN 1 and 2 (1)-
reraDocument NA-
BROCHER (1)-
Project Specification-
EC -
Affidavit-
reraDocument NA-
Katha -
reraDocument NA-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
KSPCB -
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Plan 1 -
reraDocument NA-
reraDocument NA-
Unnamed document-
Balance Sheet 2019 - 2020File: B S 2020-21.pdf-
Balance Sheet 2018 - 2019File: BS 2019-20 .pdf-
Balance Sheet 2017 - 2018File: B & S2018-19.pdf-
Audited Profit and Loss Statement 2019 - 2020File: P&L 2020-21.pdf-
Audited Profit and Loss Statement 2018 - 2019File: P&L 2019-20.pdf-
Audited Profit and Loss Statement 2017 - 2018File: P&L 2018-19 -.pdf-
Director's Report 2019 - 2020File: COM 2020-21-.pdf-
Director's Report 2018 - 2019File: COM 2019-20 .pdf-
Director's Report 2017 - 2018File: COM 2018-19.pdf-
Cash Flow Statement 2019 - 2020File: reraDocument NA.pdf-
Cash Flow Statement 2018 - 2019File: reraDocument NA.pdf-
Auditor's Report 2019 - 2020File: 3CB 2020-21 Com .pdf-
Auditor's Report 2018 - 2019File: 3CB 2019-20 Com .pdf-
Auditor's Report 2017 - 2018File: 3CB 2018-19 Com .pdf-
Income Tax Return Acknowledgement 2019 - 2020File: ITR 2020-21-.pdf-
Income Tax Return Acknowledgement 2018 - 2019File: ITR 2019-20 -1.pdf-
Income Tax Return Acknowledgement 2017 - 2018File: ITR 2018-19 -1 (1).pdf-
declaration From B (1)-
Prospectus/BrochureFile: BROUCHER.pdf-
Advertisement Copy 1File: BROUCHER.pdf-
Tower Excel SheetFile: PRMKARERA1251310PR210331004077.xlsx-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep SURAKSHA TRANQUIL GARDENS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

Builder: RK SURAKSHA PROPERTIES

RK SURAKSHA PROPERTIES has 1 registration on RERA Karnataka, including SURAKSHA TRANQUIL GARDENS. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if SURAKSHA TRANQUIL GARDENS is delayed beyond 31 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of SURAKSHA TRANQUIL GARDENS?

The registered promoter entity is RK SURAKSHA PROPERTIES, a partnership firm as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in SURAKSHA TRANQUIL GARDENS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at SURAKSHA TRANQUIL GARDENS?

The professionals named in the filing: Architect: AR. PRAMOD.C; Engineer: B .C . SHIVANANDA. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SURAKSHA TRANQUIL GARDENS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SURAKSHA TRANQUIL GARDENS. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SURAKSHA TRANQUIL GARDENS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.