Registration approved Residential/Group Housing project

SURAKSHA SILVER OAK

By SK SURAKSHA PROPERTIES

RG-KA-56528 · RERA PRM/KA/RERA/1251/310/PR/201215/003743 · Last updated on RERA Karnataka portal: 30 Nov 2020

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Dec 2023Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 81 documents Report an error

SURAKSHA SILVER OAK is a Residential/Group Housing project by SK SURAKSHA PROPERTIES in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/201215/003743 on 15 Dec 2020. Possession is promised by 31 Dec 2023.

At a glance

Project

  • NameSURAKSHA SILVER OAK
  • TypeResidential/Group Housing
  • Location
    • Bengaluru South
    • Bengaluru Urban
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1251/310/PR/201215/003743
  • ReraGenie IDRG-KA-56528

Builder

  • NameSK SURAKSHA PROPERTIES
  • Entity typePartnership Firm
  • Authorized SignatoryV Kameshwara chowdary
  • OthersV Kameshwara chowdary, KOUSHIK SOMASHEKAR, P.B Prakash Kumar, V Ramesh Kumar, STALIN JOSEPH

Key dates

this monthRegisteredDec 2020PromisedDec 2023

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on15 Dec 2020
  • Promised completion31 Dec 2023
  • Revised completionNone
  • Buildings2 building records
  • Documents filed81 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A---52052
B---52052

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 30 Nov 2020, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja work-
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

As on 30 Nov 2020, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsYes-
Sewage and Drainage SystemYes-
Parks & Tree plantingYes-
Street LightingYes-
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes-
Solid waste management and disposalYes-
Water conservationYes-
Energy managementYes-
Fire protection and fire safety requirementsYes-
Education/Health/Other public amenitiesYes-
Electricity supply transformer and substationYes-
Emergency Evacuation servicesYes-
Storm water drainsYes-
Use of renewable energyNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseNoNot applicable
Community HallYes-
Outdoor Sports facilityYes-
Indoor Sports facilityNoNot applicable
Swimming PoolYes-
GymYes-
ParksYes-
Power BackupYes-
GasNoNot applicable
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesYes-
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesYes-
Provision for lodging of management staff and security staffYes-
Water conservation and renewable energyYes-

Land and ownership2

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area6,068 sq m
Named landowners2
LandownerVillageDistrict
B K Raghavendra Pramod--
B K Vasudev Pradeep--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 29.00 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectV.SIVA KUMAR
EngineerSRINIVAS RAO BOLIMUNTA

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed81

As listed on the registration, under the names the promoter filed them with; the newest 80 of 81 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/201215/003743 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Compliance for the query dated 27/11/2020File: BHK wise breakup details.pdf30 Nov 2020
Property Bounded DetailsFile: scheduls.pdf24 Nov 2020
Bank Account detailsFile: Bank Account.pdf20 Nov 2020
Audited P and L Account with chartered accountant UDINFile: PL.pdf20 Nov 2020
Audited Balance sheet with chartered accountant UDINFile: BS.pdf20 Nov 2020
EC from 01-04-2004 to 15-06-2019File: EC.pdf20 Nov 2020
Plan licence letter and plan CopyFile: Plan.pdf20 Nov 2020
NOC From BWSSBFile: BWSSB.pdf20 Nov 2020
NOC From BESCOMFile: BESCOM.pdf20 Nov 2020
CertificateFile: sk Registration.pdf-
Plan (1)-
Plan (1)-
Plan 2-
reraDocument NA-
reraDocument NA-
Sale Deed SK Suraksha -
Plan (1)-
Plan (1)-
SK rera Allotment Letter (1)-
e-brochure_compressed-
Plan 2-
ec sk 19-1 latest-
Notarized affidavit-
JD Declaration final-
katha certificate and extracts SK -
Jd Agreement -
Unnamed document-
RERA conversion copy-
Unnamed document-
reraDocument NA-
reraDocument NA-
reraDocument NA-
Unnamed document-
Unnamed document-
Unnamed document-
BWSSB Sk Suraksha PM-
RERA pollution control board -
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Plan 2-
Plan (1)-
RERA conversion copy-
Unnamed document-
Balance Sheet 2019 - 2020File: BS.pdf-
Balance Sheet 2018 - 2019File: reraDocument NA.pdf-
Balance Sheet 2017 - 2018File: reraDocument NA.pdf-
Audited Profit and Loss Statement 2019 - 2020File: PL.pdf-
Audited Profit and Loss Statement 2018 - 2019File: reraDocument NA.pdf-
Audited Profit and Loss Statement 2017 - 2018File: reraDocument NA.pdf-
Director's Report 2019 - 2020File: reraDocument NA.pdf-
Director's Report 2018 - 2019File: reraDocument NA.pdf-
Director's Report 2017 - 2018File: reraDocument NA.pdf-
Cash Flow Statement 2019 - 2020File: reraDocument NA.pdf-
Cash Flow Statement 2018 - 2019File: reraDocument NA.pdf-
Auditor's Report 2019 - 2020File: reraDocument NA.pdf-
Auditor's Report 2018 - 2019File: reraDocument NA.pdf-
Auditor's Report 2017 - 2018File: reraDocument NA.pdf-
Income Tax Return Acknowledgement 2019 - 2020File: SK ITR 2020-21.pdf-
Income Tax Return Acknowledgement 2018 - 2019File: reraDocument NA.pdf-
Income Tax Return Acknowledgement 2017 - 2018File: reraDocument NA.pdf-
Form B_compressed-
Prospectus/BrochureFile: e-brochure_compressed.pdf-
Advertisement Copy 1File: ebrochurecompressed.pdf-
Tower Excel SheetFile: PRMKARERA1251310PR201215003743.xlsx-
Road cutting permission letter issued by the planning Authority for laying Water supply line, sanitary line, UFile: SK SURAKSHA BWSSB PAYMENT.pdf-
Occupancy CertificateFile: SK_OC (1).pdf-
Certificate of operation for lifts issued by the Chief of Department of Electrical inspectorate Government of File: BESCOM.jpeg-
Sanctioned letter issued by concerned water supply and sanitary board for the projectFile: SK SURAKSHA BWSSB PAYMENT.pdf-
Architect certificate for having completed the work(in format no 5)File: SURAKSHA PROPERTIES FORM-5.pdf-
Chartered Accountant certificate for having completed the work(in format no 4)File: Form 4CC_compressed.pdf-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep SURAKSHA SILVER OAK on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

Builder: SK SURAKSHA PROPERTIES

SK SURAKSHA PROPERTIES has 1 registration on RERA Karnataka, including SURAKSHA SILVER OAK. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if SURAKSHA SILVER OAK is delayed beyond 31 Dec 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of SURAKSHA SILVER OAK?

The registered promoter entity is SK SURAKSHA PROPERTIES, a partnership firm as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in SURAKSHA SILVER OAK?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at SURAKSHA SILVER OAK?

The professionals named in the filing: Architect: V.SIVA KUMAR; Engineer: SRINIVAS RAO BOLIMUNTA. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SURAKSHA SILVER OAK?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SURAKSHA SILVER OAK. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SURAKSHA SILVER OAK to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.