ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / SUPREME CITY

Registration lapsed No litigation declared Residential / Group Housing project

SUPREME CITY

By VNAP MULTICON PRIVATE LIMITED

RG-MH-71077 · RERA P52100052404 · Last updated on MahaRERA portal: 8 Aug 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 14 months past the filed date
  • Completion date moved by 8 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Aug 2025Possession promised14 months past this date
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 85%
0Complaints at MahaRERAon this registration
Jump to the 69 documents Report an error

SUPREME CITY is a Residential / Group Housing project by VNAP MULTICON PRIVATE LIMITED in Pune, Maharashtra, registered with MahaRERA as P52100052404 on 21 Aug 2023. Possession was promised by 31 Aug 2025 and is now 14 months past that date. The completion date has moved by 8 months from the original filing.

At a glance

Project

  • NameSUPREME CITY
  • TypeResidential / Group Housing
  • Location
    • SURVEY NO 48-49
    • OLD CHANDOLI ROAD
    • NEAR PUNE NASHIK HIGHWAY
    • MANCHAR
    • Eklahare
    • Ambegaon
    • Pune
    • 410503
  • Pincode410503
  • RERA no.P52100052404
  • ReraGenie IDRG-MH-71077

Builder

  • NameVNAP MULTICON PRIVATE LIMITED
  • Entity typeCompany
  • DirectorsUDAY KASHINATH DALVI, ASHOK SRICHAND HARCHANDANI

Key dates

14 months past promisethis monthRegisteredAug 2023First promiseDec 2024Revised toAug 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on21 Aug 2023
  • Promised completion31 Aug 2025
  • Revised completionRevised to 31 Aug 2025 (originally 31 Dec 2024)
  • Buildings1 building record
  • Documents filed69 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING CNA70000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 8 Aug 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 85%.

WING C: 35% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure85%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 8 Aug 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Land and ownership4

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area10,694 sq m
Land owned byThe promoter, with other names on the file
Named landowners4
LandownerVillageDistrict
NEHA SATYANARAYAN PADWALMahalunge PadawalPune
ALKA BABASAHEB SHINDEManchar (CT)Pune
DATTATRAYA SHANKAR MORADEManchar (CT)Pune
SHAMRAO CHANDRAKANT MORADEKurlaMumbai Suburban

Approvals and building plan

Permissible FSI3560.5
Proposed, not sanctioned3,560 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMANCHAR BRANCH, AMBEGAON PUNE

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAVINASH NAWATHE
EngineerAMAL KRISHNA BISWAS
EngineerERFAN KAZI
EngineerRenuka Vishwas Dumbre
EngineerSunil Shinde
Chartered AccountantABHIJEET JAYANT KOLAPKAR
PartnerRole in project
VNAP MULTICON PRIVATE LIMITED-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100027199Dec 2024 → Aug 2025

Reason as filed by the promoterWe hereby apply for extension of our above project ,Due date for completion of the project as estimated at the time of the registration was 31/12/2024. We are seeking Extension for the first time till 31/08/2025 for below reasons. 1. We have completed the structure alongwith Plaster as same can been seen from Photo uploaded. 2. External plumbing work is also almost done. 3. Internal finishing work is completed around 50%-55% and we need time to complete the same 4. We have also started arranging NOC and documents required for OC Application. 5. Entrance gate is also ready as can been seen from

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Mar 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 Jun 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Mar 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Mar 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed69

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Disclosure of Sold and Booked InventoryFile: Sold Inventory.pdf8 Aug 2025
Form 3File: Form 3.pdf8 Aug 2025
Form 2File: Form 2.pdf8 Aug 2025
Form 1File: Form 1.pdf8 Aug 2025
Declaration in FORM BFile: Declaration - 500 Stamp Paper .pdf20 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: form 5 signed.pdf12 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf3 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed.pdf3 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf3 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q1 FY 23-24.pdf17 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q2 FY 23-24.pdf17 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q3 FY 23-24.pdf17 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q4 FY 23-24.pdf17 Jan 2025
Declaration in FORM BFile: Form B.pdf14 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q1 FOR UPLOAD.pdf19 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q2.pdf19 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 (ENGINEER).pdf19 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 (ENGINEER).pdf19 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM-2A With Sign.pdf27 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf11 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 (ENGINEER)_Q4.pdf11 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q4.pdf11 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q3.pdf22 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q1.pdf22 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q2.pdf22 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q3.pdf22 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q1.pdf22 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q2.pdf22 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q3.pdf22 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q2.pdf22 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q1.pdf22 Feb 2024
Declaration about Commencement CertificateFile: Declaration about Commencement Certificate.pdf2 Aug 2023
Declaration about Commencement CertificateFile: CC Order.pdf17 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf4 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM- 1.pdf1 Jul 2023
Other - TechnicalFile: Plint Completion Certificate.pdf1 Jul 2023
Other - TechnicalFile: 9(34) - Building C.PDF1 Jul 2023
Other - TechnicalFile: 10(31) - Building C.PDF1 Jul 2023
Other - TechnicalFile: 11(22) - Building C.PDF1 Jul 2023
Layout approvalFile: 8(37).PDF1 Jun 2023
Layout approvalFile: 9(34) - Building C.PDF1 Jun 2023
Layout approvalFile: 10(31) - Building C.PDF1 Jun 2023
Layout approvalFile: 11(22) - Building C.PDF1 Jun 2023
Layout approvalFile: 2(63).PDF1 Jun 2023
Copy of Layout Approval (in case of layout)File: 2(63).PDF1 Jun 2023
Copy of Layout Approval (in case of layout)File: 8(37).PDF1 Jun 2023
Copy of Layout Approval (in case of layout)File: 9(34) - Building C.PDF1 Jun 2023
Copy of Layout Approval (in case of layout)File: 10(31) - Building C.PDF1 Jun 2023
Copy of Layout Approval (in case of layout)File: 11(22) - Building C.PDF1 Jun 2023
Proforma of Agreement for saleFile: Proforma of Agreement for sale.pdf19 May 2023
CERSAI detailsFile: CERSAI_Search_Report.pdf2 May 2023
CERSAI detailsFile: Cerssai Undertaking.pdf2 May 2023
Details of encumbrances concerned to FinanceFile: Details of encumbrances concerned to Finance.pdf15 Apr 2023
Details of encumbrances concerned to FinanceFile: 1 b Details of encumbrances concerned to Legal .pdf15 Apr 2023
Details of encumbrances concerned to LegalFile: Details of encumbrances concerned to Finance.pdf15 Apr 2023
Details of encumbrances concerned to LegalFile: 1 b Details of encumbrances concerned to Legal .pdf15 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Supreme City.pdf15 Apr 2023
Proforma of Allotment letterFile: Proforma of Allotment letter.pdf15 Apr 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Separate Bank Account details including no encumbrances on the Bank Account or no escrow o15 Apr 2023
Building plan approvalFile: 11(22) - Building C.PDF29 Mar 2023
PAN CardFile: VNAP PAN CARD SELF ATTESTED.pdf29 Mar 2023
Copy of the legal title reportFile: Copy of the legal title report.pdf29 Mar 2023
Building Plan Approval / NA Order for plotted developmentFile: 11(22) - Building C.PDF29 Mar 2023
Commencement Certificates / NA Order for plotted developmentFile: Commencement certificate.pdf29 Mar 2023
Declaration in FORM BFile: Declaration in FORM B.pdf29 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Estate Organizations_Uday Dalvi.pdf29 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Estate Organizations_Ashok Harchandani.pdf29 Mar 2023
Deviation Report with respect to Allotment letterFile: Deviation Report with respect to Allotment letter.pdf29 Mar 2023
Deviation Report with respect to model copy of AgreementFile: Deviation Report with respect to model copy of Agreement.pdf29 Mar 2023

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 8 months
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SUPREME CITY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MANCHAR13,700+ in Pune

Builder: VNAP MULTICON PRIVATE LIMITED

VNAP MULTICON PRIVATE LIMITED has 1 registration on MahaRERA, including SUPREME CITY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that SUPREME CITY shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if SUPREME CITY is delayed beyond 31 Aug 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SUPREME CITY?

The registered promoter entity is VNAP MULTICON PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SUPREME CITY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SUPREME CITY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SUPREME CITY?

The professionals named in the filing: Architect: AVINASH NAWATHE; Engineer: AMAL KRISHNA BISWAS; Engineer: ERFAN KAZI; Engineer: Renuka Vishwas Dumbre; Engineer: Sunil Shinde; Chartered Accountant: ABHIJEET JAYANT KOLAPKAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SUPREME CITY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SUPREME CITY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SUPREME CITY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.