Registration approved No litigation declared Residential/Group Housing project

SUNRISE ROYAL VISTA

By Sunrise Developers and Constructions

RG-KA-47354 · RERA PRM/KA/RERA/1251/310/PR/300823/006202 · Last updated on RERA Karnataka portal: 19 Aug 2023

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Dec 2025Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 114 documents Report an error

SUNRISE ROYAL VISTA is a Residential/Group Housing project by Sunrise Developers and Constructions in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/300823/006202 on 30 Aug 2023. Possession is promised by 31 Dec 2025.

At a glance

Project

  • NameSUNRISE ROYAL VISTA
  • TypeResidential/Group Housing
  • Location
    • Bengaluru South
    • Bengaluru Urban
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1251/310/PR/300823/006202
  • ReraGenie IDRG-KA-47354

Builder

  • NameSunrise Developers and Constructions
  • Entity typePartnership Firm
  • GSTIN29AEVFS5974C1Z8
  • Authorized SignatoryMr.A.SRINIVASULU

Key dates

this monthRegisteredAug 2023PromisedDec 2025

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on30 Aug 2023
  • Promised completion31 Dec 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed114 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Sunrise Royal Vista---24024

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 19 Aug 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)Not applicable
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)Not applicable
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work-
Internal and External work including landscapes as per sanctioned drawings-

Progress on shared amenities30

As on 19 Aug 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Solid waste management and disposalNoNot applicable
Emergency Evacuation servicesNoNot applicable
Internal Roads & FootpathsNoNot applicable
Electricity supply transformer and substationYes-
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)Yes-
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupYes-
Piped GasNoNot applicable
Water and SanitationNoNot applicable
Air ConditioningNoNot applicable
StaircasesYes-
LiftsYes-

Land and ownership1

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Named landowners1
LandownerVillageDistrict
Mr. RAMAKRISHNAPPA--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 6.72 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 5.42 cr-
On-site expenditure-Site OverheadRs 70.00 lakh-
Payment of taxesRs 25.00 lakh-
Payment of cessRs 25.00 lakh-
On-site expenditure-Consultants FeesRs 10.00 lakh-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMr. T V Srinivas
EngineerMr. MANDHADI VENKAT RAMANA REDDY
Chartered AccountantHariharasudan Selvaraj

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed114

As listed on the registration, under the names the promoter filed them with; the newest 80 of 114 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/300823/006202 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Upload CDP map showing the proposed site.File: CDP.pdf19 Aug 2023
Upload commencement certificateFile: cc letter.pdf19 Aug 2023
Not uploaded the complete copy and without signature of the BWSSB, Therefore, Please upload the compFile: BWSSB 1.pdf19 Aug 2023
Please upload the Certificate from Registered Engineer indicating the structural safety of the propoFile: Structural Stability certificate.pdf19 Aug 2023
Not uploaded the corrected copy. Please mention the project address and upload the section 3(1) notaFile: AFFIDAVIT Isunrise31RERA Affidavit.pdf19 Aug 2023
Not uploaded, Please upload the brief estimated cost of construction for the civil works certified bFile: civil work.pdf19 Aug 2023
Upload firm registration certificateFile: Sunrise Dev & cons Firm Reg Certificate.pdf26 Jul 2023
mention net worth of the promoter in CA certificateFile: networth.pdf26 Jul 2023
Upload profit and loss account and balance sheet, 2019-20, 2020-21 & 2021-22 with CA UDIN along withFile: profit and loss.pdf26 Jul 2023
What are all the sources of funds to complete the project? With supporting documentsFile: source of fund.pdf26 Jul 2023
Carpet Area Mentioned in the project details Page not matching with the sanction plan clarify /File: carpet area calucations.pdf26 Jul 2023
Height of the building mentioned in the development details page is not matching with the sanction pFile: Plan merged_compressed.pdf26 Jul 2023
Upload Single plot layoutFile: single plot.pdf26 Jul 2023
Upload Single plot layout OrderFile: single plot layout.pdf26 Jul 2023
Upload CDP map showing the proposed siteFile: CDP.pdf26 Jul 2023
Upload village map showing the proposed siteFile: Village Map.pdf26 Jul 2023
Upload Building LicenseFile: Building Liscence.pdf26 Jul 2023
Please upload the Certificate from Registered Engineer indicating the structural safety of the propoFile: Structural Stability certificate.pdf26 Jul 2023
Please upload the complete copy of the BWSSB NOC along with the clearly visible BWSSB fee receiptFile: BWSSB_merged.pdf26 Jul 2023
Please mention the correct address with the survey nos of the project site and upload the project sFile: specification.pdf26 Jul 2023
Please mention the project address and upload the section 3(1) notarized affidavit.File: AFFIDAVIT I-sunrise-3-1-RERA Affidavit.pdf26 Jul 2023
Please upload the STP design drawing certified by the concerned Engineer as per the guidelines of KSFile: STP.pdf26 Jul 2023
Please upload the proforma of the Allotment letter in the prescribed formatFile: Allotment letter sunrise.pdf26 Jul 2023
ploaded proforma of Agreement for Sale (AFS) not in accordance with the notified AFS. Certain clauseFile: sale agreement-sunrise final (1).pdf26 Jul 2023
Please upload a copy of the fee receipt paid towards BESCOIM.File: NOC issued by BESCOM.pdf26 Jul 2023
RTC, survey 54/3-
Mutation, survey 54/3-
Encumbrance Certificate, survey 54/3-
Conversion/Alienation Order, survey 54/3-
Sale/Title/Gift Deed, survey 54/3-
JDA, survey 54/3-
Khatha, survey 54/3-
Registration CertificateFile: DEED_OF_PARTNERSHIP_Sunrise Developer and Constructions_sd_compressed.pdf-
Partnership DeedFile: DEED_OF_PARTNERSHIP_Sunrise Developer and Constructions_sd_compressed.pdf-
Partner Details-
Partner Details-
Certificate issued by CA Form 1File: FORM 1 RERA SUNRISE CERTIFICATE (1).pdf-
Certificate issued by Architect Form 2File: Form 2.pdf-
Certificate issued by Engineer Form 3File: Form 3.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: letter for rera non litigation sunrise.pdf-
Certificate from Chartered AccountFile: FORM 1 RERA SUNRISE CERTIFICATE (1).pdf-
Balance Sheet 2021 - 2022File: NA3.pdf-
Balance Sheet 2020 - 2021File: NA3.pdf-
Balance Sheet 2019 - 2020File: NA3.pdf-
Audited Profit and Loss Statement 2021 - 2022File: NA3.pdf-
Audited Profit and Loss Statement 2020 - 2021File: NA3.pdf-
Audited Profit and Loss Statement 2019 - 2020File: NA3.pdf-
Director's Report 2021 - 2022File: NA3.pdf-
Director's Report 2020 - 2021File: NA3.pdf-
Director's Report 2019 - 2020File: NA3.pdf-
Cash Flow Statement 2021 - 2022File: NA3.pdf-
Cash Flow Statement 2020 - 2021File: NA3.pdf-
Auditor's Report 2021 - 2022File: NA3.pdf-
Auditor's Report 2020 - 2021File: NA3.pdf-
Auditor's Report 2019 - 2020File: NA3.pdf-
Income Tax Return Acknowledgement 2021 - 2022File: NA3.pdf-
Income Tax Return Acknowledgement 2020 - 2021File: NA3.pdf-
Income Tax Return Acknowledgement 2019 - 2020File: NA3.pdf-
NA3-
NOC issued by BESCOM-
BWSSB_merged-
BBMP Plan-
BBMP Plan-
BBMP Plan-
NA3-
NA3-
Specifications-
NA3-
NA3-
NA3-
NA3-
NA3-
JDA (1)-
NA3-
NA3-
Conversion Copy_compressed-
Sale Deed_merged-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep SUNRISE ROYAL VISTA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

Builder: Sunrise Developers and Constructions

Sunrise Developers and Constructions has 1 registration on RERA Karnataka, including SUNRISE ROYAL VISTA. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if SUNRISE ROYAL VISTA is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of SUNRISE ROYAL VISTA?

The registered promoter entity is Sunrise Developers and Constructions, a partnership firm as per the filing. Its GSTIN 29AEVFS5974C1Z8 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in SUNRISE ROYAL VISTA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at SUNRISE ROYAL VISTA?

The professionals named in the filing: Architect: Mr. T V Srinivas; Engineer: Mr. MANDHADI VENKAT RAMANA REDDY; Chartered Accountant: Hariharasudan Selvaraj. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SUNRISE ROYAL VISTA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SUNRISE ROYAL VISTA. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SUNRISE ROYAL VISTA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.