ReraGenieLog inGet a buyer report

Home / Browse projects / Bengaluru Urban, Karnataka / SUNDEW ZRIKA

Registration approved Residential/Group Housing project

SUNDEW ZRIKA

By SUNDEW HOMES

RG-KA-49838 · RERA PRM/KA/RERA/1251/309/PR/211209/004579 · Last updated on RERA Karnataka portal: 30 Nov 2021

Source: official RERA Karnataka filing

Red flags

  • 1 complaint at RERA Karnataka

Clear

  • Completion date never moved
  • Separate project account declared
Sep 2023Possession promisedno revision filed
1Complaints at RERA Karnatakaon this registration
Jump to the 79 documents Report an error

SUNDEW ZRIKA is a Residential/Group Housing project by SUNDEW HOMES in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/309/PR/211209/004579 on 9 Dec 2021. Possession is promised by 1 Sep 2023. 1 complaint is on record with the regulator.

At a glance

Project

  • NameSUNDEW ZRIKA
  • TypeResidential/Group Housing
  • Location
    • Bengaluru North
    • Bengaluru Urban
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/309/PR/211209/004579
  • ReraGenie IDRG-KA-49838

Builder

  • NameSUNDEW HOMES
  • Entity typePartnership Firm
  • Authorized SignatoryPradeep
  • OthersPreksha

Key dates

this monthRegisteredDec 2021PromisedSep 2023

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on9 Dec 2021
  • Promised completion1 Sep 2023
  • Revised completionNone
  • Buildings1 building record
  • Documents filed79 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
sundew zrika---55055

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 30 Nov 2021, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level BeamNot applicable
Sub-structure flooring (Parking Floor, more than one floor below general ground level)Not applicable
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)-
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities32

As on 30 Nov 2021, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsYes-
Sewage and Drainage SystemYes-
Parks & Tree plantingYes-
Street LightingYes-
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes-
Solid waste management and disposalNoNot applicable
Water conservationYes-
Energy managementYes-
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesNoNot applicable
Electricity supply transformer and substationYes-
Emergency Evacuation servicesNoNot applicable
Storm water drainsYes-
Use of renewable energyYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseNoNot applicable
Community HallYes-
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksYes-
Power BackupYes-
GasYes-
Water and SanitationYes-
Air Conditioning And incerntionYes-
StaircasesYes-
LiftsYes-

Land and ownership3

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,589 sq m
Named landowners3
LandownerVillageDistrict
B.M.Chandra--
Jayanth B.C--
Kiran Kumar B.C--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 17.00 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMS. VANI HEGDE
EngineerMr.Vijayananda

Complaints filed with RERA Karnataka1

Case no.ComplainantRespondentFiled
01159/2025-SUNDEW HOMES11/09/2025

Documents filed79

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/309/PR/211209/004579 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
PROFORMA SALE DEED WITH THE PROMISED SPECIFICATIONS HAS TO BE UPLOADED - UPLOADEDFile: PROFORMA SALE DEED.pdf30 Nov 2021
THE NOC ISSUED BY BESCOM - UPLOADEDFile: BESCOM NOC.pdf30 Nov 2021
JDAFile: JDA.pdf8 Nov 2021
OSFile: Os No 623 2014.pdf8 Nov 2021
PANCHAYAT SETTLEMENTFile: Panchayath Settlement and Partition Deed.pdf8 Nov 2021
REPLY TO QUERYFile: REPLY TO QUERY .pdf8 Nov 2021
OS NUMBER 623File: Os No 623 2014.pdf28 Oct 2021
EC TILL DATEFile: EC TILL DATE.pdf28 Oct 2021
PANCHAYAT SETTLEMENTFile: Panchayath Settlement and Partition Deed.pdf28 Oct 2021
STP DRAWINGSFile: STP DRAWINGS.pdf13 Oct 2021
STP DESIGN CALCULATIONFile: stp design calculatons.pdf13 Oct 2021
KHATHAFile: Khatha.pdf13 Oct 2021
JDAFile: JDA.pdf13 Oct 2021
FINANCIALS 2019-2020File: Finacials 2019-20.pdf22 Sep 2021
FINANCIALS 2020-2021File: Finacials 2020-21.pdf22 Sep 2021
BWSSB NOCFile: BWSSB NOC.pdf22 Sep 2021
FIRM REGISTRATIONFile: Form D Firm reg.pdf22 Sep 2021
COURT ORDERFile: Os No 632 2014 converted.pdf22 Sep 2021
PANCHAYAT SALE DEEDFile: Panchayath Settlement and Partition Deed-converted.pdf22 Sep 2021
NOC APPLICABLE FOR BBMP PLAN APPROVALFile: NOC applicable.pdf22 Sep 2021
CertificateFile: Regsitration certifiicate.pdf-
Architect Certificate for Work Completion Schedule till DateFile: RERA - Ex 1 .png-
Engineer Certificate for Work Completion Schedule till DateFile: RERA - Ex 5.png-
CA Certificate for Funds UtilizationFile: Form - Ex3 Scanned Copy_compressed.pdf-
Architect Certificate for Pending Work Completion Schedule.File: RERA - Ex 2.png-
Engineer Certificate for Pending Work Completion Schedule.File: RERA - Ex 6.png-
CA Certificate for Funds required for Project CompletionFile: Form - Ex4 Scanned Copy_compressed.pdf-
AffidavitFile: FORM -B.pdf-
Latest Encumbrance CertificateFile: EC Copy.PDF-
Consent letter from 2/3rd of AllotteesFile: RERA extention 2.pdf-
Details Of Sold/ Un-sold UnitsFile: Flat Details Sundew zrika RERA Extention.pdf-
BBMP sanctioned letter-
Approved plan-
Approved Plan-
Performa of AOS-
SALE DEED-
SECTION PLAN-
CDP Plan-
Performa of Allotment letter-
Brochure-
Project specification-
EC-2004-2021-
Sec(3) affidavit-
JD Affidavit-
Khatha-
JDA-
RTC AKARBAND-
Converstion order-
BESCOM Declaration-
BWSSB Noc-
KSPCB Noc-
PCB Noc-
Unnamed document-
SECTION PLAN-
Approved plan-
Section plan & Specification-
Converstion order-
Legal opinion-
Balance Sheet 2019 - 2020File: Balancesheet 2020.pdf-
Balance Sheet 2018 - 2019File: Balance sheet 2019.pdf-
Balance Sheet 2017 - 2018File: Balance sheet -2018.pdf-
Audited Profit and Loss Statement 2019 - 2020File: Profit and loss 2020.pdf-
Audited Profit and Loss Statement 2018 - 2019File: Profit and loss 2019.pdf-
Audited Profit and Loss Statement 2017 - 2018File: Profit and loss-2018.pdf-
Director's Report 2019 - 2020File: FINANCIALS - PARTNERSHIP - DR & CF.pdf-
Director's Report 2018 - 2019File: FINANCIALS - PARTNERSHIP - DR & CF.pdf-
Director's Report 2017 - 2018File: FINANCIALS - PARTNERSHIP - DR & CF.pdf-
Cash Flow Statement 2019 - 2020File: FINANCIALS - PARTNERSHIP - DR & CF.pdf-
Cash Flow Statement 2018 - 2019File: FINANCIALS - PARTNERSHIP - DR & CF.pdf-
Auditor's Report 2019 - 2020File: Declaration on Audit Report.pdf-
Auditor's Report 2018 - 2019File: Declaration on Audit Report.pdf-
Auditor's Report 2017 - 2018File: Declaration on Audit Report.pdf-
Income Tax Return Acknowledgement 2019 - 2020File: ITR 2020-21.pdf-
Income Tax Return Acknowledgement 2018 - 2019File: ITR 2019-20.pdf-
Income Tax Return Acknowledgement 2017 - 2018File: ITR 2017-18.pdf-
Form-B-
Prospectus/BrochureFile: Zrika Brochure Draft Feb1 4 (1) 2_compressed.pdf-
Advertisement Copy 1File: final standy 2_compressed.pdf-
Tower Excel SheetFile: PRMKARERA1251309PR211209004579.xlsx-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep SUNDEW ZRIKA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmSUNDEW ZRIKAOther 39Dot size: filed unitsN

Filed coordinates, straight-line distance. 39 registered projects within 2 km.

Builder: SUNDEW HOMES

SUNDEW HOMES has 1 registration on RERA Karnataka, including SUNDEW ZRIKA. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if SUNDEW ZRIKA is delayed beyond 1 Sep 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of SUNDEW ZRIKA?

The registered promoter entity is SUNDEW HOMES, a partnership firm as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in SUNDEW ZRIKA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against SUNDEW ZRIKA?

Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

Who certifies construction progress at SUNDEW ZRIKA?

The professionals named in the filing: Architect: MS. VANI HEGDE; Engineer: Mr.Vijayananda. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SUNDEW ZRIKA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SUNDEW ZRIKA. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SUNDEW ZRIKA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one