Home / Browse projects / Bengaluru Urban, Karnataka / SUMERU GOKULAM
SUMERU GOKULAM
RG-KA-56879 · RERA PRM/KA/RERA/1251/310/PR/211117/004512 · Last updated on RERA Karnataka portal: 11 Nov 2021
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
SUMERU GOKULAM is a Residential/Group Housing project by SUMERU DEVELOPERS in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/211117/004512 on 17 Nov 2021. Possession is promised by 30 Jun 2023.
At a glance
Project
- NameSUMERU GOKULAM
- TypeResidential/Group Housing
- Location
- Bengaluru South
- Bengaluru Urban
- PincodeNot stated
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/310/PR/211117/004512
- ReraGenie IDRG-KA-56879
Builder
- NameSUMERU DEVELOPERS
- Entity typePartnership Firm
- Authorized SignatoryDEEPAK D
- OthersDHARANI C S, D SHEKAR, DEEPAK D, DARSHAN S
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on17 Nov 2021
- Promised completion30 Jun 2023
- Revised completionNone
- Buildings1 building record
- Documents filed72 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SUMERU GOKULAM | - | - | - | 19 | 0 | 19 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 11 Nov 2021, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
Building:
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | - |
| Foundation footing work | - |
| Retaining wall (All types) | Not applicable |
| Plinth level Beam | - |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | Not applicable |
| RCC or MS Framed structure | - |
| Masonry construction: Bricks, Concrete blocks etc | - |
| Plastering inside , outside & Ceiling | - |
| Joinery: Doors, Windows, Ventilators etc | - |
| Basic work of Water supply, Sanitary and Electrification | - |
| Dadoing, Skirting, Flooring, Tiles work (All types) | - |
| Railing and Grill fixing | - |
| Electrification, Water supply and Sanitary Finishing | - |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Fire prevention and fire fighting fitting and fixture with network | Not applicable |
| Weather Proof work(tile,concrete) | - |
| Painting | - |
| Elevation work | - |
| Internal and External work including landscapes as per santioned drawings | Not applicable |
Progress on shared amenities41
As on 11 Nov 2021, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | - |
| Internal Roads & Footpaths | No | Not applicable |
| Sewage and Drainage System | Yes | - |
| Parks & Tree planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Provision for community buildings and for treatment and disposal of sewage and sullage water | No | Not applicable |
| Solid waste management and disposal | No | Not applicable |
| Water conservation | No | Not applicable |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Education/Health/Other public amenities | No | Not applicable |
| Electricity supply transformer and substation | No | Not applicable |
| Emergency Evacuation services | No | Not applicable |
| Storm water drains | No | Not applicable |
| Use of renewable energy | No | Not applicable |
| Water conservation/rain water harvesting/recharge of ground water | No | Not applicable |
| Electricity | Yes | - |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | No | Not applicable |
| Club House | No | Not applicable |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | No | Not applicable |
| Swimming Pool | No | Not applicable |
| Gym | No | Not applicable |
| Parks | No | Not applicable |
| Power Backup | No | Not applicable |
| Gas | No | Not applicable |
| Water and Sanitation | No | Not applicable |
| Air Conditioning And incerntion | No | Not applicable |
| Staircases | Yes | - |
| Lifts | Yes | - |
| Staircases and Lift lobbies, corridor,lobbies, corridor | Yes | - |
| Fire escapes | No | Not applicable |
| Common entrance and exit for the building / common portico/foyer/verandah | Yes | - |
| Basement | No | Not applicable |
| Terrace | Yes | - |
| Outer Wall | No | Not applicable |
| Open parking areas and common storage spaces | No | Not applicable |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | No | Not applicable |
Land and ownership1
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| N MANJESH KUMAR | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | K.S. Prasanna Kumar |
| Engineer | K.S. Prasanna Kumar |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed72
As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/211117/004512 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| BWSSB NOC copy approvedFile: BWSSB NOC copy approved.pdf | 11 Nov 2021 |
| Sumeru Developers BWSSB NOCFile: Sumeru Developers BWSSB NOC.pdf | 11 Nov 2021 |
| DemandNote BWSSB NOCFile: DemandNote BWSSB NOC.pdf | 28 Oct 2021 |
| SUMERU BWSSB NOC Portal Application CopyFile: SUMERU BWSSB NOC Portal.pdf | 28 Oct 2021 |
| BWSSB NOC Application CopyFile: SUMERU BWSSB NOC Portal.pdf | 17 Oct 2021 |
| BESCOM NOC for your referenceFile: BESCOM NOC SUMERU GOKULAM.pdf | 7 Oct 2021 |
| KSPCB NOC for your referenceFile: KSPCB NOC SUMERU GOKULAM.pdf | 7 Oct 2021 |
| PROFIT and LOSS Accounts for SUMERU DEVELOPERS 2020 2021File: PROFIT and LOSS Accounts for SUMERU DEVELOPERS 2020 2021.pdf | 19 Sep 2021 |
| BALANCE SHEET for SUMERU DEVELOPERS 2020 2021File: BALANCE SHEET for SUMERU DEVELOPERS 2020 2021.pdf | 19 Sep 2021 |
| Form B affidavit for RERA with CorrectionsFile: Form B affidavit for RERA with Corrections.pdf | 19 Sep 2021 |
| Project Specifications with Authorized Signatory SignatureFile: Project Specifications with Authorized Signatory Signature.pdf | 19 Sep 2021 |
| ITR Website Not WorkingFile: ITR Website Not Working.pdf | 19 Sep 2021 |
| SUMERU DEVELOPERS BS and PL audit reports 2020 2021File: SUMERU DEVELOPERS BS and PL audit reports 2020 2021.pdf | 19 Sep 2021 |
| BESCOM NOC Declaration with BBMP Website ScreenshotFile: BESCOM NOC Declaration with BBMP Website Screenshot.pdf | 19 Sep 2021 |
| BWSSB NOC Declaration with BWSSB Website ScreenshotFile: BWSSB NOC Declaration with BWSSB Website Screenshot.pdf | 19 Sep 2021 |
| CertificateFile: FIRM REGN CERT.pdf | - |
| BUILDING LICENCE and COMMENCEMENT | - |
| APPROVED PLANS | - |
| APPROVED PLANS with BUILDING LICENCE | - |
| DRAFT SALE DEED | - |
| DRAFT SALE AGREEMENT | - |
| SALE DEED RTC | - |
| APPROVED PLANS | - |
| CDP Bengaluru Anjanapura | - |
| DRAFT ALLOTMENT LETTER | - |
| BROCHURE NOT PREPARED | - |
| PROJECT SPECIFICATION SUMERU GOKULAM | - |
| EC from 2004 to 2021 | - |
| Section 3 1 Affidavit | - |
| JDA Affidavit and JDA | - |
| KHATA RTC | - |
| JDA GPA SHARING and PARTNERSHIP DEED | - |
| RTC MR KHATA AKAR TIPPANY VILL MAP CDP | - |
| Conversion orders | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| BESCOM Declaration | - |
| BWSSB Declaration | - |
| PCB CFO NOC | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Structural Stability Certificate Sumeru Gokulam | - |
| APPROVED PLANS | - |
| APPROVED PLANS with BUILDING LICENCE | - |
| APPROVED PLANS | - |
| Conversion orders | - |
| LEGAL REPORTS | - |
| Form B Affidavit | - |
| Tower Excel SheetFile: PRMKARERA1251310PR211117004512.xlsx | - |
| Stability CertificateFile: STRUCTURAL STABILITY CERTIFICATE.pdf | - |
| Occupancy CertificateFile: BBMP OC dated 16 04 2022.pdf | - |
| Certificate of operation for lifts issued by the Chief of Department of Electrical inspectorate Government of File: LIFT APPROVALS.pdf | - |
| Sanctioned Letter issued by concerned ESCOM of Power sanction and details of transformer installed and whetherFile: TRANSFORMER APPROVAL.pdf | - |
| Sanctioned letter issued by concerned water supply and sanitary board for the projectFile: BWSSB INSPECTION REPORT.pdf | - |
| Architect certificate for having completed the work(in format no 5)File: FORM 5 ARCHITECT CERTIFICATE.pdf | - |
| Chartered Accountant certificate for having completed the work(in format no 4)File: FORM 4 CA CERTIFICATE.pdf | - |
| Affidavit cum declaration from promoter for having completed the project as per specification and as per adverFile: Declaration for Completion of the Project SUMERU GOKULAM.pdf | - |
| BESCOM FINALFile: BESCOM FINAL.pdf | - |
| DG APPROVALFile: DG APPROVAL.pdf | - |
| WORK COMPLETION CERTIFICATEFile: WORK COMPLETION CERTIFICATE.pdf | - |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep SUMERU GOKULAM on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 23 registered projects within 2 km.
Prestige Park Grove
PRESTIGE PROJECTS PRIVATE LIMITED
Prestige Lakeside Habitat
Prestige Habitat Ventures
LivingTree by Kalyani Developers
Kalyani Tech Park Private Limited
PRESTIGE FALCON CITY
PRESTIGE NOTTINGHILL INVESTMENTS
SATTVA CITY
SATTVA CITY PRIVATE LIMITED
GM AMBITIOUS ENCLAVE
M/s. Allam Infinite India Private Limited
See every Bengaluru Urban project, with the district possession charts
Builder: SUMERU DEVELOPERS
SUMERU DEVELOPERS has 1 registration on RERA Karnataka, including SUMERU GOKULAM. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if SUMERU GOKULAM is delayed beyond 30 Jun 2023?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of SUMERU GOKULAM?
The registered promoter entity is SUMERU DEVELOPERS, a partnership firm as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in SUMERU GOKULAM?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at SUMERU GOKULAM?
The professionals named in the filing: Architect: K.S. Prasanna Kumar; Engineer: K.S. Prasanna Kumar. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SUMERU GOKULAM?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback