Home / Browse projects / Bengaluru Urban, Karnataka / SUMADHURA THRIVE

Registration approved No litigation declared Commercial project

SUMADHURA THRIVE

By SUMADHURA INFRACON PRIVATE LIMITED

RG-KA-29683 · RERA PRM/KA/RERA/1251/446/PR/051024/007124 · Last updated on RERA Karnataka portal: 15 Oct 2026

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Feb 2027Possession promisedno revision filed
5 of 18Construction stages donefurthest along: RCC or MS Framed structure, 96%
21 of 21Units unsoldnot recorded sold or booked
0Complaints at RERA Karnatakaon this registration
Jump to the 169 documents Report an error

SUMADHURA THRIVE is a Commercial project by SUMADHURA INFRACON PRIVATE LIMITED in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/051024/007124 on 5 Oct 2024. Possession is promised by 15 Feb 2027. 0 of the 21 units on this registration are recorded sold or booked, and 5 of 18 construction stages are filed complete.

At a glance

Project

  • NameSUMADHURA THRIVE
  • TypeCommercial
  • Location
    • Bengaluru East
    • Bengaluru Urban
    • 560037
  • Pincode560037
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/446/PR/051024/007124
  • ReraGenie IDRG-KA-29683

Builder

  • NameSUMADHURA INFRACON PRIVATE LIMITED
  • Entity typeCompany
  • CINU45200KA2012PTC062071
  • GSTIN29AAQCS9641A1ZZ
  • Authorized SignatoryBHARAT KUMAR KANDUKURI
  • Chairman and Managing DirectorGUNDA MADHUSUDHAN
  • DirectorsBHARAT KUMAR KANDUKURI, KALAKUNTLA VENKATA RAMA RAO, G NAVEEN KUMAR, G SWAPNA, G MADHUSUDHAN, RAHUL KANDUKURI
  • Project HeadK MAHESH
  • Other registrations20 more →
  • Declared earlier projects16 →

Key dates

this monthRegisteredOct 2024PromisedFeb 2027

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on5 Oct 2024
  • Promised completion15 Feb 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed169 files

Current status

0%0 of 21 units booked
3.9%Of the estimated cost spent so far

Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
NEXUS---02424

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 18 construction stages are filed complete. The stage furthest along is RCC or MS Framed structure, at 96%.

Building: 37% average across the applicable activities

ActivityProgress
Earth work and other leveling preparation work100%
Foundation footing work100%
Upto Plinth Level100%
Sub-structure flooring (Parking Floor, more than one floor below general ground level)100%
Retaining wall (All types)100%
RCC or MS Framed structure96%
Masonry Construction22%
Plastering inside , outside & Ceiling10%
Joinery: Doors, Windows, Ventilators etc28%
Basic work of Water supply, Sanitary and Electrification12%
Dadoing, Skirting, Flooring, Tiles work (All types)0%
Railing and Grill fixing0%
Electrification, Water supply and Sanitary Finishing0%
Painting0%
Fire prevention and fire fighting fitting and fixture with network0%
Weather Proof work(tile,concrete)0%
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work0%
Internal and External work including landscapes as per sanctioned drawings0%

Progress on shared amenities40

As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes16%
Sewage and Drainage SystemYes16%
Water conservation/rain water harvesting/recharge of ground waterYes0%
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes0%
Solid waste management and disposalYes41%
Emergency Evacuation servicesYes0%
Internal Roads & FootpathsYes0%
Electricity supply transformer and substationYes0%
Storm water drainsYes0%
Use of renewable energyYes0%
Sewage Treatment Plant (STP)Yes64%
Parks & Tree plantingNoNot applicable
Street LightingYes0%
ElectricityYes0%
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes0%
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupYes0%
Piped GasNoNot applicable
Water and SanitationYes0%
Air ConditioningNoNot applicable
StaircasesYes36%
LiftsYes40%
Corridor/LobbiesYes40%
Fire escapesYes0%
Common entrance and exit for the building/common portico/foyer/verandahYes0%
BasementYes66%
TerraceYes0%
Outer WallYes0%
Open parking areasYes0%
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable
Common storage spacesNoNot applicable

Land and ownership1

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,033 sq m
Named landowners1
LandownerVillageDistrict
M/s.SRI CHAMUNDESWARI SUGARS LIMITED--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 57.19 cr
Cost incurredRs 2.22 cr
Spent of the estimate3.88%
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 32.20 crRs 2.10 cr
Payment of taxesRs 19.93 cr-
On-site expenditure-Cost Of Services(Water, Electricity, Sewage)Rs 4.53 cr-
On-site expenditure-Consultants FeesRs 51.94 lakh-
On-site expenditure-Site Overhead-Rs 8.19 lakh

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectGnanavel. T
EngineerArun Sirkanth Nadig
Chartered AccountantCH PRANAY KUMAR

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed169

As listed on the registration, under the names the promoter filed them with; the newest 80 of 169 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/051024/007124 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form 4 CA Certificate-300926 Thrive_0001.pdf15 Oct 2026
Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Form-5 Architect Certificate-300926- Thrive.pdf15 Oct 2026
Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form-6 Engineer Certificate 300926-Thrive.pdf15 Oct 2026
Q2 2026-27 Water supply and sewage board15 Oct 2026
Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres)15 Oct 2026
Q2 2026-27 KPTCL- BESCOM15 Oct 2026
Q2 2026-27 Fire and Safety15 Oct 2026
Q2 2026-27 Airport Authority of India15 Oct 2026
Q2 2026-27 BSNL/Telecommunication Department15 Oct 2026
Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form-4 CA Certificate 300626- Thrive_0001.pdf15 Jul 2026
Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Form-5 Architect Certificate-30062026 Thrive.pdf15 Jul 2026
Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form-6 Engineer Certificate 300626-Thrive.pdf15 Jul 2026
Q1 2026-27 Water supply and sewage board15 Jul 2026
Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres)15 Jul 2026
Q1 2026-27 KPTCL- BESCOM15 Jul 2026
Q1 2026-27 Fire and Safety15 Jul 2026
Q1 2026-27 Airport Authority of India15 Jul 2026
Q1 2026-27 BSNL/Telecommunication Department15 Jul 2026
Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4 CA Certificate 310326-Thrive.pdf15 Apr 2026
Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Form 5 Architect Certificate-310326-Thrive.pdf15 Apr 2026
Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form 6 Engineer Certificate 310326 Thrive.pdf15 Apr 2026
Q4 2025-26 Water supply and sewage board15 Apr 2026
Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres)15 Apr 2026
Q4 2025-26 KPTCL- BESCOM15 Apr 2026
Q4 2025-26 Fire and Safety15 Apr 2026
Q4 2025-26 Airport Authority of India15 Apr 2026
Q4 2025-26 BSNL/Telecommunication Department15 Apr 2026
Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4 CA Certificate-31122025 Thrive.pdf16 Jan 2026
Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Form 5 Architect Certificate-31122025-Thrive.pdf16 Jan 2026
Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form 6 Engineer Certificate-Nexus- 31122025.pdf16 Jan 2026
Q3 2025-26 Water supply and sewage board16 Jan 2026
Q3 2025-26 KSPCB- PCB (10 Acres to 125 Acres)16 Jan 2026
Q3 2025-26 KPTCL- BESCOM16 Jan 2026
Q3 2025-26 Fire and Safety16 Jan 2026
Q3 2025-26 Airport Authority of India16 Jan 2026
Q3 2025-26 BSNL/Telecommunication Department16 Jan 2026
Bank affidavit cost and end date updatedFile: Affidavit Bank Notarized.pdf28 Sep 2024
CA adhar self attestedFile: CA adhar self attested.pdf28 Sep 2024
CA licence(self attested)File: CA licence(self attested).pdf28 Sep 2024
Source of Funds Balance sheet FY2022-23File: Source of Funds Balance sheet FY2022-23.pdf28 Sep 2024
SIPL Audited Financials FY 2020-21File: SIPL Audited Financials FY 2020-21.pdf28 Sep 2024
SIPL Audited Financials FY 2021-22File: SIPL Audited Financials FY 2021-22.pdf28 Sep 2024
SIPL Audited Financials FY 2022-23File: SIPL Audited Financials FY 2022-23.pdf28 Sep 2024
30% Bank Account Statement certifiedFile: 30% Bank Account Statement certified.pdf28 Sep 2024
70% Bank Account Statement certifiedFile: 70% Bank Account Statement certified.pdf28 Sep 2024
100% Bank Account Statement certifiedFile: 100% Bank Account Statement certified.pdf28 Sep 2024
mother conversion orderFile: Mother Conversion order.pdf28 Sep 2024
Title Deed of Land OwnersFile: Title Deed of Land Owners.pdf28 Sep 2024
JD ClarificationFile: JD Clarification.pdf28 Sep 2024
Affidavit Non Litigation with detailsFile: Affidivat_Non-Litigation.pdf28 Sep 2024
JD Affidavit cum Declaration Promoter and LandownerFile: JD Affidavit cum Declaration Promoter and Landowner.pdf28 Sep 2024
Form B Affidavit cum DeclarationFile: Form B Affidavit cum Declaration.pdf28 Sep 2024
Advocate Seaarch Report NexusFile: Advocate Seaarch Report Nexus.pdf28 Sep 2024
Single Layout approval planFile: Single Layout Plan Clarification.pdf28 Sep 2024
Site PlanFile: 1 Site Plan.pdf28 Sep 2024
Area details updated Approved Plan NEXUSFile: Approved Plan NEXUS.pdf28 Sep 2024
Master PlanFile: 1 Site Plan.pdf28 Sep 2024
Demarked Site location in Village mapFile: Demarked Site location in Village map.pdf28 Sep 2024
Zonal Regu Buffer Lake DetailsFile: Zonal Regu Buffer Lake Details.pdf28 Sep 2024
ADLR SKETCH - NexusFile: ADLR SKETCH - Nexus.pdf28 Sep 2024
Site PlanFile: 1 Site Plan.pdf28 Sep 2024
2nd BF PLANFile: 2 2nd BF PLAN.pdf28 Sep 2024
1st BF PLANFile: 3 1st BF PLAN.pdf28 Sep 2024
GF PLANFile: 4 GF PLAN.pdf28 Sep 2024
1st to 7th TYPICALand TERRACE FLOOR PLANFile: 5 1st to 7th TYPICALand TERRACE FLOOR PLAN.pdf28 Sep 2024
SECTION & LEVATIONFile: 6 SECTION & LEVATION.pdf28 Sep 2024
KSPCB NOC Clarification (2 files merged)File: KSPCB NOC Clarification (2 files merged).pdf28 Sep 2024
SEIAA NOC Clarification (2 files merged)File: SEIAA NOC Clarification (2 files merged).pdf28 Sep 2024
Image 1File: Image 1.jpeg28 Sep 2024
Image 2File: Image 2.jpeg28 Sep 2024
Image 3File: Image 3.jpeg28 Sep 2024
Image 4File: Image 4.jpeg28 Sep 2024
Form 3 Engineer Certificate NexusFile: Form 3 Engineer Certificate Nexus.pdf28 Sep 2024
Amenities and Common area details calculation sheet certified by the EngineerFile: Amenities and Common area details calculation sheet certified by the Engineer.pdf28 Sep 2024
Structural License self attestedFile: Structural License self attested.pdf28 Sep 2024
Brief estimated cost of construction certified by the Engineer NexusFile: Brief estimated cost of construction certified by the Engineer Nexus.pdf28 Sep 2024
Project Specifications signed NEXUSFile: Project Specifications signed NEXUS.pdf28 Sep 2024
Notarized Affidavit for 3(1) Voliation ackFile: Notarized Affidavit for 3(1) Voliation ack.pdf28 Sep 2024
Allotment Letter NexusFile: Allotment Letter Nexus.pdf28 Sep 2024
Agreement of Sale NexusFile: Agreement of Sale Nexus.pdf28 Sep 2024

Promoter's earlier projects4

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

4 not delivered by the promised date
ProjectLocationStatusPromisedDelivered
FOLIUM BY SUMADHURA PHASE-IIIBBMP Katha No 650/389 Sy No 47/1 47/2A 47/2B 48/3 48/4 47/3 48/1C Whitefiled Village K R Puram Hobli Bangalore East TalukOngoingDec 2025Not delivered
FOLIUM BY SUMADHURA PHASE-IIBBMP Katha No 650/389 Sy No 47/1 47/2A 47/2B 48/3 48/4 47/3 48/1C Whitefiled Village K R Puram Hobli Bangalore East TalukOngoingDec 2025Not delivered
FOLIUM BY SUMADHURA PHASE-IBBMP Katha No 650/389 Sy No 47/1 47/2A & B 48/3 48/4 47/3 Whitefiled Village K R Puram Hobli Bangalore East TalukOngoingJun 2025Not delivered
SUMADHURA SUSHANTHAM PHASE-IIBBMP Katha No 1583 Sy No 3/7 3/8A 3/8B 3/8C Thindlu Village Yelahanka Hobli Bangalore North TalukOngoingDec 2024Not delivered

How this compares with Bengaluru Urban

0%of this project is bookeddistrict median 51%
34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep SUMADHURA THRIVE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmSUMADHURA THRIVEOther 45Dot size: filed unitsN

Filed coordinates, straight-line distance. 45 registered projects within 2 km.

Builder: SUMADHURA INFRACON PRIVATE LIMITED

SUMADHURA INFRACON PRIVATE LIMITED has 21 registrations on RERA Karnataka, including Sumadhura Belfort and SUMADHURA SUSHANTHAM PHASE I. Its filings declare 16 earlier projects, 11 of them declared completed. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if SUMADHURA THRIVE is delayed beyond 15 Feb 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of SUMADHURA THRIVE?

The registered promoter entity is SUMADHURA INFRACON PRIVATE LIMITED, a company as per the filing. Its CIN U45200KA2012PTC062071 and GSTIN 29AAQCS9641A1ZZ can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in SUMADHURA THRIVE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at SUMADHURA THRIVE?

The professionals named in the filing: Architect: Gnanavel. T; Engineer: Arun Sirkanth Nadig; Chartered Accountant: CH PRANAY KUMAR. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SUMADHURA THRIVE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SUMADHURA THRIVE. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SUMADHURA THRIVE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.