Home / Browse projects / Bengaluru Urban, Karnataka / SUMADHURA THRIVE
SUMADHURA THRIVE
By SUMADHURA INFRACON PRIVATE LIMITED
RG-KA-29683 · RERA PRM/KA/RERA/1251/446/PR/051024/007124 · Last updated on RERA Karnataka portal: 15 Oct 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
SUMADHURA THRIVE is a Commercial project by SUMADHURA INFRACON PRIVATE LIMITED in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/051024/007124 on 5 Oct 2024. Possession is promised by 15 Feb 2027. 0 of the 21 units on this registration are recorded sold or booked, and 5 of 18 construction stages are filed complete.
At a glance
Project
- NameSUMADHURA THRIVE
- TypeCommercial
- Location
- Bengaluru East
- Bengaluru Urban
- 560037
- Pincode560037
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/446/PR/051024/007124
- ReraGenie IDRG-KA-29683
Builder
- NameSUMADHURA INFRACON PRIVATE LIMITED
- Entity typeCompany
- CINU45200KA2012PTC062071
- GSTIN29AAQCS9641A1ZZ
- Authorized SignatoryBHARAT KUMAR KANDUKURI
- Chairman and Managing DirectorGUNDA MADHUSUDHAN
- DirectorsBHARAT KUMAR KANDUKURI, KALAKUNTLA VENKATA RAMA RAO, G NAVEEN KUMAR, G SWAPNA, G MADHUSUDHAN, RAHUL KANDUKURI
- Project HeadK MAHESH
- Other registrations20 more →
- Declared earlier projects16 →
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on5 Oct 2024
- Promised completion15 Feb 2027
- Revised completionNone
- Buildings1 building record
- Documents filed169 files
Current status
Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| NEXUS | - | - | - | 0 | 24 | 24 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 18 construction stages are filed complete. The stage furthest along is RCC or MS Framed structure, at 96%.
Building: 37% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 100% |
| Foundation footing work | 100% |
| Upto Plinth Level | 100% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 100% |
| Retaining wall (All types) | 100% |
| RCC or MS Framed structure | 96% |
| Masonry Construction | 22% |
| Plastering inside , outside & Ceiling | 10% |
| Joinery: Doors, Windows, Ventilators etc | 28% |
| Basic work of Water supply, Sanitary and Electrification | 12% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 0% |
| Railing and Grill fixing | 0% |
| Electrification, Water supply and Sanitary Finishing | 0% |
| Painting | 0% |
| Fire prevention and fire fighting fitting and fixture with network | 0% |
| Weather Proof work(tile,concrete) | 0% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | 0% |
| Internal and External work including landscapes as per sanctioned drawings | 0% |
Progress on shared amenities40
As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 16% |
| Sewage and Drainage System | Yes | 16% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 0% |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Solid waste management and disposal | Yes | 41% |
| Emergency Evacuation services | Yes | 0% |
| Internal Roads & Footpaths | Yes | 0% |
| Electricity supply transformer and substation | Yes | 0% |
| Storm water drains | Yes | 0% |
| Use of renewable energy | Yes | 0% |
| Sewage Treatment Plant (STP) | Yes | 64% |
| Parks & Tree planting | No | Not applicable |
| Street Lighting | Yes | 0% |
| Electricity | Yes | 0% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | 0% |
| Club House | No | Not applicable |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | No | Not applicable |
| Swimming Pool | No | Not applicable |
| Gym | No | Not applicable |
| Parks | No | Not applicable |
| Power Backup | Yes | 0% |
| Piped Gas | No | Not applicable |
| Water and Sanitation | Yes | 0% |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | 36% |
| Lifts | Yes | 40% |
| Corridor/Lobbies | Yes | 40% |
| Fire escapes | Yes | 0% |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | 0% |
| Basement | Yes | 66% |
| Terrace | Yes | 0% |
| Outer Wall | Yes | 0% |
| Open parking areas | Yes | 0% |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | No | Not applicable |
| Common storage spaces | No | Not applicable |
Land and ownership1
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| M/s.SRI CHAMUNDESWARI SUGARS LIMITED | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 32.20 cr | Rs 2.10 cr |
| Payment of taxes | Rs 19.93 cr | - |
| On-site expenditure-Cost Of Services(Water, Electricity, Sewage) | Rs 4.53 cr | - |
| On-site expenditure-Consultants Fees | Rs 51.94 lakh | - |
| On-site expenditure-Site Overhead | - | Rs 8.19 lakh |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Gnanavel. T |
| Engineer | Arun Sirkanth Nadig |
| Chartered Accountant | CH PRANAY KUMAR |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed169
As listed on the registration, under the names the promoter filed them with; the newest 80 of 169 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/051024/007124 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form 4 CA Certificate-300926 Thrive_0001.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Form-5 Architect Certificate-300926- Thrive.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form-6 Engineer Certificate 300926-Thrive.pdf | 15 Oct 2026 |
| Q2 2026-27 Water supply and sewage board | 15 Oct 2026 |
| Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 15 Oct 2026 |
| Q2 2026-27 KPTCL- BESCOM | 15 Oct 2026 |
| Q2 2026-27 Fire and Safety | 15 Oct 2026 |
| Q2 2026-27 Airport Authority of India | 15 Oct 2026 |
| Q2 2026-27 BSNL/Telecommunication Department | 15 Oct 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form-4 CA Certificate 300626- Thrive_0001.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Form-5 Architect Certificate-30062026 Thrive.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form-6 Engineer Certificate 300626-Thrive.pdf | 15 Jul 2026 |
| Q1 2026-27 Water supply and sewage board | 15 Jul 2026 |
| Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 15 Jul 2026 |
| Q1 2026-27 KPTCL- BESCOM | 15 Jul 2026 |
| Q1 2026-27 Fire and Safety | 15 Jul 2026 |
| Q1 2026-27 Airport Authority of India | 15 Jul 2026 |
| Q1 2026-27 BSNL/Telecommunication Department | 15 Jul 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4 CA Certificate 310326-Thrive.pdf | 15 Apr 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Form 5 Architect Certificate-310326-Thrive.pdf | 15 Apr 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form 6 Engineer Certificate 310326 Thrive.pdf | 15 Apr 2026 |
| Q4 2025-26 Water supply and sewage board | 15 Apr 2026 |
| Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 15 Apr 2026 |
| Q4 2025-26 KPTCL- BESCOM | 15 Apr 2026 |
| Q4 2025-26 Fire and Safety | 15 Apr 2026 |
| Q4 2025-26 Airport Authority of India | 15 Apr 2026 |
| Q4 2025-26 BSNL/Telecommunication Department | 15 Apr 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4 CA Certificate-31122025 Thrive.pdf | 16 Jan 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Form 5 Architect Certificate-31122025-Thrive.pdf | 16 Jan 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form 6 Engineer Certificate-Nexus- 31122025.pdf | 16 Jan 2026 |
| Q3 2025-26 Water supply and sewage board | 16 Jan 2026 |
| Q3 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 16 Jan 2026 |
| Q3 2025-26 KPTCL- BESCOM | 16 Jan 2026 |
| Q3 2025-26 Fire and Safety | 16 Jan 2026 |
| Q3 2025-26 Airport Authority of India | 16 Jan 2026 |
| Q3 2025-26 BSNL/Telecommunication Department | 16 Jan 2026 |
| Bank affidavit cost and end date updatedFile: Affidavit Bank Notarized.pdf | 28 Sep 2024 |
| CA adhar self attestedFile: CA adhar self attested.pdf | 28 Sep 2024 |
| CA licence(self attested)File: CA licence(self attested).pdf | 28 Sep 2024 |
| Source of Funds Balance sheet FY2022-23File: Source of Funds Balance sheet FY2022-23.pdf | 28 Sep 2024 |
| SIPL Audited Financials FY 2020-21File: SIPL Audited Financials FY 2020-21.pdf | 28 Sep 2024 |
| SIPL Audited Financials FY 2021-22File: SIPL Audited Financials FY 2021-22.pdf | 28 Sep 2024 |
| SIPL Audited Financials FY 2022-23File: SIPL Audited Financials FY 2022-23.pdf | 28 Sep 2024 |
| 30% Bank Account Statement certifiedFile: 30% Bank Account Statement certified.pdf | 28 Sep 2024 |
| 70% Bank Account Statement certifiedFile: 70% Bank Account Statement certified.pdf | 28 Sep 2024 |
| 100% Bank Account Statement certifiedFile: 100% Bank Account Statement certified.pdf | 28 Sep 2024 |
| mother conversion orderFile: Mother Conversion order.pdf | 28 Sep 2024 |
| Title Deed of Land OwnersFile: Title Deed of Land Owners.pdf | 28 Sep 2024 |
| JD ClarificationFile: JD Clarification.pdf | 28 Sep 2024 |
| Affidavit Non Litigation with detailsFile: Affidivat_Non-Litigation.pdf | 28 Sep 2024 |
| JD Affidavit cum Declaration Promoter and LandownerFile: JD Affidavit cum Declaration Promoter and Landowner.pdf | 28 Sep 2024 |
| Form B Affidavit cum DeclarationFile: Form B Affidavit cum Declaration.pdf | 28 Sep 2024 |
| Advocate Seaarch Report NexusFile: Advocate Seaarch Report Nexus.pdf | 28 Sep 2024 |
| Single Layout approval planFile: Single Layout Plan Clarification.pdf | 28 Sep 2024 |
| Site PlanFile: 1 Site Plan.pdf | 28 Sep 2024 |
| Area details updated Approved Plan NEXUSFile: Approved Plan NEXUS.pdf | 28 Sep 2024 |
| Master PlanFile: 1 Site Plan.pdf | 28 Sep 2024 |
| Demarked Site location in Village mapFile: Demarked Site location in Village map.pdf | 28 Sep 2024 |
| Zonal Regu Buffer Lake DetailsFile: Zonal Regu Buffer Lake Details.pdf | 28 Sep 2024 |
| ADLR SKETCH - NexusFile: ADLR SKETCH - Nexus.pdf | 28 Sep 2024 |
| Site PlanFile: 1 Site Plan.pdf | 28 Sep 2024 |
| 2nd BF PLANFile: 2 2nd BF PLAN.pdf | 28 Sep 2024 |
| 1st BF PLANFile: 3 1st BF PLAN.pdf | 28 Sep 2024 |
| GF PLANFile: 4 GF PLAN.pdf | 28 Sep 2024 |
| 1st to 7th TYPICALand TERRACE FLOOR PLANFile: 5 1st to 7th TYPICALand TERRACE FLOOR PLAN.pdf | 28 Sep 2024 |
| SECTION & LEVATIONFile: 6 SECTION & LEVATION.pdf | 28 Sep 2024 |
| KSPCB NOC Clarification (2 files merged)File: KSPCB NOC Clarification (2 files merged).pdf | 28 Sep 2024 |
| SEIAA NOC Clarification (2 files merged)File: SEIAA NOC Clarification (2 files merged).pdf | 28 Sep 2024 |
| Image 1File: Image 1.jpeg | 28 Sep 2024 |
| Image 2File: Image 2.jpeg | 28 Sep 2024 |
| Image 3File: Image 3.jpeg | 28 Sep 2024 |
| Image 4File: Image 4.jpeg | 28 Sep 2024 |
| Form 3 Engineer Certificate NexusFile: Form 3 Engineer Certificate Nexus.pdf | 28 Sep 2024 |
| Amenities and Common area details calculation sheet certified by the EngineerFile: Amenities and Common area details calculation sheet certified by the Engineer.pdf | 28 Sep 2024 |
| Structural License self attestedFile: Structural License self attested.pdf | 28 Sep 2024 |
| Brief estimated cost of construction certified by the Engineer NexusFile: Brief estimated cost of construction certified by the Engineer Nexus.pdf | 28 Sep 2024 |
| Project Specifications signed NEXUSFile: Project Specifications signed NEXUS.pdf | 28 Sep 2024 |
| Notarized Affidavit for 3(1) Voliation ackFile: Notarized Affidavit for 3(1) Voliation ack.pdf | 28 Sep 2024 |
| Allotment Letter NexusFile: Allotment Letter Nexus.pdf | 28 Sep 2024 |
| Agreement of Sale NexusFile: Agreement of Sale Nexus.pdf | 28 Sep 2024 |
Promoter's earlier projects4
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Status | Promised | Delivered |
|---|---|---|---|---|
| FOLIUM BY SUMADHURA PHASE-III | BBMP Katha No 650/389 Sy No 47/1 47/2A 47/2B 48/3 48/4 47/3 48/1C Whitefiled Village K R Puram Hobli Bangalore East Taluk | Ongoing | Dec 2025 | Not delivered |
| FOLIUM BY SUMADHURA PHASE-II | BBMP Katha No 650/389 Sy No 47/1 47/2A 47/2B 48/3 48/4 47/3 48/1C Whitefiled Village K R Puram Hobli Bangalore East Taluk | Ongoing | Dec 2025 | Not delivered |
| FOLIUM BY SUMADHURA PHASE-I | BBMP Katha No 650/389 Sy No 47/1 47/2A & B 48/3 48/4 47/3 Whitefiled Village K R Puram Hobli Bangalore East Taluk | Ongoing | Jun 2025 | Not delivered |
| SUMADHURA SUSHANTHAM PHASE-II | BBMP Katha No 1583 Sy No 3/7 3/8A 3/8B 3/8C Thindlu Village Yelahanka Hobli Bangalore North Taluk | Ongoing | Dec 2024 | Not delivered |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep SUMADHURA THRIVE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 45 registered projects within 2 km.
MAITHRI SPRINGWOODS
MAITHRI DEVELOPERS
Century Mirai Ph1
Century Silicon City Private Limited
MYHNA ORCHID
MYHNA ESTATE PROJECTS
INNOVATIVE PALACIA
SHUBANKARA DEVELOPERS
Saideep Hiranya
Shri Saideep Srinidhi Buildcon LLP
77° LIFE
DivyaSree Infrastructure Projects Private
See every Bengaluru Urban project, with the district possession charts
Builder: SUMADHURA INFRACON PRIVATE LIMITED
SUMADHURA INFRACON PRIVATE LIMITED has 21 registrations on RERA Karnataka, including Sumadhura Belfort and SUMADHURA SUSHANTHAM PHASE I. Its filings declare 16 earlier projects, 11 of them declared completed. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if SUMADHURA THRIVE is delayed beyond 15 Feb 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of SUMADHURA THRIVE?
The registered promoter entity is SUMADHURA INFRACON PRIVATE LIMITED, a company as per the filing. Its CIN U45200KA2012PTC062071 and GSTIN 29AAQCS9641A1ZZ can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in SUMADHURA THRIVE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at SUMADHURA THRIVE?
The professionals named in the filing: Architect: Gnanavel. T; Engineer: Arun Sirkanth Nadig; Chartered Accountant: CH PRANAY KUMAR. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SUMADHURA THRIVE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.