ReraGenieLog inGet a buyer report

Home / Browse projects / Bengaluru Urban, Karnataka / SUMADHURA CAPITOL RESIDENCES

Registration approved No litigation declared Residential/Group Housing project

SUMADHURA CAPITOL RESIDENCES

By SUMADHURA INFRACON PRIVATE LIMITED

RG-KA-87145 · RERA PRM/KA/RERA/1251/446/PR/051024/007125 · Last updated on RERA Karnataka portal: 15 Oct 2026

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Dec 2027Possession promisedno revision filed
4 of 17Construction stages donefurthest along: RCC or MS Framed structure, 95%
124 of 405Units unsoldnot recorded sold or booked
0Complaints at RERA Karnatakaon this registration
Jump to the 158 documents Report an error

SUMADHURA CAPITOL RESIDENCES is a Residential/Group Housing project by SUMADHURA INFRACON PRIVATE LIMITED in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/051024/007125 on 5 Oct 2024. Possession is promised by 31 Dec 2027. 281 of the 405 units on this registration are recorded sold or booked, and 4 of 17 construction stages are filed complete.

At a glance

Project

  • NameSUMADHURA CAPITOL RESIDENCES
  • TypeResidential/Group Housing
  • Location
    • Bengaluru East
    • Bengaluru Urban
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1251/446/PR/051024/007125
  • ReraGenie IDRG-KA-87145

Builder

  • NameSUMADHURA INFRACON PRIVATE LIMITED
  • Entity typeCompany
  • CINU45200KA2012PTC062071
  • GSTIN29AAQCS9641A1ZZ
  • Authorized SignatoryBHARAT KUMAR KANDUKURI
  • Chairman and Managing DirectorGUNDA MADHUSUDHAN
  • DirectorsBHARAT KUMAR KANDUKURI, KALAKUNTLA VENKATA RAMA RAO, G NAVEEN KUMAR, G SWAPNA, G MADHUSUDHAN, RAHUL KANDUKURI
  • Project HeadK MAHESH
  • Other registrations20 more →
  • Declared earlier projects16 →

Key dates

this monthRegisteredOct 2024PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on5 Oct 2024
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings4 building records
  • Documents filed158 files

Current status

69%281 of 405 units booked
19.3%Of the estimated cost spent so far

Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TOWER-BEACON---1050105
TOWER-PINNACLE---96096
TOWER-SUMMIT---1100110
TOWER-TRIUMPH---94094

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 17 construction stages are filed complete. The stage furthest along is RCC or MS Framed structure, at 95%.

Building: 47% average across the applicable activities

ActivityProgress
Earth work and other leveling preparation work100%
Foundation footing work100%
Upto Plinth Level100%
Sub-structure flooring (Parking Floor, more than one floor below general ground level)100%
Retaining wall (All types)84%
RCC or MS Framed structure95%
Masonry Construction50%
Plastering inside , outside & Ceiling50%
Joinery: Doors, Windows, Ventilators etc10%
Basic work of Water supply, Sanitary and Electrification10%
Dadoing, Skirting, Flooring, Tiles work (All types)38%
Railing and Grill fixing0%
Electrification, Water supply and Sanitary Finishing12%
Painting12%
Fire prevention and fire fighting fitting and fixture with network18%
Weather Proof work(tile,concrete)12%
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation workNot applicable
Internal and External work including landscapes as per sanctioned drawings0%

Progress on shared amenities40

As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes17%
Sewage and Drainage SystemYes37%
Water conservation/rain water harvesting/recharge of ground waterYes0%
Energy managementYes0%
Fire protection and fire safety requirementsYes12%
Solid waste management and disposalYes32%
Emergency Evacuation servicesYes0%
Internal Roads & FootpathsYes0%
Electricity supply transformer and substationYes0%
Storm water drainsYes0%
Use of renewable energyYes0%
Sewage Treatment Plant (STP)Yes50%
Parks & Tree plantingYes0%
Street LightingYes0%
ElectricityYes14%
Smart Home AutomationYes0%
CCTV SurveillanceYes0%
Club HouseYes30%
Community HallYes0%
Outdoor Sports facilityYes0%
Indoor Sports facilityYes0%
Swimming PoolYes0%
GymYes0%
ParksYes0%
Power BackupYes0%
Piped GasYes0%
Water and SanitationYes0%
Air ConditioningYes0%
StaircasesYes65%
LiftsYes36%
Corridor/LobbiesYes56%
Fire escapesYes0%
Common entrance and exit for the building/common portico/foyer/verandahYes0%
BasementYes76%
TerraceYes32%
Outer WallYes0%
Open parking areasNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes0%
Common storage spacesYes0%

Land and ownership1

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Named landowners1
LandownerVillageDistrict
Sumadhura Infracon Private Limited--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 401.90 cr
Cost incurredRs 77.72 cr
Spent of the estimate19.34%
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 265.40 crRs 63.33 cr
On-site expenditure-Salaries of workersRs 51.75 cr-
Principal sum and interest payable to financial institutions-Non Banking financial institution (NBFC)Rs 42.42 cr-
Payment of taxesRs 39.81 crRs 4.59 cr
On-site expenditure-Consultants FeesRs 2.51 cr-
On-site expenditure-Site Overhead-Rs 4.66 cr

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectIndrajith S Kembhavi
EngineerArun Karanth N
Chartered AccountantCH PRANAY KUMAR

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed158

As listed on the registration, under the names the promoter filed them with; the newest 80 of 158 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/051024/007125 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form 4 CA Certificate-300926 SCR_0001.pdf15 Oct 2026
Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Form 5 Architect Certificate 30092026 SCR.pdf15 Oct 2026
Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form-6 Engineer Certificate 300926-SCR.pdf15 Oct 2026
Q2 2026-27 Water supply and sewage board15 Oct 2026
Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres)15 Oct 2026
Q2 2026-27 KSPCB- MOEF (Above 50 Acres)15 Oct 2026
Q2 2026-27 KPTCL- BESCOM15 Oct 2026
Q2 2026-27 Fire and Safety15 Oct 2026
Q2 2026-27 Airport Authority of India15 Oct 2026
Q2 2026-27 BSNL/Telecommunication Department15 Oct 2026
Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form 4 CA Certificate And Complaint Details 300626 SCR.pdf15 Jul 2026
Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Form-5 Architect Certificate-30062026-SCR.pdf15 Jul 2026
Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form-6 Engineer Certificate 300626-SCR.pdf15 Jul 2026
Q1 2026-27 Water supply and sewage board15 Jul 2026
Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres)15 Jul 2026
Q1 2026-27 KSPCB- MOEF (Above 50 Acres)15 Jul 2026
Q1 2026-27 KPTCL- BESCOM15 Jul 2026
Q1 2026-27 Fire and Safety15 Jul 2026
Q1 2026-27 Airport Authority of India15 Jul 2026
Q1 2026-27 BSNL/Telecommunication Department15 Jul 2026
Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4 CA Certificate 310326 SCR_0001.pdf15 Apr 2026
Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Form 5 Architect Certificate- MAR 26 - SCR.pdf15 Apr 2026
Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form 6 Engineer Certificate 310326 RCS.pdf15 Apr 2026
Q4 2025-26 Water supply and sewage board15 Apr 2026
Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres)15 Apr 2026
Q4 2025-26 KSPCB- MOEF (Above 50 Acres)15 Apr 2026
Q4 2025-26 KPTCL- BESCOM15 Apr 2026
Q4 2025-26 Fire and Safety15 Apr 2026
Q4 2025-26 Airport Authority of India15 Apr 2026
Q4 2025-26 BSNL/Telecommunication Department15 Apr 2026
Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4 CA Certificate 31122025 SCR.pdf14 Jan 2026
Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Form 5 Architect Certificate 31122025 SCR.pdf14 Jan 2026
Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form 6 Engineer Certificate 31122025 SCR.pdf14 Jan 2026
Q3 2025-26 Water supply and sewage board14 Jan 2026
Q3 2025-26 KSPCB- PCB (10 Acres to 125 Acres)14 Jan 2026
Q3 2025-26 KSPCB- MOEF (Above 50 Acres)14 Jan 2026
Q3 2025-26 KPTCL- BESCOM14 Jan 2026
Q3 2025-26 Fire and Safety14 Jan 2026
Q3 2025-26 Airport Authority of India14 Jan 2026
Q3 2025-26 BSNL/Telecommunication Department14 Jan 2026
Affidavit Bank SCRFile: Affidavit Bank SCR.pdf26 Sep 2024
Tata Captitol resi Sanction letterFile: Tata Captitol resi Sanction letter.pdf26 Sep 2024
financial statement, unsecured loans and borrowings detailsFile: financial statement, unsecured loans and borrowings details.pdf26 Sep 2024
Project registration fees paid not as per total land area clarification letterFile: Project registration fees paid not as per total land area clarification letter.pdf26 Sep 2024
Company Registered CertificateFile: Company Registration Certificate.pdf26 Sep 2024
SIPL Audited Financials FY 2020-21File: SIPL Audited Financials FY 2020-21.pdf26 Sep 2024
SIPL Audited Financials FY 2021-22File: SIPL Audited Financials FY 2021-22.pdf26 Sep 2024
SIPL Audited Financials FY 2022-23File: SIPL Audited Financials FY 2022-23.pdf26 Sep 2024
Affidivat_Non-Litigation NotarizedFile: Affidivat_Non-Litigation Notarized.pdf26 Sep 2024
Advocate Search ReportFile: Advocate Search Report.pdf26 Sep 2024
Single Layout approval plan SCRFile: Single Layout approval plan SCR.pdf26 Sep 2024
Single Layout DP approval Order SCRFile: Single Layout DP approval Order SCR.pdf26 Sep 2024
BBMP approved PlansFile: BBMP Approved Plan PRJ_1228_24-25 SCR.pdf26 Sep 2024
Area details and plan details mention in the project is not matching with approved planFile: Area details and plan details mention in the project is not matching with approved plan.pd26 Sep 2024
Extract of Master Plan proposed area with consent authority seal and signatureFile: Extract of Master Plan proposed area with consent authority seal and signature.pdf26 Sep 2024
ZR CopyFile: Zonal Regu Buffer Lake Details.pdf26 Sep 2024
ADLR SketchFile: ADLR Sketch.pdf26 Sep 2024
SITE PLANFile: 01 SITE PLAN.pdf26 Sep 2024
3rd BF PLANFile: 02 3rd BF PLAN.pdf26 Sep 2024
2nd BF PLANFile: 03 2nd BF PLAN.pdf26 Sep 2024
3rd BF PLANFile: 04 3rd BF PLAN.pdf26 Sep 2024
GF PLANFile: 05 GF PLAN.pdf26 Sep 2024
1st FLOOR PLANFile: 06 1st FLOOR PLAN.pdf26 Sep 2024
TYPICAL 2ND TO 8TH FLOOR PLANFile: 07 TYPICAL 2ND TO 8TH FLOOR PLAN.pdf26 Sep 2024
TYPICAL 9TH TO 15TH FLOOR PLANFile: 08 TYPICAL 9TH TO 15TH FLOOR PLAN.pdf26 Sep 2024
TERRACE FLOOR PLANFile: 09 TERRACE FLOOR PLAN.pdf26 Sep 2024
ELEVATIONFile: 10 ELEVATION.pdf26 Sep 2024
SECTIONFile: 11 SECTION.pdf26 Sep 2024
KSPCB ACK Application ClarificationFile: KSPCB ACK Application Clarification.pdf26 Sep 2024
MOEF NOC (Clarification)File: MOEF NOC (Clarification).pdf26 Sep 2024
Structural License (self attested)File: Structural License (self attested).pdf26 Sep 2024
Amenities and Common area details calculation sheet certified by the EngineerFile: Amenities and Common area details calculation sheet certified by the Engineer.pdf26 Sep 2024
Form 3 Engineer Certificate SCRFile: Form 3 Engineer Certificate SCR.pdf26 Sep 2024
STP Design drawing as per the Guidelines of KSPCB NOC Certified by the EngineerFile: STP Design drawing as per the Guidelines of KSPCB NOC Certified by the Engineer.pdf26 Sep 2024
HAL NOCFile: NOC HAL SCR.PDF26 Sep 2024
Land cost calculation sheet as per the guidance value(self-attested copy)File: Land cost calculation sheet as per the guidance value(self-attested copy).pdf26 Sep 2024
NOC BOREWELL-Drinking and ConstructionFile: NOC BOREWELL-Drinking and Construction.pdf26 Sep 2024
Proforma of Allotment LetterFile: Proforma Of Allotment Letter - SCR.pdf26 Sep 2024
Agreement Of Sale SCRFile: Agreement Of Sale SCR.pdf26 Sep 2024
Brief estimated cost of construction certified by the Engineer SCRFile: Brief estimated cost of construction certified by the Engineer SCR.pdf26 Sep 2024

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 not delivered by the promised date
ProjectLocationStatusPromisedDelivered
FOLIUM BY SUMADHURA PHASE-IBBMP Katha No 650/389 Sy No 47/1 47/2A & B 48/3 48/4 47/3 Whitefiled Village K R Puram Hobli Bangalore East TalukOngoingJun 2025Not delivered
SUMADHURA SUSHANTHAM PHASE-IIBBMP Katha No 1583 Sy No 3/7 3/8A 3/8B 3/8C Thindlu Village Yelahanka Hobli Bangalore North TalukOngoingDec 2024Not delivered

How this compares with Bengaluru Urban

69%of this project is bookeddistrict median 51%
34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep SUMADHURA CAPITOL RESIDENCES on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

Builder: SUMADHURA INFRACON PRIVATE LIMITED

SUMADHURA INFRACON PRIVATE LIMITED has 21 registrations on RERA Karnataka, including Sumadhura Belfort and SUMADHURA SUSHANTHAM PHASE I. Its filings declare 16 earlier projects, 11 of them declared completed. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if SUMADHURA CAPITOL RESIDENCES is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of SUMADHURA CAPITOL RESIDENCES?

The registered promoter entity is SUMADHURA INFRACON PRIVATE LIMITED, a company as per the filing. Its CIN U45200KA2012PTC062071 and GSTIN 29AAQCS9641A1ZZ can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in SUMADHURA CAPITOL RESIDENCES?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at SUMADHURA CAPITOL RESIDENCES?

The professionals named in the filing: Architect: Indrajith S Kembhavi; Engineer: Arun Karanth N; Chartered Accountant: CH PRANAY KUMAR. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SUMADHURA CAPITOL RESIDENCES?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SUMADHURA CAPITOL RESIDENCES. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SUMADHURA CAPITOL RESIDENCES to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.