Home / Browse projects / Mumbai Suburban, Maharashtra / Suji Platinum
Suji Platinum
By Shraddha Platinum Builders and Developers
RG-MH-06679 · RERA P51800053230 · Last updated on MahaRERA portal: 4 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 1 complaint at MahaRERA
- Completion date moved by 23 months
- 1 extension taken
Clear
- No litigation declared
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Suji Platinum is a Others project by Shraddha Platinum Builders and Developers in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800053230 on 23 Oct 2023. Possession is promised by 31 Dec 2027. The completion date has moved by 23 months from the original filing. 94 of the 166 units on this registration are recorded sold or booked, and 2 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameSuji Platinum
- TypeOthers
- Location
- C.T.S. No. 356/A/2/1
- S. No. 113 (Pt.)- Kannamwar Nagar
- Hariyali- Vikhroli (East)
- Hariyali
- Kurla
- Mumbai Suburban
- 400083
- Pincode400083
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800053230
- ReraGenie IDRG-MH-06679
Builder
- NameShraddha Platinum Builders and Developers
- Entity typePartnership
- PartnersHira Pancha Vavia, Nathabhai Bhimabhai Isasaria, Parvaz Hakimuddin Shaikh, Pankaj Manji Vaid, Mahesh Amrutlal isasariya, Narendra Bhimji Isasariya, Khoda Pancha Vavia, Rajesh Ravjibhai Donga, Jitendra Dattatray Ghadigaonkar
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on23 Oct 2023
- Promised completion31 Dec 2027
- Revised completionRevised to 31 Dec 2027 (originally 31 Jan 2026)
- Buildings1 building record
- Documents filed73 files
Current status
Figures as on 4 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Suji Platinum | NA | 2 | 2 | 166 | 0 | 166 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 4 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
2 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.
Suji Platinum: 18% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 4 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Kannamwar Nagar Aditya Co-Op Housing Society LTD | Vikhroli | Mumbai Suburban |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Suji Platinum | NA | Rs 43.69 cr | Rs 9.27 cr |
| - | NA | Rs 1.62 cr | - |
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Archo Consultants |
| Engineer | Vinayak Chopdekar & Associates |
| Chartered Accountant | Pritam Nevrekar & Associates |
| Partner | Role in project |
|---|---|
| Shraddha Platinum Builders and Developers | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterWe apologize for the delay in the completion of the project and the submission of this request. At the time of initial registration, our project was registered for a short duration of 27 months (from 23rd October 2023 to 31st January 2026), based on an optimistic completion timeline. The project work commenced in October 2023. However, due to certain genuine and technical reasons, the project progress has been delayed. The key factors contributing to the delay are summarized below: 1. Small Plot Size & Phased Construction: Due to the limited plot area, simultaneous construction across the site
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12604021 | MOHINI AJAY TAMBE | Shraddha Platinum Builders and Developers | 28/06/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 22 Sep 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 23 Feb 2026 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 23 Feb 2026 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 10 Oct 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2027
Documents filed73
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 - Suji Platinum as on Mar 2026.pdf | 4 May 2026 |
| Withdrawal Update Form 2File: Form 2 - Suji Platinum as on Mar 2026.pdf | 4 May 2026 |
| Withdrawal Update Form 3File: Form 3 - Suji Platinum as on Mar 2026.pdf | 4 May 2026 |
| Withdrawal Update Form 1File: Form-1 December 2025.pdf | 27 Feb 2026 |
| Withdrawal Update Form 1File: Form-1 December 2025.pdf | 27 Feb 2026 |
| Withdrawal Update Form 2File: Form-2 December 2025_compressed.pdf | 27 Feb 2026 |
| Withdrawal Update Form 2File: Form-2 December 2025_compressed.pdf | 27 Feb 2026 |
| Withdrawal Update Form 3File: Form 3 -31-12-25.pdf | 27 Feb 2026 |
| Withdrawal Update Form 3File: Form 3 -31-12-25.pdf | 27 Feb 2026 |
| Layout approvalFile: Layout.pdf | 23 Feb 2026 |
| Building plan approvalFile: Builidng Plans - 1.pdf | 23 Feb 2026 |
| Building plan approvalFile: Builidng plans - 2.pdf | 23 Feb 2026 |
| Layout approvalFile: IOA.pdf | 23 Feb 2026 |
| Withdrawal Update Form 1File: Form-1 December 2025.pdf | 23 Feb 2026 |
| Withdrawal Update Form 2File: Form-2 December 2025_compressed.pdf | 23 Feb 2026 |
| Withdrawal Update Form 3File: Form 3 - Suji Platinum as on Sept 2025.pdf | 23 Feb 2026 |
| Withdrawal Update Form 1File: Form 1 - Suji Platinum as on Sept 2025.pdf | 5 Jan 2026 |
| Withdrawal Update Form 2File: Form 2 - Suji Platinum as on Sept 2025.pdf | 5 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 - Suji Platinum as on Sept 2025.pdf | 5 Jan 2026 |
| Withdrawal Update Form 1File: Form 1 - Suji Platinum as on Sept 2025.pdf | 13 Nov 2025 |
| Withdrawal Update Form 2File: Form 2 - Suji Platinum as on Sept 2025.pdf | 13 Nov 2025 |
| Withdrawal Update Form 3File: Form 3 - Suji Platinum as on Sept 2025.pdf | 13 Nov 2025 |
| Withdrawal Update Form 1File: Form 1 - Suji Platinum as on June 2025.pdf | 16 Sep 2025 |
| Withdrawal Update Form 1File: Form 1 - Suji Platinum as on June 2025.pdf | 16 Sep 2025 |
| Withdrawal Update Form 2File: Form 2 - Suji Platinum as on June 2025.pdf | 16 Sep 2025 |
| Withdrawal Update Form 2File: Form 2 - Suji Platinum as on June 2025.pdf | 16 Sep 2025 |
| Withdrawal Update Form 3File: Form 3 - Suji Platinum as on June 2025.pdf | 16 Sep 2025 |
| Withdrawal Update Form 3File: Form 3 - Suji Platinum as on June 2025.pdf | 16 Sep 2025 |
| Form 1File: Form-1 March 2025.pdf | 14 Jul 2025 |
| Form 2File: Form-2 March-2025.pdf | 14 Jul 2025 |
| Form 3File: Form-3 March-2025.pdf | 14 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Inventory as on 31 march 2025.pdf | 14 Jul 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Dec 24 Updated (1)_compressed.pdf | 12 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 10 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 10 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 10 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Suji Platinum as on March 2024_compressed.pdf | 11 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Suji Platinum as on June 2024.pdf | 8 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Suji Platinum as on June 2024.pdf | 8 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf | 20 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4 Engineer’s Certificate on Cost Incurred on Project (Form 2) (1).pdf | 20 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1 CA Certificate on Project Cos.pdf | 20 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Suji Platinum as on March 2024.pdf | 16 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Suji Platinum as on Dec 2023.pdf | 16 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Suji Platinum as on March 2024.pdf | 16 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 -Suji Platinum as on March 2024_compressed (1).pdf | 16 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 -Suji Platinum as on March 2024_compressed (1).pdf | 16 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Suji Platinum as on Dec 2023_compressed.pdf | 16 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 -Suji Platinum as on March 2024_compressed (1).pdf | 16 Apr 2024 |
| Proforma of Agreement for saleFile: Model Agreement (1).pdf | 7 Dec 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: 22-23_231009_131523.pdf | 10 Oct 2023 |
| Other - TechnicalFile: 22-23_231009_131523.pdf | 10 Oct 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: output (13)_11zon (1).pdf | 29 Sep 2023 |
| Declaration about Commencement CertificateFile: FORMAT - D.pdf | 28 Sep 2023 |
| Proforma of Agreement for saleFile: AFS Model-Suji Platinum.pdf | 28 Sep 2023 |
| Proforma of Allotment letterFile: Allotment Letter-Suji Platinum.pdf | 28 Sep 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format 'A' - Declaration for separate Bank Account.pdf | 28 Sep 2023 |
| Deviation Report with respect to Allotment letterFile: DEVIATION REPORT - ALLOTMENT LETTER.pdf | 28 Sep 2023 |
| Deviation Report with respect to model copy of AgreementFile: DEVIATION REPORT - SALE AGREEMENT.pdf | 28 Sep 2023 |
| Copy of the legal title reportFile: 1 Copy of the legal title report (29).pdf | 22 Sep 2023 |
| Details of encumbrances concerned to FinanceFile: Encumbrance Letter- Finance.pdf | 22 Sep 2023 |
| Details of encumbrances concerned to FinanceFile: Encumbrance Letter- Legal.pdf | 22 Sep 2023 |
| Details of encumbrances concerned to LegalFile: Encumbrance Letter- Finance.pdf | 22 Sep 2023 |
| Details of encumbrances concerned to LegalFile: Encumbrance Letter- Legal.pdf | 22 Sep 2023 |
| Declaration in FORM BFile: FORM - B PROMOTER.pdf | 22 Sep 2023 |
| CERSAI detailsFile: Declaration on CERSAI.pdf | 22 Sep 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Suji Platinum.pdf | 22 Sep 2023 |
| Layout approvalFile: IOA PLAN_11zon.pdf | 6 Sep 2023 |
| Building plan approvalFile: IOA PLAN_11zon.pdf | 6 Sep 2023 |
| PAN CardFile: SHRADDHA PALTINIUM-PAN CARD.pdf | 6 Sep 2023 |
| Copy of Layout Approval (in case of layout)File: IOA PLAN_11zon.pdf | 6 Sep 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: IOA PLAN_11zon.pdf | 6 Sep 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: CC Dt 01-09-2023.pdf | 6 Sep 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 73 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Suji Platinum on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Hariyali- Vikhroli (East)6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 135 registered projects within 2 km.
Cons 1221 MIG T/S and 100 Shops S. No. 113 (pt
Mumbai Housing And Area Development Board
Om Siddhivinayak CHS and Gurukrupa CHS
Shreeji Developers
AKASSH AMAZONIA TOWER 1
HEER MEHTA LANDMARK DEVELOPERS PRIVATE LIM
Ajmera Solis
Shree Yogi Realcon Private Limited
CENTRAL PARK
V LAXMI NURSES DEVELOPERS LLP
Swastik Platinum
SUVASYA BUILDERS AND DEVELOPERS LLP
See every Mumbai Suburban project, with the district possession charts
Builder: Shraddha Platinum Builders and Developers
Shraddha Platinum Builders and Developers has 1 registration on MahaRERA, including Suji Platinum. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if Suji Platinum is delayed beyond 31 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Suji Platinum?
The registered promoter entity is Shraddha Platinum Builders and Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Suji Platinum?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Suji Platinum?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Suji Platinum?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Suji Platinum?
The professionals named in the filing: Architect: Archo Consultants; Engineer: Vinayak Chopdekar & Associates; Chartered Accountant: Pritam Nevrekar & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Suji Platinum?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback